GENERAL SERVICES (As on 01.04.23)
VISION
The vision of GENERAL SERVICES is to provide safe, reliable, sustainable and efficient Electric Power supply for all Railway installations along with provision of passenger and staff amenities over south-central railway.
ABOUT US
This wing of Electrical department deals with maintenance of uninterrupted power supply to all electrical installations.
General : Organization

DIVISIONS
1. SECUNDERABAD DIVISION
Secunderabad Division has 162 Nos of electrified stations with connected load of 45518KW to cater the needs of passenger’s and fright traffic requirements.
https://scr.indianrailways.gov.in//view_section.jsp?id=0,1,291,357,810,949
2. HYDERABAD DIVISION
Hyderabad Division has 96 Nos of electrified stations with connected load of 35537KW to cater the needs of passenger’s and fright traffic requirements.
https://scr.indianrailways.gov.in//view_section.jsp?lang=0&id=0,1,291,355,1000
3. VIJAYAWADA DIVISION
Vijayawada Division has 150 Nos of electrified stations with connected load of 35476KW to cater the needs of passenger’s and fright traffic requirements.
https://scr.indianrailways.gov.in/view_section.jsp?fontColor=black&backgroundColor=LIGHTSTEELBLUE&lang=0&id=0,1,291,358,1061,2560
4. GUNTAKAL DIVISION
Guntakal Division has 155 Nos of electrified stations with connected load of 38380 KW to cater the needs of passenger’s and fright traffic requirements.
https://scr.indianrailways.gov.in//view_section.jsp?lang=0&id=0,1,291,353,1280,1350,1440
5. GUNTUR DIVISION
Guntur Division has 76 Nos of electrified stations with connected load of 7194KW to cater the needs of passenger’s and fright traffic requirements.
https://scr.indianrailways.gov.in/view_section.jsp?lang=0&id=0,1,291,354,1040,2445
6. NANDED DIVISION
Nanded Division has 105 Nos of electrified stations with connected load of 9291KW to cater the needs of passenger’s and fright traffic requirements.
https://scr.indianrailways.gov.in//view_section.jsp?lang=0&id=0,1,291,356,1114
WORKSHOPS
7. Carriage Repair Shop, Lalaguda (LGDS)
Carriage repair shops at Lallaguda with connected load 18258 KW is caters the requirements of repairs of carriages.
https://scr.indianrailways.gov.in/view_section.jsp?fontColor=black&backgroundColor=LIGHTSTEELBLUE&lang=0&id=0,1,516,655,1576
8. Wagon Workshop, Guntupalli (WWS/GTPL)
Wagon Workshop at Guntupalli with connected load 14314 KW is caters the requirements of repairs of carriages.
https://scr.indianrailways.gov.in/view_section.jsp?lang=0&id=0,1,516,656
9. Carriage Repair Shop, Tirupathi (CRS/TPTY)
Carriage repair shops at Tirupati with connected load 8100 KW is caters the requirements of repairs of carriages.
https://scr.indianrailways.gov.in/view_section.jsp?lang=0&id=0,1,516,657
Activities:
·Power supply arrangements to Railway installations i.e. Stations, Service buildings, quarters, Workshops, loco sheds and LC gates etc.
·Maintenance and operation of electrical installations such as Substations, D.G. sets, Lifts, Escalators, pumps, AC plants, Water coolers, high masts, solar power plants etc.
·Monitoring of energy conservation measures and implementation of new emerging technologies in energy conservation towards contributing ambitious renewable energy targets set by the nation.
Achievements:
Various measures are being undertaken for effective energy conservation with emerging technologies. They include the use of energy efficient lamps, provision of LED fittings, provision of BLDC fans, Inverter type ACs, VVVF drives, segregation of essential & non-essential loads at stations, automation of pumps, star rated equipment, electrification of Railway stations and gate lodges using non-conventional sources of energy, solar water heaters at Running rooms/Hospitals/Rest houses, Natural day light pipe systems at service buildings/workshops etc.
I. Non Traction Specific Energy consumption:
Year | 19-20 | 20-21 | 21-22 | 21-22 (upto Jan) | 22-23 (upto Jan) | |
Energy Consumption in MU | 127 | 105 | 116 | 97.9 | 104.6 | |
Connected Load in MW | 188 | 194 | 199 | 197 | 212 | |
SEC in kWh/kW | 678 | 542 | 584 | 496 | 493 |
% variation in SEC w.r.t previous year | - | -20.14% | 7.89% | - | -0.55% |
SEC improved by 0.55% despite of increased 7.5% of Connected Load |
II. Railway Board Target Action Plan items:
Railway board Action plan item | Target for 22-23 | FY22-23 Progress upto 28.02.23 | Cumulative total |
LIFTS | 33 Nos. | 11 Nos. | 133 Nos. |
Escalators | 8 Nos. | 04 Nos. | 70 Nos. |
No of New stations to be provided with either Lift or Escalator | 02 Nos. | 03 Nos. (Raichur, Tandur, Vikarabad) | - |
Solar plants | 1 MW at 75 Stations (CAPEX mode) | 945 kWp commissioned. | 8921 kWp |
