Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

Citizen Charter

Trains & Timings

Passenger Services / Freight Information

Public Information

Tenders

Contact Us

About Us
   Divisions
      Guntakal
         DEPARTMENTS
            SAFETY
               Safety performance


 
Bookmark Mail this page Print this page
QUICK LINKS
Safety performance

Safety performance:

1. Comparative statement of accidents :

Year

No. of Derailments (Including SPAD &Unusual)

LC Gate Open Cases

 

2020- 21

08

22.03.21 -NDZ -SPAD

09.03.21 -TPTY Yard- Loco derailment

31.12.20 - DMM Yard (hitting buffer stop)

27.10.2020 -PDL (SPAD)

03.07.2020-MYL-PDL (derailment)

27.06.2020-MBCY /YAsiding (hitting a car)

23.05.2020-VRN yard (derailment)

21.04.2020-RU yard(derailment)

 

NIL

2021- 22

(as o­n 14/06/2021)

02

09.04.2021 SPAD @ YDLP BP-4 signal

12.04.2021 PNM (Yard derailment)

 

NIL

Accident details2020-21

SPAD : 02

 

S.

no

DATE

BRIEF DETAILS

Cause

PUNISHMENT IMPOSED

1

22.03.21

SPAD at NDZ

@

01.15 hrs

 

Tr no TEMPreceived o­n Up M/line.S-3 starter Passed at Danger at 01.15hrs

 

Signal Passed at Danger

 

Primary responsibility:

 

1) K.M.Mohana Krishna- LP/NRE- Reduction to lower grade of LP Shunter for a period of 02 years (NR)

 

1) M.SuryaNarayana – ALP/NRE. -Reduction to lower grade offor a period of 03 years (NR)

 

Blameworthy :

K Ram Mohan – CLI/NRE

Reduction to lower stage by o­ne stage in the present timescale of pay for 06 months (NR)

 

 

 

 

2

27.10.20

SPAD at PDL

@

19.21hrs

 

On 27.10.2020 Loco pilot of Train No. VPU/SPL withLoco No-11394/WDM/3D/

GTL passed Home Signal No S 60 of PDL (Pendekallu) station at ‘ON’ position and stopped the train after passing 41.5 mtrs beyond Home signal.

 

Fail to stop the train before Home signal

 

PrimaryResponsibility :

1) Sri. C. Isaq - LP /M/GTL - Reduction to Shunter for 02 years (NR)

2) Sri.Anand Kumar Naik – ALP/GTL -Reduction to lower stage for 03 years (NR)

Secondary Responsibility

1) Sri. C.H.L.P.S . Kumar –CLI/GTL- Reduction to lower stage in the present time scale of pay for a period of 06 months (NR)

2) SriK.S. Mani – CLI/GTL- Reduction to lower stage in the present scale of pay for a period of 06 months (NR)


 

Train Accidents 2020-21(Consequential Accidents):02

 

S.

no

DATE

BRIEF DETAILS

Cause

PUNISHMENT IMPOSED

1

21.04.20

RU yard

05.52 hrs

Train No. CHJD Goods with Loco No.23706+23683/AJJ, while rolling into RU o­n Road No.08 North end four wagons 20,21,23&24 from TE derailed at Point No.-25A at RU Yard

Uneven/irregular loading in wagons at KOU siding

Staff responsibility :

Primary :

M/s GIMPEX Loading agency at KOU for uneven loading.

Rs. 4,45,140 cost of damages raised against the M/s GIMPEX Private Limited.

Blameworty :

M. BalajiNagraj-CGSR/KOU –Warned

TI/RU – Sri Jayant Kumar – Warned

CCI/RU – Sri. M. Jagan Mohan- Warned

2

03.07.20
MYL-PDL
@ 09.35 hrs

On 03.07.20 the Train No SA with locos 12086+12082 while negotiating Caution order spot at KM 314.14 in the mid section between MYL-PDL, 6th wagon from Train Engine WCR BCNAHS 31131114120 was derailed. Due to track unevenness, the leading LH wheel climbed o­n to rail table and resulted in derailment.

Track defect.

Staff Responsibility :


Primary: Sri Vijay Chandra Gusain - SSE/P Way/DHNE

AIWH for a period of 01 year (NR)


Secondary: NIL


Blameworthy: Sri AS Rama Kumar -SSE/P Way/DHNE

Imposed with penalty of “Censure”.


YARD ACCIDENTS: 02

S.

no

DATE

BRIEF DETAILS

Cause

PUNISHMENT IMPOSED

1

23.05.20

VRN

11.32 hrs

 

While attaching the CLE Nos13425 +13637 /G3A/KYN to Train No. Steel Loco No.13425 bumped the first wagon No. SECR BOOST No.21141231436 resultinginto derailment of leading pair of front trolley of Wagon No SECR BOOST o.21141231436 (1stwagon from TE)

 

Cause : LP bumped the formation resulted in derailmen

Primary responsibility :

 

1)T. Jayaramudu -LP/Goods/GY

AIWH for o­ne year (NR)

 

Secondaryresponsibility:

 

1)MukeshMallick,Pointsman-

Withholding of 02 set of Privilage Pass for 2020.

 

2) YPR Prasad- ALP/GY-AIWH for 06 Months NR

 

Blameworthy : T. Jayaramulu- Goods Guard- “Severely warned”

 

2

09.03.21

TPTY yard

@

16.38 hrs

 

On 09.03.21, at TPTY while backing T.No.02763 rake from pit line to platform Diesel Loco got derailed at Point No. 158B shunting neck at TPTY Yard.

 

Cause: Suspecting insufficient ballast and cushion underneath the new laid track.

 

Staff responsibility

 

Sri. J. Mallikarjuna Reddy,

SSE/P.Way/C/TPTY

Imposed with penalty of “Censure”.

 


Miscellaneous/Unusual -2020-21 :02

S.

no

DATE

BRIEF DETAILS

Cause

PUNISHMENT IMPOSED

1

31.12.20

DMM

yard

@

17.00 hrs

 

At DMM o­n 31.12.2020 at about 17.00 hrsTower car no NR 200011 hitted Buffer stop o­n Road-8 PAK End

 

Cause : Tower car moved back and hitted Buffer stop due to negligency of Tower car Driver to apply Parking Brakes while CAB changing

Enquiry proceedings accepted by Sr.DSO o­n 11.01.21

Staff responsible:

Primary :

Sri P. Bhaskar, LP/Goods/SC

Imposed penalty of withholding of o­ne set of PTO for year 2021.

 

2

27.06.2020

MBCY siding

10.05 hrs

 

CLE 12752+70621/WDG4/KZJ/27/07

while coming from MBCY siding to YA station hit a car while passing through unmanned LC gate No.03 at KM. No. BCCL/1/21 at 10:05 hrs.

 

Cause :

Road user did not notice LC gate properly in absence of road signage board, speed breaker and proper approach road. LP of the train did not follow the caution order of “stop, look out and proceed”. Since the train could not be stopped car collided with the Loco and was dragged for about 74 meters.

 

Primary:

 

MBCY Siding authorities for not maintaining the standards at unmanned LC.

Secondary :

1- Sri Samir Kumar Dwivedi. LP/Goods/GY- AIWH for o­ne year (NR)

2- Sri B.Madhu Mahesh, Sr.Goods Guard/GY- “Severely Warned”

3- Sri D. VenkataSaiKiran, ALP/GY-AIWH for o­ne year (NR)

Blameworthy:

1-Sri Mahesh Ravidas, Dy.SS/YA-”Warned”

2- Sri AG Sreepathi, CLI/GY- “Censured”

3- Sri D. Narasimha Reddy, TI/HX-”Warned”

 

Accident details2021-2022

(From April 2021 to 15th June 2021)

SPAD: 01

 

S.

no

DATE

BRIEF DETAILS

Cause

PUNISHMENT IMPOSED

1

09.04.21

SPAD at YDLP

@

14.38 hrs

 

CLE12227+70509 /UBL/WDG4--BP-4 starter Passed at Danger at 14.38hrs

 

Signal Passed at Danger

Primary Responsibility

 

1-Sri. Anup Kumar LP /RC –

Reduction to Lower /Grade for period of 02 years.(NR)

 

2-Sri. PankajKumar:ALP/RC -Reduction to Lower /Grade for period of 03 years.(NR)

 

 

Secondary

 

1) Sri. Nanda Lal Meena

DY.SS/YDLP/By pass Cabin- AIWH for 03 months NR

 

Blameworthy

1)Sri.Sri. K.Madhusudhan-CLI/RC,

AIWH for 06 months (NR)

 

2) B Nagaraja-CLI /RC -

Reduction to rower stage by o­ne stage in the present time scale of pay for a period of 06 (six) months without having effect o­n postponing future increments” was imposed o­n 06.05.2021

 

 Train Accident:NIL

Yard Accident: 01

S.

no

DATE

BRIEF DETAILS

Cause

PUNISHMENT IMPOSED

1

12.04.21

at

PNM

 

On 12.04.21

T.No.BOX-N,/12036+12034 WDG4 Train received o­n Rd-2 further for placement in loading line while backing to JSWT siding 5thfrom TEat PNM Station at14:10 o­ne truck all wheels were derailed .

 

The Siding linenot

Maintained properly by JSW authorities.

 

Inquiry report received and finding

reports sent to concern department for

necessary action (Sr. DCM, Sr.DOM&

Sr. DEN-Co-Ord)

 




Source : South Central Railway CMS Team Last Reviewed : 18-06-2021  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.