Details of Experience Certificate issued
 
   
Search by Contract Division/Department/Agency/Designation:
Division Department
Agency
Designation
 
OR
Search by Date of Issue:

From: To: DD-MM-YYYY
LAST UPDATED ON:10-10-2024
FROM IP ADDRESS:10.64.24.25
Sl No. Designation Date of Issue Contract Agency Officer Division Department WorK Certificate
26 Sr.DEN/Co-ord/GTL 30-06-2020 M/s.M.Krishnarangaiah K.TULASEERAM GTL ENGG Guntakal Division : Guntakal: Maintenance, Repairs/replacement in respect of petty works in Staff Quarters, Station Buildings, Service Buildings etc., in ADEN/SW/GTL Jurisdiction for a period of one year Download
27 Sr.DEN/Co-ord/GTL 26-05-2020 M/s.Anusha Constructions K.TULASEERAM GTL ENGG Guntakal Division: Renigunta - Gooty section : Proposed construction of Road Under Bridge in lieu of LC no 167 ( Un-Manned) at Km 383/1-2 between Juturu-Vemulapadu stations and Proposed construction of Road Under Bridge in lieu of LC no 156 ( Un-Manned) at Km 351/0-1 between Regadipalli-Vanganur stations by Box pushing method Download
28 Sr.DEN/Co-ord/HYB 14-05-2020 M/s Afsar Riaz Construction Corporation Mothilal Bhookya Hyderabad Engineering Hyderabad Division: Elimination of Manned Level Crossing gate No.17 on SC-DHNE by providing RUB Download
29 Sr.DEN/Co-ord/GTL 01-05-2020 M/s.Mynd Infratech Company K.TULASEERAM GTL ENGG Guntakal Division -SW-I: Guntakal - Provision of first class waiting hall & separate waiting halls for Ladies & Gents. SW-II: - Guntakal - Provision of second class waiting hall & general stores, medicine & book stalls. SW-III: - Guntakal - Provision of ASM panel room, Electrical, S & T, Parcel office. SW-IV: - Guntakal - Proposed new booking office, concourse and new Platform. SW-V:- Guntakal - Repairs to platform for Road No.12 Download
30 Sr.DEN/Co-ord/GTL 01-05-2020 M/s.Mynd Infratech Company K.TULASEERAM GTL ENGG Guntakal Division: (SW-I): Guntakal-Repairs to existing boundary wall from Church line to Porter line, (SW-II):Guntakal: Repairs to existing compound wall in staff quarters at Twin and Church lines in South Colony and (SW-III):Repairs to existing platform flooring (safety border antiskid/edge chequered tiles) on island platform nos. 2 and 3 & 4 at Guntakal Station. Download
31 Sr.DEN/North/BZA 19-03-2020 D.Srinivas vijayawada Works/Branch/Engg/BZA Vijayawada Engineering BZA-VSKP section-RJY-Replacement of age old CI water tank with pre-stressed steel tank supplying water to station, waiting halls and platforms at RJY station Download
32 DIVISIONAL ELECTRICAL ENGINEER, MEMU CAR SHED, RAJAHMUNDRY 18-03-2020 Sri.M.Rupa Srinivas, S/o.M.Appa Rao, D.No.23-18-15/1, Lalitha Nagar, Rajahmundry. M.PRASADA RAO VIJAYAWADA ELECTRICAL(TRS) Cleaning/Up-keeping of MEMU Coaches and equipment of the coaches at MEMU Car Shed, S.C.Railway, Rajahmundry for a period of Two years. Download
33 DEN/Estates/HYB 24-02-2020 N. Bhaskar Rao K. Laxma Reddy Hyderabad Engineering 1. Proposed extension of dining hall with AC facility at Rail Kalarang premises including conversion of the exising shuttle court in to dining hall. 2 Repairs to existing colony roads and inside roads of service building at Diesal / Electrical Loco shed, Lekha bhavan, GOC, KCG, Mly etc. under the jurisdiction of ADEN/II/HYB. 3 Hyderabad Division - Provision of FATSETUP for ELS working in SCR at STTC/Moula ali. 4. Hyderabad Division: Repairs to roof leakage, joinery, m wall finishing of RPF ba Download
34 DEN/Estates/HYB 24-02-2020 N. Bhaskar Rao K. Laxma Reddy Hyderabad Engineering 1. Proposed extension of dining hall with AC facility at Rail Kalarang premises including conversion of the exising shuttle court in to dining hall. 2 Repairs to existing colony roads and inside roads of service building at Diesal / Electrical Loco shed, Lekha bhavan, GOC, KCG, Mly etc. under the jurisdiction of ADEN/II/HYB. 3 Hyderabad Division - Provision of FATSETUP for ELS working in SCR at STTC/Moula ali. 4. Hyderabad Division: Repairs to roof leakage, joinery, m wall finishing of RPF ba Download
35 DEN/Estates/HYB 24-02-2020 N. Bhaskar Rao K. Laxma Reddy Hyderabad Engineering 1. Proposed extension of dining hall with AC facility at Rail Kalarang premises including conversion of the exising shuttle court in to dining hall. 2 Repairs to existing colony roads and inside roads of service building at Diesal / Electrical Loco shed, Lekha bhavan, GOC, KCG, Mly etc. under the jurisdiction of ADEN/II/HYB. 3 Hyderabad Division - Provision of FATSETUP for ELS working in SCR at STTC/Moula ali. 4. Hyderabad Division: Repairs to roof leakage, joinery, m wall finishing of RPF ba Download
36 Divisional Electrical Engineer, MEMU Car Shed, S.C.Railway, Rajahmundry 27-12-2019 M/s. Venkata Trinadhulu Transport, No. 2-2A-1, Vidyanagar, Nidadavolu, W.G.dist. Divisional Electrical Engineer, MEMU Car Shed, S.C.Railway, Rajahmundry Vijayawada Division Electrical TRS, MEMU CAR SHED Transportation of Railway Material of MEMU Car Shed, S.C.Railway, Rajahmundry by road through private lorry transport agency for a period of Two years Download
37 Sr.DEN/Co-ord/HYB 16-10-2019 M/s D.R. Constructions Mothilal Bhookya Hyderabad Engineering (A) SC-DHNE : Elimination of unmanned LC No.229 at KM 556/300-400 by constructing RUB of size 1x4x4 by open cut method without approach cover. B) Hyderabad Division: SC-DHNE section: Provision of limited Height subway for eliminating level crossing gate No.123 Download
38 Sr.DEN/Co-ord/HYB 16-10-2019 M/s D.R. Constructions Mothilal Bhookya Hyderabad Engineering (A) SC-DHNE : Elimination of unmanned LC No.229 at KM 556/300-400 by constructing RUB of size 1x4x4 by open cut method without approach cover. B) Hyderabad Division: SC-DHNE section: Provision of limited Height subway for eliminating level crossing gate No.123 Download
39 Sr.DEN/North/HYB 04-10-2019 M/s Yogesh Constructions N. Srinivasa Rao Hyderabad Engineering SC-MUE: TFR- Through Fitting Renewal on PSC sleeper track from Km 461 to Km 491 for a total length of 30 kms 2) SC-MUE Section: Through weld renewal (TWR) for a total length of 16.60 kms (from 373.40 to 390.00) ( Ancillary works for carrying through weld renewal). Download
40 Sr.DEN/Co-ord/HYB 29-08-2019 M/s Alam Constructions Mothilal Bhookya Hyderabad Engineering HYB-Division: Elimination of unmanned LC No.53 at Km 05/0-100 on SC-DHNE section and unmanned LC No.6JB at KM7/800-900 on JKM-BDHN section duly constructing RUB by open cut method Download
41 Sr.DEN/Co-ord/HYB 31-10-2019 V. Narasimha Mothilal Bhookya Hyderabad Engineering HYB Divn: Elimination of 5 ( Five ) Manned level crossing gates on SC-DHNE section by providing RUBs ( LC gates Nos 32, 36, 37, 41 and 46 ) two packet system. Download
42 Sr.DEN/Co-ord/HYB 30-07-2019 M/s Obul Reddy Constructions Mothilal Bhookya Hyderabad Engineering 1) Proposed for construction of boundary wall to prevent encroachments at MBNR, WPR & GWD stations. (2) Proposed for construction of boundary wall to prevent encroachments at DUU & VDI stations. Download
43 Sr.DEN/Co-ord/HYB 09-07-2019 Sri D. Mahender Reddy Mothilal Bhookya Hyderabad Engineering SC-DHNE Section: Through weld renewal of (TWR) for total length of 104.00 Kms from 60/0 to 106/0 and from Km128/0 to 186/0 (Ancillary works for working of Mobile Flash Butt Welding Plant Download
44 Sr.DEN/North/BZA 28-01-2019 M/S.R.K.Construction Works/Branch/Engg/BZA Vijayawada Engineering BZA-VSKP section-Providing house keep[ing and maintenance services for officers rest house and sub-ordinate rest house at RJY in SSE/works/RJY section for a period of 24 months. Agt.No.26/Sr.DEN/N/BZA/2016 Dt.28.11.2016 Download
45 Sr.DEN/North/BZA 29-01-2019 Sri.K.Ashok Kumar Works/Branch/Engg/BZA Vijayawada Engineering BZA-VSKP section-(UP & Dn) SW-I-TRR(P) up line km.633.500 to 633.900 = 400mtrs SW-II-TRR(S) Km.713.179 =0.60km REG Dn loop line in SSE/P.Way Tuni section SW-III-TFR 4.50Km up line Km 620.00 to 624.50 bet SLO-MPU stations SW-IV-TBR-Throhg ballasting of track along with deep screening by BCM for a total length of 8.60 Kms SW-V-TFR-Through renewal of fittings on PSC sleeper track fo a total length of 4.772 Kms SW-VI-TTR(Rails)-Through turnout railsrenewal of existing52/60 kg switches, lead rails an Download
46 Sr.DEN/North/BZA 28-01-2019 Sri.D.Krishna Murthy Works/Branch/Engg/BZA Vijayawada Engineering BZA-VSKP section-SW-I-Proposed safety related track maintenance works betwwen PUA-NDD stations in SSE/P.way/TDD section SW-II-Proposed safety related track maintenance works betwwen NDD-KYM stations in SSE/P.way/RJY section of ADEN/RJY sub-divisionB/W.506/XIII/1858/Plg dt.17.3.2016 Rs.10428535/-Agt.No.25/Sr.DEN/N/BZA/2016 Dt.28.11.2016 Download
47 Sr.DEN/North/BZA 04-01-2018 Sri.J.Srinivasa rao Works/Branch/Engg/BZA Vijayawada Engineering RJY-Provision of TURN TABLE for turning of orientation of MEMU CAR shed Agt.No.5/Sr.DEN/N/BZA/2014 dt.4.3.2014 Download
48 Sr.DEN/North/BZA 13-12-2018 Sri.Ch.Venkateswara Rao Works/Branch/Engg/BZA Vijayawada Engineering BZA-VSKP section-Replacement of damaged AC sheet roofing on AKP platform No.1 & 2, BVM PF No.1 & 2 and KSK halt stations in SSE/Works/TUNI section under ADEN/TUNI sub-division SW-II-Repairs to service Buildings due to badly damaged by the 'HUD HUD' cyclone at YLM, AKP, KSK & BVM stations and running room, TTE's rest house, ORH/VSKP in SSE/Works/TUNI section in ADEN/TUNI sub-division SW-III-Repairs to staff Qrs. due to badly damaged by the 'HUD HUD' cyclone at TUNI, YLM, AKP, KSK & NRP stations i Download
49 Sr.DEN/North/BZA 19-11-2018 Sri.K.Konda Raju Works/Branch/Engg/BZA Vijayawada Engineering SW-I-NDD-Repairs to roof slabs of staff Qrs, broken drop walls, stair case walls, dropped ceilings, pealed off plasterings, cony draind and damaged sanitory fittings in staff colony SW-II-NDD-Repairs to roof slabs of station building, circulating area, greenary and brightening to exterior and interior srface in view of Godavari pushkarams-2015 SW-III-RJY, GVN & KVR-Provision of hydrant pipe line and carriage watering arrangements for Godavari Pushkarams-2015 SW-IV-ADEN/SLO sub-divn-Repars to app Download
50 Sr.DEN/North/BZA 09-11-2018 Sri.G.Venkateswara Reddy guntur Works/Branch/Engg/BZA Vijayawada Engineering BZA-VSKP Section-SW-I-Provisiion of structural height gauges at L.C.Gates in SSE/P.Way/TDD section SW-II-Provisiion of structural height gauges at L.C.Gates in SSE/P.Way/RJY section SW-III-Provisiion of structural height gauges at L.C.Gates in SSE/P.Way/SLO section SW-IV-Provisiion of structural height gauges at L.C.Gates in SSE/P.Way/PAP section SW-V-Provisiion of structural height gauges at L.C.Gates in SSE/P.Way/TUNI section SW-VI-Provisiion of structural height gauges at L.C.Gates in SSE/P.W Download
26  _  50 of 2360 records << Prev    | Next >>    | Last >>