|
S. No. |
Letter No. |
Subject |
Issuing Authority |
Date |
Link |
|
1 |
W.287/RUB-Drainage |
Drainage problems at RUBs |
CE/RSW |
07-10-2020 |
|
|
2 |
W.71/Br.L/P/9/Vol-VIII |
Measurement of Camber in Steel & PSC Girders. |
CBE |
22-02-2021 |
|
|
3 |
W.71/BR/Bridge Policy |
Execution of RUB/Bridge works with BOX Pushing method – Use of Rail Clusters for safety. |
CBE |
16-03-2021 |
|
|
Standard Drawing for Rail Cluster |
CBE |
26-03-2021 |
|||
|
Standard Drawing for RSJ Cluster |
CBE |
26-03-2021 |
|||
|
4 |
W.71/Br.L/Genl/Corresp/ Vol-II |
Bridge Inspection – Bridges under ORN-2 & 3 categories. |
CBE |
03-05-2021 |
|
|
5 |
W.71/BR/Bridge Policy |
Repairs to Spalling in RCC slabs |
CBE |
02-06-2021 |
|
|
6 |
W.71/Br.L/Genl. |
Attention to RUB/Bridge Rebuilding locations |
CBE |
07-06-2021 |
|
|
7 |
W.363/P/Vol.XIV |
Monsoon Precautions – Special Drive on clearing of drains |
CTE |
07-06-2021 |
|
|
8 |
W.71/BR/Bridge Policy |
Pre-inspection checks of Bridges and submission of Reports for statutory inspection of new sections by CRS |
CBE |
22-06-2021 |
|
|
CBE |
30-03-2022 |
||||
|
9 |
W.71/BR/Bridge Policy/ Vol.II |
GNT Division - Replacing of existing Stone Top Culverts with RCC Boxes between Gajjelakonda – Diguvametta stations. |
CBE |
09-08-2021 |
|
|
10 |
W.71/BR/Bridge Policy/ Vol.II |
Arrangement of Traction mast on abutment of bridges – letter addressed to RDSO. |
CBE |
20-08-2021 |
|
|
11 |
W.287/LC/Policy/VIII |
Construction of RUB/Subways – SAG Level certification for Drainage – reg |
PCE |
02-09-2021 |
|
|
12 |
W.544/I/Vol/VIII |
Standard Operating Procedure (SOP) for responding to Natural Disasters – Instructions for effective use of SOP. |
CE/WS&F |
21-09-2021 |
|
|
13 |
W.71/BR/Bridge/Policy/ Vol.II |
Construction and maintenance of Cover Over Platforms and FOBs – reiterated instructions dated 25-04-2016 |
CBE |
28-09-2021 |
|
|
14 |
W.71/BR/Bridge/Policy/ Vol.II |
Provision of 5.15m deck width in ballasted deck bridges – reg |
CBE |
08-10-2021 |
|
|
15 |
Points noted during CBE’s Conference held at IRICEN/Pune on 2nd & 3rd Dec – 2021. |
CBE |
02-12-2021 |
||
|
16 |
W.71/BR/Bridge Policy/ Vol.II |
Open Foundations – Keying into Rock and Provision of Steel Rock Anchorages. |
CBE |
22-12-2021 |
|
|
17 |
W.71/BR/Bridge Policy/ Vol.II |
Provision of filter media behind boulder filling at Abutments, Wing walls, Retaining walls – reg |
CBE |
29-04-2022 |
Archives:
|
S. No. |
Letter No. |
Subject |
Issuing Authority |
Date |
Link |
|
1 |
W.71/BR/Bridge Policy/ Vol.II |
Open foundations -keying into Rock and Provision of steel rock anchorages |
CBE |
22-12-2021 |
|
|
2 |
W.148/P/SNW/ 2018 |
Guidelines on Similar Nature Works-reg |
Dy.CE/ Works |
13-12-2021 |
|
|
3 |
W.71/Floods/policy matters/Circulars |
Construction of new Bridge during doubling-Reg |
CE/WS&F |
13-12-2021 |
|
|
4 |
Points noted during CBE’s Conference held at IRICEN/Pune on 2nd & 3rd Dec – 2021. |
CBE |
02-12-2021 |
||
|
5 |
W.71/BR/Bridge Policy/Vol.II |
Provision of 5.15m deck width in ballasted bridges-Regarding |
CBE |
08-10-2021 |
|
|
6 |
W.71/BR/Bridge Policy/Vol.II |
Construction and maintenance of Cover Over Platforms and FOBs-reg |
CBE |
28-09-2021 |
|
|
7 |
W.287/LC/Policy/VIII |
Construction of RUB/Subways-SAG level certification for Drainage-reg |
PCE |
02-09-2021 |
|
|
8 |
W.71/BR/Bridge Policy/Vol.II |
Arrangement of traction mast on abutment of bridges |
CBE |
20-08-2021 |
|
|
9 |
W.71/BR/Bridge Policy/Vol.II |
Guntur Division-GNT-GTL section - Donakonda-Nandyal Sub section-Doubling Project-Replacing of existing Stone Top Culverts with RCC Box between Gajjelakonda -Diguvametta stations -Regarding |
CBE |
09-08-2021 |
|
|
10 |
W.71/Br.L/Genl |
Attention to RUB/Bridge Rebuilding locations-Reg |
CBE |
07-06-2021 |
|
|
11 |
W.71/BR/Bridge Policy |
Repairs to Spalling in RCC slabs-Reg |
CBE |
02-06-2021 |
|
|
12 |
W.71/Br.L/Genl/Correspondence/Vol.II |
Bridge Inspection -Bridge under ORN 2 & 3 category-Reg |
CBE |
03-05-2021 |
|
|
13 |
W.71/BR/Bridge Policy |
Execution of RUB/Bridge works with BOX Pushing method- Use of Rail Clusters for safety -Reg |
CBE |
16-03-2021 |
|
|
14 |
W.71/BR/Bridge Policy |
Improvement in preparation of bridge drawings-reg |
Dy.CE/Br.D |
02-03-2021 |
|
|
15 |
W.71/BR/Bridge Policy |
Minimum Clear Span & Minimum headroom for new Railway Bridges |
CBE |
16-02-2021 |
|
|
16 |
W.506/ESOs |
Preparation of GADs and Completion Drawings of Bridges |
PCE |
08-02-2021 |
|
|
17 |
W.71/BR/Bridge Policy |
Execution of RUB/Bridge works by BOX Pushing method -Reg |
CBE |
01-02-2021 |
|
|
18 |
W.71/BR/Bridge Policy |
Execution of RUB/Bridge works with Box Segmental/Pushing method -Reg |
CBE |
04-12-2020 |
|
|
19 |
W.506/ESOs |
Protection and safety measures at Bridge Works sites |
PCE |
29-07-2020 |
|
|
20 |
W.287/RUB-Drainage |
Drainage problems at RUBs |
CE/RSW |
07-10-2020 |
|
|
21 |
W.506/ESOs |
Bridge Planning and Construction -Policy |
PCE |
21-05-2020 |
|
|
22 |
W.71/BR/Bridge Policy |
Improper Construction of retaining walls at RUB approaches-Reg |
CBE |
30-10-2019 |
|
|
23 |
W.71/BR/Bridge Policy |
Approval of Bridge General Arrangement Drawings |
CBE |
25-10-2019 |
|
|
24 |
W.71/BR/Bridge Policy |
Exposure condition consideration as per A&C Slip no.06 of IRS concrete Bridge Code (RePrint-2014)- Reg |
AXEN/Br.D |
23-09-2019 |
|
|
25 |
W.71/BR/Bridge Policy |
Simplification of procedure for Approval of Engineering Drawings |
AXEN/Br.D |
29-08-2019 |
|
|
26 |
W.71/BR/Bridge Policy |
Exposure condition consideration as per A&C slip no.06 of IRS Concrete Bridge Code (Reprint-2014) |
Dy.CE/Br.D |
31-12-2018 |
|
|
27 |
W.71/Bridge Policy |
Elimination of existing STC bridges -Doubling Projects -Reg |
CBE |
14-12-2017 |
|
|
28 |
W.71/Bridge Policy |
OHE mast fixing arrangement on the existing bridge piers and incorporating the details in bridge completion drawings-reg |
CBE |
08-12-2017 |
|
|
29 |
W.71.Br.Policy |
Verification of Railway Electrification works being executed in your division |
CBE |
06-11-2017 |
|
|
30 |
W.71/Bridge Policy |
OHE mast fixing arrangement on the existing bridge piers and incorporating the details in bridge completion drawings-reg |
CBE |
12-09-2017 |
|
|
31 |
W.71/Bridge Policy |
Use of Bearings for Long Span Bridge Girders |
CBE |
31-08-2017 |
|
|
32 |
W.71/BR/Bridge Policy |
Providing of Cross slopes for new track on doubling projects |
PCE |
03-07-2017 |
|
|
33 |
W.71/Br.Policy |
OHE Mast for Electrification on Exg Pier/Abutment-Approval of GADs -BP copies of Approved GADs |
CBE |
17-05-2017 |
|
|
34 |
W.71/Br.Policy |
Sanction for Minor works |
PCE |
16-05-2017 |
|
|
35 |
W.71/Br.Policy |
Procedure for preparation of drawings, request for alterations for the approved drawings with respect to Bridge, Buildings, Yards and Other General works |
CBE |
16-05-2017 |
|
|
36 |
W.352/Br/Policy/Vol.VII |
Non completion and Improper execution of flooring work at bridges provided with shallow foundations |
CBE |
06-03-2017 |
|
|
37 |
W.71/BR/RVNL/MMTS Ph-II/Pilot (br.221) |
SC Division; MMTS Phase-II -SC-KZJ section Br.No. 291, at Ch;213427.35m exg. 7x6.10m PSC slab between GHZ-GT stations, Quadrupling of track between MLY-GT-Approval of PT Drawing of GAD |
Dy.CE/ Br.D |
28-02-2017 |
|
|
38 |
Minutes of meeting |
Minutes of meeting held with RVNL Officials on 09-02-2017 in Chief Bridge Engineer’s Chamber |
CBE |
09-02-2017 |
|
|
39 |
W.351/Bldgs/FOBs/PFs/Policy(W-II) |
Subways/FOBs-Provision of Subways and adoption of Standard spans and Provision of Ramps |
CE/P&D |
16-01-2017 |
|
|
40 |
W.352/Br/Policy/Subways |
Typical plan of LHS with protection measures to avoid flooding of RUBs |
PCE |
21-10-2016 |
|
|
41 |
W.71/BR/Bridge Policy |
Inspection and Maintenance of Arch Bridges |
PCE |
25-07-2016 |
|
|
42 |
W.71/BR/Bridge/ Policy |
Construction and Maintenance of Cover Over Platforms and FOBs |
CBE |
25-04-2016 |
|
|
43 |
W.71/BR/Bridge/ Policy |
Bridge proposal with lowering of Bed Level |
CBE |
09-03-2016 |
|
|
44 |
W.71/BR/Bridge Policy |
Raising of girders in flood affected areas in GTL division, precautions in fixing of Danger Level etc |
PCE |
18-02-2016 |
|
|
45 |
W.71/Floods/Policy |
Bridge proposals with lowering of bed level |
CBE |
12-01-2016 |
|
|
46 |
W.71/BR/Bridge Policy |
Bridge with Well/Pile foundations -Fixing of safe scour depth |
CBE |
05-01-2016 |
|
|
47 |
W.71/Floods/Policy |
Marking of scour depth on the pier/well cap |
CE/WS&F) |
22-12-2015 |
|
|
48 |
W.71/BR/Bridge Policy |
Provision of flood protection works |
PCE |
10-12-2015 |
|
|
49 |
W.71/BR/Bridge Policy |
Provision of cross drainage during doubling/tripling and flood protection |
PCE |
27-11-2015 |
|
|
50 |
W.71/BR/Bridge -Policy |
Erection of RE Masts on existing Railway Bridges |
CBE |
13-07-2015 |
|
|
51 |
W.CON.496/PL/C/T&C/XIX/Vol.X |
Instructions given by PCE/SC during meeting with Construction Officers on 06-05-2015 |
Dy.CE/C/G-1/SC |
28-05-2015 |
|
|
52 |
572/Yards/Genl |
Rail level(RL) of track in yard portion |
CE/P&D |
13-05-2015 |
|
|
53 |
W.71/BR/Bridge Policy |
Grouting of pitching of slopes of embankment |
CBE |
18-03-2015 |
|
|
54 |
W.71/BR/RVNL/MMTS Ph-II |
Approval of Design/Proof Checking consultant |
CBE |
14-11-2013 |
|
|
55 |
W.71/Br/P/9/Vol.VII |
Approval of GADs for Bridges of New lines, doublings and Gauge conversion |
CBE |
04-03-2013 |
|
|
56 |
W.71/Br/P/9/Vol.VII |
Permeability Test for the Concrete bridges |
CBE |
27-02-2013 |
|
|
57 |
W.71/Br/P/9/Vol.VII |
Closure of Level crossings by diverting road traffic through a Railway waterway bridge |
CBE |
25-02-2013 |
|
|
58 |
W.PCE/Genl/2013 |
Preparation of Drawings reflecting Railway boundary care to be taken |
PCE |
08-02-2013 |
|
|
59 |
W.71/BR/Policy/Circular |
Policy guidelines for provision of escalators |
Dy.CE/Br.D |
04-12-2012 |
|
|
60 |
W.71/BR/Bridge Policy |
Improvement in preparation of bridge drawings |
CBE |
05-09-2011 |
|
|
61 |
W.351/FOB/PF's Policy |
Joint Commercial and Engineering Procedural Order No.6 of 2011 |
Dy.CE/P&D |
16-06-2011 |
|
|
62 |
W.71/BR/Bridge Policy |
Use of PSC slabs for smaller spans |
CBE |
18-03-2011 |
|
|
63 |
D.O.Lr.No.W.331/A/1/Drg |
Procedure of preparation of drawings for executing Civil Engineering Works with respect to level crossings |
PCE |
24-07-2003 |
|
|
64 |
D.O.Lr.No.W.331/A/1/Drg |
Procedure of preparation of drawings for executing Civil Engineering Works with respect to Bridges, RUB/ROBs and flood section |
PCE |
24-07-2003 |

Accessibility Controls