Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

Citizen Charter

Trains & Timings

Passenger Services / Freight Information

Public Information

Tenders

Contact Us

About Us
   Departments
      Engineering OL
         Bridge Policy Letters & Instructions
            Hqrs Letters


 
Bookmark Mail this page Print this page
QUICK LINKS
Hqrs Letters

Back

S. No.

Letter No.

Subject

Issuing Authority

Date

Link

1

W.287/RUB-Drainage

Drainage problems at RUBs

CE/RSW

07-10-2020

Click Here

2

W.71/Br.L/P/9/Vol-VIII

Measurement of Camber in Steel & PSC Girders.

CBE

22-02-2021

Click Here

3

W.71/BR/Bridge Policy

Execution of RUB/Bridge works with BOX Pushing method – Use of Rail Clusters for safety.

CBE

16-03-2021

Click Here

Standard Drawing for Rail Cluster

CBE

26-03-2021

Click Here

Standard Drawing for RSJ Cluster

CBE

26-03-2021

Click Here

4

W.71/Br.L/Genl/Corresp/ Vol-II

Bridge Inspection – Bridges under ORN-2 & 3 categories.

CBE

03-05-2021

Click Here

5

W.71/BR/Bridge Policy

Repairs to Spalling in RCC slabs

CBE

02-06-2021

Click Here

6

W.71/Br.L/Genl.

Attention to RUB/Bridge Rebuilding locations

CBE

07-06-2021

Click Here

7

W.363/P/Vol.XIV

Monsoon Precautions – Special Drive on clearing of drains

CTE

07-06-2021

Click Here

8

W.71/BR/Bridge Policy

Pre-inspection checks of Bridges and submission of Reports for statutory inspection of new sections by CRS

CBE

22-06-2021

Click Here

CBE

30-03-2022

Click Here

9

W.71/BR/Bridge Policy/ Vol.II

GNT Division - Replacing of existing Stone Top Culverts with RCC Boxes between Gajjelakonda – Diguvametta stations.

CBE

09-08-2021

Click Here

10

W.71/BR/Bridge Policy/ Vol.II

Arrangement of Traction mast on abutment of bridges – letter addressed to RDSO.

CBE

20-08-2021

Click Here

11

W.287/LC/Policy/VIII

Construction of RUB/Subways – SAG Level certification for Drainage – reg

PCE

02-09-2021

Click Here

12

W.544/I/Vol/VIII

Standard Operating Procedure (SOP) for responding to Natural Disasters – Instructions for effective use of SOP.

CE/WS&F

21-09-2021

Click Here

13

W.71/BR/Bridge/Policy/ Vol.II

Construction and maintenance of Cover Over Platforms and FOBs – reiterated instructions dated 25-04-2016

CBE

28-09-2021

Click Here

14

W.71/BR/Bridge/Policy/ Vol.II

Provision of 5.15m deck width in ballasted deck bridges – reg

CBE

08-10-2021

Click Here

15


Points noted during CBE’s Conference held at IRICEN/Pune on 2nd & 3rd Dec – 2021.

CBE

02-12-2021

Click Here

16

W.71/BR/Bridge Policy/ Vol.II

Open Foundations – Keying into Rock and Provision of Steel Rock Anchorages.

CBE

22-12-2021

Click Here

17

W.71/BR/Bridge Policy/ Vol.II

Provision of filter media behind boulder filling at Abutments, Wing walls, Retaining walls – reg

CBE

29-04-2022

Click Here


  

Archives:


S. No.

Letter No.

Subject

Issuing Authority

Date

Link

1

W.71/BR/Bridge Policy/ Vol.II

Open foundations -keying into Rock and Provision of steel rock anchorages

CBE

22-12-2021

Click

Here

2

W.148/P/SNW/ 2018

Guidelines on Similar Nature Works-reg

Dy.CE/ Works

13-12-2021

Click

Here

3

W.71/Floods/policy matters/Circulars

Construction of new Bridge during doubling-Reg

CE/WS&F

13-12-2021

Click

Here

4

Points noted during CBE’s Conference held at IRICEN/Pune on 2nd & 3rd Dec – 2021.

CBE

02-12-2021

Click

Here

5

W.71/BR/Bridge Policy/Vol.II

Provision of 5.15m deck width in ballasted bridges-Regarding

CBE

08-10-2021

Click

Here

6

W.71/BR/Bridge Policy/Vol.II

Construction and maintenance of Cover Over Platforms and FOBs-reg

CBE

28-09-2021

Click

Here

7

W.287/LC/Policy/VIII

Construction of RUB/Subways-SAG level certification for Drainage-reg

PCE

02-09-2021

Click

Here

8

W.71/BR/Bridge Policy/Vol.II

Arrangement of traction mast on abutment of bridges

CBE

20-08-2021

Click

Here

9

W.71/BR/Bridge Policy/Vol.II

Guntur Division-GNT-GTL section - Donakonda-Nandyal Sub section-Doubling Project-Replacing of existing Stone Top Culverts with RCC Box between Gajjelakonda -Diguvametta stations -Regarding

CBE

09-08-2021

Click

Here

10

W.71/Br.L/Genl

Attention to RUB/Bridge Rebuilding locations-Reg

CBE

07-06-2021

Click

Here

11

W.71/BR/Bridge Policy

Repairs to Spalling in RCC slabs-Reg

CBE

02-06-2021

Click

Here

12

W.71/Br.L/Genl/Correspondence/Vol.II

Bridge Inspection -Bridge under ORN 2 & 3 category-Reg

CBE

03-05-2021

Click

Here

13

W.71/BR/Bridge Policy

Execution of RUB/Bridge works with BOX Pushing method- Use of Rail Clusters for safety -Reg

CBE

16-03-2021

Click

Here

14

W.71/BR/Bridge Policy

Improvement in preparation of bridge drawings-reg

Dy.CE/Br.D

02-03-2021

Click

Here

15

W.71/BR/Bridge Policy

Minimum Clear Span & Minimum headroom for new Railway Bridges

CBE

16-02-2021

Click

Here

16

W.506/ESOs

Preparation of GADs and Completion Drawings of Bridges

PCE

08-02-2021

Click

Here

17

W.71/BR/Bridge Policy

Execution of RUB/Bridge works by BOX Pushing method -Reg

CBE

01-02-2021

Click

Here

18

W.71/BR/Bridge Policy

Execution of RUB/Bridge works with Box Segmental/Pushing method -Reg

CBE

04-12-2020

Click

Here

19

W.506/ESOs

Protection and safety measures at Bridge Works sites

PCE

29-07-2020

Click

Here

20

W.287/RUB-Drainage

Drainage problems at RUBs

CE/RSW

07-10-2020

Click

Here

21

W.506/ESOs

Bridge Planning and Construction -Policy

PCE

21-05-2020

Click

Here

22

W.71/BR/Bridge Policy

Improper Construction of retaining walls at RUB approaches-Reg

CBE

30-10-2019

Click

Here

23

W.71/BR/Bridge Policy

Approval of Bridge General Arrangement Drawings

CBE

25-10-2019

Click

Here

24

W.71/BR/Bridge Policy

Exposure condition consideration as per A&C Slip no.06 of IRS concrete Bridge Code (RePrint-2014)- Reg

AXEN/Br.D

23-09-2019

Click

Here

25

W.71/BR/Bridge Policy

Simplification of procedure for Approval of Engineering Drawings

AXEN/Br.D

29-08-2019

Click

Here

26

W.71/BR/Bridge Policy

Exposure condition consideration as per A&C slip no.06 of IRS Concrete Bridge Code (Reprint-2014)

Dy.CE/Br.D

31-12-2018

Click

Here

27

W.71/Bridge Policy

Elimination of existing STC bridges -Doubling Projects -Reg

CBE

14-12-2017

Click

Here

28

W.71/Bridge Policy

OHE mast fixing arrangement on the existing bridge piers and incorporating the details in bridge completion drawings-reg

CBE

08-12-2017

Click

Here

29

W.71.Br.Policy

Verification of Railway Electrification works being executed in your division

CBE

06-11-2017

Click

Here

30

W.71/Bridge Policy

OHE mast fixing arrangement on the existing bridge piers and incorporating the details in bridge completion drawings-reg

CBE

12-09-2017

Click

Here

31

W.71/Bridge Policy

Use of Bearings for Long Span Bridge Girders

CBE

31-08-2017

Click

Here

32

W.71/BR/Bridge Policy

Providing of Cross slopes for new track on doubling projects

PCE

03-07-2017

Click

Here

33

W.71/Br.Policy

OHE Mast for Electrification on Exg Pier/Abutment-Approval of GADs -BP copies of Approved GADs

CBE

17-05-2017

Click

Here

34

W.71/Br.Policy

Sanction for Minor works

PCE

16-05-2017

Click

Here

35

W.71/Br.Policy

Procedure for preparation of drawings, request for alterations for the approved drawings with respect to Bridge, Buildings, Yards and Other General works

CBE

16-05-2017

Click

Here

36

W.352/Br/Policy/Vol.VII

Non completion and Improper execution of flooring work at bridges provided with shallow foundations

CBE

06-03-2017

Click

Here

37

W.71/BR/RVNL/MMTS Ph-II/Pilot (br.221)

SC Division; MMTS Phase-II -SC-KZJ section Br.No. 291, at Ch;213427.35m exg. 7x6.10m PSC slab between GHZ-GT stations, Quadrupling of track between MLY-GT-Approval of PT Drawing of GAD

Dy.CE/ Br.D

28-02-2017

Click

Here

38

Minutes of meeting

Minutes of meeting held with RVNL Officials on 09-02-2017 in Chief Bridge Engineer’s Chamber

CBE

09-02-2017

Click

Here

39

W.351/Bldgs/FOBs/PFs/Policy(W-II)

Subways/FOBs-Provision of Subways and adoption of Standard spans and Provision of Ramps

CE/P&D

16-01-2017

Click

Here

40

W.352/Br/Policy/Subways

Typical plan of LHS with protection measures to avoid flooding of RUBs

PCE

21-10-2016

Click

Here

41

W.71/BR/Bridge Policy

Inspection and Maintenance of Arch Bridges

PCE

25-07-2016

Click

Here

42

W.71/BR/Bridge/ Policy

Construction and Maintenance of Cover Over Platforms and FOBs

CBE

25-04-2016

Click

Here

43

W.71/BR/Bridge/ Policy

Bridge proposal with lowering of Bed Level

CBE

09-03-2016

Click

Here

44

W.71/BR/Bridge Policy

Raising of girders in flood affected areas in GTL division, precautions in fixing of Danger Level etc

PCE

18-02-2016

Click

Here

45

W.71/Floods/Policy

Bridge proposals with lowering of bed level

CBE

12-01-2016

Click

Here

46

W.71/BR/Bridge Policy

Bridge with Well/Pile foundations -Fixing of safe scour depth

CBE

05-01-2016

Click

Here

47

W.71/Floods/Policy

Marking of scour depth on the pier/well cap

CE/WS&F)

22-12-2015

Click

Here

48

W.71/BR/Bridge Policy

Provision of flood protection works

PCE

10-12-2015

Click

Here

49

W.71/BR/Bridge Policy

Provision of cross drainage during doubling/tripling and flood protection

PCE

27-11-2015

Click

Here

50

W.71/BR/Bridge -Policy

Erection of RE Masts on existing Railway Bridges

CBE

13-07-2015

Click

Here

51

W.CON.496/PL/C/T&C/XIX/Vol.X

Instructions given by PCE/SC during meeting with Construction Officers on 06-05-2015

Dy.CE/C/G-1/SC

28-05-2015

Click

Here

52

572/Yards/Genl

Rail level(RL) of track in yard portion

CE/P&D

13-05-2015

Click

Here

53

W.71/BR/Bridge Policy

Grouting of pitching of slopes of embankment

CBE

18-03-2015

Click

Here

54

W.71/BR/RVNL/MMTS Ph-II

Approval of Design/Proof Checking consultant

CBE

14-11-2013

Click

Here

55

W.71/Br/P/9/Vol.VII

Approval of GADs for Bridges of New lines, doublings and Gauge conversion

CBE

04-03-2013

Click

Here

56

W.71/Br/P/9/Vol.VII

Permeability Test for the Concrete bridges

CBE

27-02-2013

Click

Here

57

W.71/Br/P/9/Vol.VII

Closure of Level crossings by diverting road traffic through a Railway waterway bridge

CBE

25-02-2013

Click

Here

58

W.PCE/Genl/2013

Preparation of Drawings reflecting Railway boundary care to be taken

PCE

08-02-2013

Click

Here

59

W.71/BR/Policy/Circular

Policy guidelines for provision of escalators

Dy.CE/Br.D

04-12-2012

Click

Here

60

W.71/BR/Bridge Policy

Improvement in preparation of bridge drawings

CBE

05-09-2011

Click

Here

61

W.351/FOB/PF's Policy

Joint Commercial and Engineering Procedural Order No.6 of 2011

Dy.CE/P&D

16-06-2011

Click

Here

62

W.71/BR/Bridge Policy

Use of PSC slabs for smaller spans

CBE

18-03-2011

Click

Here

63

D.O.Lr.No.W.331/A/1/Drg

Procedure of preparation of drawings for executing Civil Engineering Works with respect to level crossings

PCE

24-07-2003

Click

Here

64

D.O.Lr.No.W.331/A/1/Drg

Procedure of preparation of drawings for executing Civil Engineering Works with respect to Bridges, RUB/ROBs and flood section

PCE

24-07-2003

Click

Here







Back