Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

Citizen Charter

Trains & Timings

Passenger Services / Freight Information

Public Information

Tenders

Contact Us

About Us
   Divisions
      Hyderabad
         Gati Shakti HYB Division


 
Bookmark Mail this page Print this page
QUICK LINKS
Gati Shakti HYB Division


Note: To view in Hindi Version, Click on this link. 

GATI SHAKTI UNIT

HYDERABAD DIVISION

SOUTH CENTRAL RAILWAY


The Railway Board had approved setting up of Gati Shakti Units (GSUs) in all Divisions of Indian Railways during July 2022 to fast track the construction works required to remove bottlenecks in operations and improve mobility that would lead to increased cargo loading. Accordingly a Gati Shakti unit is formed in HYB Division and is established at 2nd floor of Lekha Bhavan.

Divisional Gati Shakti Unit shall be responsible for planning and execution of following works:

  1. Carrying out feasibility study followed by preparation of Detailed Project Report for further consideration of the Railway Board.

  2. Station Redevelopment.

  3. Plan Head 53: Customer Amenities.

  4. Plan Head 16: Traffic Facilities.

  5. Plan Head 29: Road Safety and level crossing.

  6. Plan Head 30: Road Under Bridge (RUB) and Road Over Bridge (ROB).

  7. Plan Head 33: Signal and Telecommunication such as EI, RRI including in private siding.

  8. Plan Head 36: Provision of Escalator and lifts.

  9. Plan Head 42: Workshop including production unit work.

  10.  All siding works and deposit work.

  11. Electrification of sidings, workshops & small leftover RE patches.

  12. All coal connectivity projects/port connectivity works under different Plan Head (confined within the divisional boundary).


Organisational Setup and Staff Position



Details of staff working in Gati Shakti - Hyderabad Division

S.NO

Name

(Sri/Smt./Kum)

Designation

1

Ashok Kumar Singh

Chief Project Manager/GS/HYB

2

P Sivaram

Dy.Chief Engineer/GS/HYB

3

K Nathanael

ADEN/GS/HYB

4

A Avinash

SSE/Drg/GS/HYB

5

K S Raja Reddy

SSE/W/GS/HYB

6

Zeeshan Ahmed

SSE/W/GS/HYB

7

G Mahima Evangeline

JE/Drg

8

D Divyatej Phanindra

Stenographer/GS/HYB

9

S Manohar

Sr.Clerk





Details of Re-engaged Retired Railway Staff in Gati Shakti/HYB

S.No

Name 

(Sri/Smt./Kum)

Designation

1

D Prasada Rao

SSE/Works

2

B Venkateswara Rao

SSE/Works

3

N S M Reddy

SSE/Drg






Works allotted and Progress


Plan Head

No of works allotted

Total Value in Rs.

PH 1600 (Traffic Facility)

3

28.68 cr

PH 3000 (ROB/RUB)

14

335.71 cr

PH 4200 (Workshop)

2

23.49 cr

PH 5300 (Passenger Amenities)

1

0.72 cr

Bye Pass Works (FLS)

1

0.05 cr

Station Redevelopment works (Feasibility Study)

1

0.55 cr


Total

22

389.20 cr


Status / Progress of works


PH 1600 (Traffic Facility)

S.No.

Name of work

Year of Sanction

Estimated Cost

Present Status

1

Nizamabad-Remodelling of yard arrangements for providing additional platforms and one full length dead end spur.

2018- 19

Rs.8.7984 cr

ESP under revision in view of Doubling

Nizamabad- Provision of additional loop line (pro rd 6) in lieu of dead end spur along with electrification and modification of existing OHE arrangements of GL-1(Rd-5) & GL-2(Rd-4) 

2023-24

Rs.8.97 cr

2

Nizamabad Byepass line

Byepass line at Nizamabad junction station (1.548km) for connecting Nizamabad-Secunderabad & Nizamabad-Peddapalli Main line of south central railway 

2023-24


(RB sanction on 29.02.2024)

Rs.121.97 cr

Process for land acquisition in progress

3

Janakampet Jn-Provision of two Additional loop lines to cater the operational needs.

2021-22

Rs.11.3062 cr

Commissioned Feb 2024


4

Falaknuma - Provision of DN loop line (Standard Double line layout).

2021–22

Rs. 8.5721 cr

Commissioned Dec 2023

PH 5300 (Passenger Amenities)

1

Kamareddi-Provision of 02 no.s of Lifts at Kamareddi station.

2021–22

Rs. 0.72 cr

Commissioned Feb 2023



PH 3000 (ROB/RUB works)

S.No

PB No.

Name of work

Year of Sanction

Present Status

1

121

RUB near Safilguda lane in lieu of LC No 254

2001-02

LC is physically closed. PCE sanction is under process.

2

145

ROB between Dichpally - Nizamabad two lane in lieu of LC No 193

2012-13

Work in progress

3

234

ROB between Falaknuma - Budvel four lane in lieu of LC No 7

2018-19

Work in Progress

4

232

ROB between Timmapur - Shadnagar four lane in lieu of LC No 27

2018-19

Work in progress

5

238c

Proposed ROB as 1x46.00M clear span composite steel girder at Km 166/500-600 in lieu of Existing Manned LCNo.90A between Wanaparthy road and Sriramnagar stations.

2019-20

GAD under HQ approval.

6

238d

Sec-bad-Mudkhed- ROB in lieu of LC 228  Wadiyaram Yard-Masaipet at  Km 555/3-4.

2019-20

GAD under HQ approval (19.02.2024)

7

238g

Sec-bad-Mudkhed-ROB @ LC No.209 A uppalvai-Kamaredddi

2019-20

GAD Approved by HQ. Approach road estimate awaited from State govt (19.02.2024)

8

238h

Jankampet-Bodhan- ROB @ LC No. 12JB at km 12/5-6

2019-20

This LC is falling on National Highway, state govt has been advised that this ROB shall be made by MoRTH as per policy.

9

238j

Jankampet-Bodhan- ROB @ LC No. 18JB at km 19/1-2 (Bodhan Yard)

2019-20

GAD approved by HQ. State govt has to submit a detailed estimate for the approach road. (26.09.2023)

10

DP

Addl. ROB @ side ofexg. ROB No. 46 (SC - DHNE)

km15/1-3


Work in progress


11

238e

ROB @ 2/MLY Dayanandnagar - Moula Ali (SC - MUE) at Km. 1/700-800


2019-20

GAD approved by HQ. Approach road estimate awaited from State govt. (23.02.2024).

Alignment plan for LHS awaited from State Govt.(04.08.2023)



PH 4200 (Workshop work)

S.

No.

Name of work

Year of Sanction

Estimated Cost

Present Status

1

Integrated Bogie Assembly and Disassembly for LGD shops.

2019-20

Rs. 15.15 cr

works completed. 


PH 1600 (Traffic Facility – process for sanction)

S.

No.

Name of work

Present Status

1

Kacheguda Yard Remodeling for Increasing of CSRs of road no.3, 4 & 5 to accommodate full length coaching/freight trains and with PF for 24 coach length train duly extending Bridge No.17.

DPR (Rs.66.94 cr) Submitted 

Sanction awaited







Station Redevelopment Works

S.

No.

Name of work

Present Status

1

KCG Station - Redevelopment of station

  • Inception Report (KD1,16.09.2022) submitted by Agency

  • Preliminary Report, Land Development Report & Infrastructure Development Report (KD2, 15.10.2022) submitted by Agency

  • Concept Plan (KD3,17.11.2022) submitted by Agency

  • Agency has made its first presentation on the concept plan (master plan) on 02.12.22 to DRM & Branch officers. 

  • The point raised by Railways incorporated by the agency and KD3 PPT sent again (18.01.2023)

  • DRM along with branch officers and representative of agency has done detailed inspection on 25.01.2023 and advised few more points to include.

  • Agency submitted KD3 on 25.02.2023 duly incorporating points raised during inspection on 25.02.2023

  • Approved KD3 report submitted to HQ on 06.05.2023 for approval.

  • Agency made presentation to GM & PHODs on 17.05.2023 & 17.08.2023

  • Revised KD3 submitted to HQ on 01.12.2023. 

  • Presentation made to GM & PHODs on 04.01.2024, the observations raised attended by agency. 

  • KD3 approved on 14.02.2023

  • DPR from consultant awaited.



List of Stations selected under “Amrit Bharat Station Scheme” - HYB Div

S.No

Name of the station

Total Cost

(Crs)

1

Umri

7.72

2

Dharmabad

30.02

3

Basar

11.33

4

Nizamabad

53.03

5

Kamareddi

39.84

6

Medchal

32.11

7

Malkajgiri

27.61

8

Malakpet

36.44

9

Yakutpura

8.53

10

Huppuguda

26.81

11

Umdanagar

12.37

12

Shadnagar

32.99

13

Jadcherla

35.54

14

Mahabubnagar

39.82

15

Gadwal

34.29

16

Sri Bala Brahmeswara Jogulamaba

6.07

17

Kurnool City

42.62

18

Medak

15.32

19

Kacheguda

DPR under preparation


List of stations where 12 meter Foot Over Bridge Proposed

Sl. No.

Name of the station

1

Dharmabad

2

Nizamabad

3

Kamareddi

4

Medchal

5

Malkajgiri

6

Malakpet

7

Huppuguda

8

Shadnagar

9

Jadcherla

10

Mahbubnagar

11

Gadwal

12

Kurnool Town


List of LC gate where feasibility study is in progress for proving Road Over Bridge/ Road Under Bridge

Sl. No.

LC No.

LC Location

Between Station

Secunderabad- Dhone Section

1

133

245/200-300

Kurnool Town (KRNT)-Dupadu (DUU)

2

60A

115/400-500

Mahbubnagar (MBNR)-Manyamkonda (MQN)

3

61

115/700-800

4

79

147/300-400

Devarkadre (DKC)-Kaukuntla (KQQ)

5

104

196/500-600

Poodoor (PDO)-Itikyala (IKI)

6

70

131/001-100

Manyamkonda (MQN)- Devarkadre (DKC)

7

84

154/400-500

Kaukuntla (KQQ)- Wanparti Road (WPR)

8

93

171/800-900

Wanparti Road (WPR)- Sriramnagar (SRNR)

9

94

173/900-174/0

Wanparti Road (WPR)- Sriramnagar (SRNR)

10

95

176/400-500

Sriramnagar (SRNR)-Gadwal Jn. (GWD)

11

98

186/500-600

Sriramnagar (SRNR)-Gadwal Jn.(GWD)

12

103

194/800-900

Gadwal Jn. (GWD)- poodoor (PDO)

13

111

208/300-400

Itikyala (IKI)-Manopad (MOA)

14

142

260/400-500

Dupadu(DUU)-Ulinda Konda (UKD)

15

145

265/500-600

Ulinda Konda (UKD) - Veldurti (VDI)

16

149

271/000-100

Ulinda Konda (UKD) - Veldurti (VDI)

17

155

278/500-600

Veldurti (VDI)- Bogolu (BVO)

Secunderabad- Mudkhed

18

188

445/0-50

Basar (BSX)-Navipet (NVT)

19

190A

455/100-200

Navipet (NVT)-Jankampet (JKM)

20

192

459/200-300

Jankampet (JKM)-Nizamabad (NZB)

21

196

473/700-800

Dichpalli (DHP)-Indalvai (IDL)

22

198

482/900-483/0

Indalvai (IDL) -Sirnapalli (SCP)

23

211

516/700-800

Kamareddi (KMC)-Tadmadla (TMD)

24

236A

571/400-500

Masaipet (ME)-Manoharabad (MOB)

25

165

390/700-750

Sivangoan (SVN)- Umri (UMRI)

26

179

420/750-800

Karkheli (KEK)-Dharmabad (DAB)

27

201

489/800-900

Indalvai (IDL)-Sirnapalli (SCP)

28

242A

588/900-589/0

Manoharabad (MOB)-Medchal(MED)

29

166

392/400-500

UMRI-Bolsa (BLSA)

30

172

407/600-500

Karkheli (KEK)-Dharmabad (DAB)

31

174

410/200-250

Karkheli (KEK)-Dharmabad (DAB)

32

178

419/900-950

Karkheli (KEK)-Dharmabad (DAB)

33

182

430/450-500

Dharmabad (DAB)-Basar (BSX)

34

183

435/400-500


Basar (BSX)- Navipet (NVT)

35

185

438/600-650

36

205

500/400-500

Sirnapalli (SCP)-Uppalwai(UPW)

37

206

502/500-600

Uppalwai  (UPW) -Kamareddi (KMC)

38

235

570/0-100

Masaipet (ME)-Manoharabad (MOB)

39

255

616/700-800

Cavalry barracks (CVB)-Malkajgiri (MJF)

40

1JB

3/800-900




Jankampet Jn (JKM)-Bodhan (BDHN)

41

5JB

6/900-7/0

42

7JB

8/700-800

43

9JB

9/700-800

44

10JB

10/600-700


Brief On Proposed Amrit Stations 1.0 over Hyderabad Division - Click on the link

<><><<><><><>




Source : South Central Railway CMS Team Last Reviewed : 27-05-2024  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.