GATI SHAKTI UNIT
HYDERABAD DIVISION
SOUTH CENTRAL RAILWAY
The Railway Board had approved setting up of Gati Shakti Units (GSUs) in all Divisions of Indian Railways during July 2022 to fast track the construction works required to remove bottlenecks in operations and improve mobility that would lead to increased cargo loading. Accordingly a Gati Shakti unit is formed in HYB Division and is established at 2nd floor of Lekha Bhavan.
Divisional Gati Shakti Unit shall be responsible for planning and execution of following works:
-
Carrying out feasibility study followed by preparation of Detailed Project Report for further consideration of the Railway Board.
-
Station Redevelopment.
-
Plan Head 53: Customer Amenities.
-
Plan Head 16: Traffic Facilities.
-
Plan Head 29: Road Safety and level crossing.
-
Plan Head 30: Road Under Bridge (RUB) and Road Over Bridge (ROB).
-
Plan Head 33: Signal and Telecommunication such as EI, RRI including in private siding.
-
Plan Head 36: Provision of Escalator and lifts.
-
Plan Head 42: Workshop including production unit work.
-
All siding works and deposit work.
-
Electrification of sidings, workshops & small leftover RE patches.
-
All coal connectivity projects/port connectivity works under different Plan Head (confined within the divisional boundary).
Organisational Setup and Staff Position

|
Details of staff working in Gati Shakti - Hyderabad Division
|
|
S.NO
|
Name
(Sri/Smt./Kum)
|
Designation
|
|
1
|
Ashok Kumar Singh
|
Chief Project Manager/GS/HYB
|
|
2
|
Vacant
|
Dy.Chief Engineer/GS/HYB
|
|
3
|
K Nathanael
|
ADEN/GS/HYB
|
|
4
|
A Avinash
|
SSE/Drg/GS/HYB
|
|
5
|
K S Raja Reddy
|
SSE/W/GS/HYB
|
|
6
|
Zeeshan Ahmed
|
SSE/W/GS/HYB
|
|
7
|
G Mahima Evangeline
|
JE/Drg
|
|
8
|
D Divyatej Phanindra
|
Stenographer/GS/HYB
|
|
9
|
S Manohar
|
Sr.Clerk
|
|
Details of Re-engaged Retired Railway Staff in Gati Shakti/HYB
|
|
S.No
|
Name
(Sri/Smt./Kum)
|
Designation
|
|
1
|
D Prasada Rao
|
SSE/Works
|
|
2
|
B Venkateswara Rao
|
SSE/Works
|
|
3
|
Adapa Jagdish Babu
|
SSE/Works
|
|
4
|
Malim Riyaz Mohuddin
|
OS/GS
|
Works allotted and Progress
|
Plan Head
|
No of works allotted
|
Total Value in Rs.
|
|
PH 1600 (Traffic Facility)
|
3
|
28.68 cr
|
|
PH 3000 (ROB/RUB)
|
14
|
335.71 cr
|
|
PH 4200 (Workshop)
|
2
|
23.49 cr
|
|
PH 5300 (Passenger Amenities)
|
1
|
0.72 cr
|
|
Bye Pass Works (FLS)
|
1
|
0.05 cr
|
|
Station Redevelopment works (Feasibility Study)
|
1
|
0.55 cr
|
|
Total
|
22
|
389.20 cr
|
Status / Progress of works
|
PH 1600 (Traffic Facility)
|
|
S.No.
|
Name of work
|
Year of Sanction
|
Estimated Cost
|
Present Status
|
|
1
|
Nizamabad-Remodelling of yard arrangements for providing additional platforms and one full length dead end spur.
|
2018- 19
|
Rs.8.7984 cr
|
ESP under revision in view of Doubling
|
|
Nizamabad- Provision of additional loop line (pro rd 6) in lieu of dead end spur along with electrification and modification of existing OHE arrangements of GL-1(Rd-5) & GL-2(Rd-4)
|
2023-24
|
Rs.8.97 cr
|
|
2
|
Nizamabad Byepass line
Byepass line at Nizamabad junction station (1.548km) for connecting Nizamabad-Secunderabad & Nizamabad-Peddapalli Main line of south central railway
|
2023-24
(RB sanction on 29.02.2024)
|
Rs.121.97 cr
|
Process for land acquisition in progress
|
|
3
|
Janakampet Jn-Provision of two Additional loop lines to cater the operational needs.
|
2021-22
|
Rs.11.3062 cr
|
Commissioned Feb 2024
|
|
4
|
Falaknuma - Provision of DN loop line (Standard Double line layout).
|
2021–22
|
Rs. 8.5721 cr
|
Commissioned Dec 2023
|
|
PH 5300 (Passenger Amenities)
|
|
1
|
Kamareddi-Provision of 02 no.s of Lifts at Kamareddi station.
|
2021–22
|
Rs. 0.72 cr
|
Commissioned Feb 2023
|
|
|
PH 3000 (ROB/RUB works)
|
|
S.No
|
PB No.
|
Name of work
|
Year of Sanction
|
Present Status
|
|
1
|
121
|
RUB near Safilguda lane in lieu of LC No 254
|
2001-02
|
LC is physically closed. PCE sanction is under process.
|
|
2
|
145
|
ROB between Dichpally - Nizamabad two lane in lieu of LC No 193
|
2012-13
|
Work in progress
|
|
3
|
234
|
ROB between Falaknuma - Budvel four lane in lieu of LC No 7
|
2018-19
|
Work in Progress
|
|
4
|
232
|
ROB between Timmapur - Shadnagar four lane in lieu of LC No 27
|
2018-19
|
Work in progress
|
|
5
|
238c
|
Proposed ROB as 1x46.00M clear span composite steel girder at Km 166/500-600 in lieu of Existing Manned LCNo.90A between Wanaparthy road and Sriramnagar stations.
|
2019-20
|
GAD under HQ approval.
|
|
6
|
238d
|
Sec-bad-Mudkhed- ROB in lieu of LC 228 Wadiyaram Yard-Masaipet at Km 555/3-4.
|
2019-20
|
GAD under HQ approval (19.02.2024)
|
|
7
|
238g
|
Sec-bad-Mudkhed-ROB @ LC No.209 A uppalvai-Kamaredddi
|
2019-20
|
GAD Approved by HQ. Approach road estimate awaited from State govt (19.02.2024)
|
|
8
|
238h
|
Jankampet-Bodhan- ROB @ LC No. 12JB at km 12/5-6
|
2019-20
|
This LC is falling on National Highway, state govt has been advised that this ROB shall be made by MoRTH as per policy.
|
|
9
|
238j
|
Jankampet-Bodhan- ROB @ LC No. 18JB at km 19/1-2 (Bodhan Yard)
|
2019-20
|
GAD approved by HQ. State govt has to submit a detailed estimate for the approach road. (26.09.2023)
|
|
10
|
DP
|
Addl. ROB @ side ofexg. ROB No. 46 (SC - DHNE)
km15/1-3
|
|
Work in progress
|
|
11
|
238e
|
ROB @ 2/MLY Dayanandnagar - Moula Ali (SC - MUE) at Km. 1/700-800
|
2019-20
|
GAD approved by HQ. Approach road estimate awaited from State govt. (23.02.2024).
Alignment plan for LHS awaited from State Govt.(04.08.2023)
|
|
PH 4200 (Workshop work)
|
|
S.
No.
|
Name of work
|
Year of Sanction
|
Estimated Cost
|
Present Status
|
|
1
|
Integrated Bogie Assembly and Disassembly for LGD shops.
|
2019-20
|
Rs. 15.15 cr
|
works completed.
|
|
PH 1600 (Traffic Facility – process for sanction)
|
|
S.
No.
|
Name of work
|
Present Status
|
|
1
|
Kacheguda Yard Remodeling for Increasing of CSRs of road no.3, 4 & 5 to accommodate full length coaching/freight trains and with PF for 24 coach length train duly extending Bridge No.17.
|
DPR (Rs.66.94 cr) Submitted
Sanction awaited
|
|
Station Redevelopment Works
|
|
S.
No.
|
Name of work
|
Present Status
|
|
1
|
KCG Station - Redevelopment of station
|
-
Inception Report (KD1,16.09.2022) submitted by Agency
-
Preliminary Report, Land Development Report & Infrastructure Development Report (KD2, 15.10.2022) submitted by Agency
-
Concept Plan (KD3,17.11.2022) submitted by Agency
-
Agency has made its first presentation on the concept plan (master plan) on 02.12.22 to DRM & Branch officers.
-
The point raised by Railways incorporated by the agency and KD3 PPT sent again (18.01.2023)
-
DRM along with branch officers and representative of agency has done detailed inspection on 25.01.2023 and advised few more points to include.
-
Agency submitted KD3 on 25.02.2023 duly incorporating points raised during inspection on 25.02.2023
-
Approved KD3 report submitted to HQ on 06.05.2023 for approval.
-
Agency made presentation to GM & PHODs on 17.05.2023 & 17.08.2023
-
Revised KD3 submitted to HQ on 01.12.2023.
-
Presentation made to GM & PHODs on 04.01.2024, the observations raised attended by agency.
-
KD3 approved on 14.02.2023
-
DPR from consultant awaited.
|
|
List of Stations selected under “Amrit Bharat Station Scheme” - HYB Div
|
|
S.No
|
Name of the station
|
Total Cost
(Crs)
|
|
1
|
Umri
|
7.72
|
|
2
|
Dharmabad
|
30.02
|
|
3
|
Basar
|
11.33
|
|
4
|
Nizamabad
|
53.03
|
|
5
|
Kamareddi
|
39.84
|
|
6
|
Medchal
|
32.11
|
|
7
|
Malkajgiri
|
27.61
|
|
8
|
Malakpet
|
36.44
|
|
9
|
Yakutpura
|
8.53
|
|
10
|
Huppuguda
|
26.81
|
|
11
|
Umdanagar
|
12.37
|
|
12
|
Shadnagar
|
32.99
|
|
13
|
Jadcherla
|
35.54
|
|
14
|
Mahabubnagar
|
39.82
|
|
15
|
Gadwal
|
34.29
|
|
16
|
Sri Bala Brahmeswara Jogulamaba
|
6.07
|
|
17
|
Kurnool City
|
42.62
|
|
18
|
Medak
|
15.32
|
|
19
|
Kacheguda
|
DPR under preparation
|
|
List of stations where 12 meter Foot Over Bridge Proposed
|
|
Sl. No.
|
Name of the station
|
|
1
|
Dharmabad
|
|
2
|
Nizamabad
|
|
3
|
Kamareddi
|
|
4
|
Medchal
|
|
5
|
Malkajgiri
|
|
6
|
Malakpet
|
|
7
|
Huppuguda
|
|
8
|
Shadnagar
|
|
9
|
Jadcherla
|
|
10
|
Mahbubnagar
|
|
11
|
Gadwal
|
|
12
|
Kurnool Town
|
|
List of LC gate where feasibility study is in progress for proving Road Over Bridge/ Road Under Bridge
|
|
Sl. No.
|
LC No.
|
LC Location
|
Between Station
|
|
Secunderabad- Dhone Section
|
|
1
|
133
|
245/200-300
|
Kurnool Town (KRNT)-Dupadu (DUU)
|
|
2
|
60A
|
115/400-500
|
Mahbubnagar (MBNR)-Manyamkonda (MQN)
|
|
3
|
61
|
115/700-800
|
|
4
|
79
|
147/300-400
|
Devarkadre (DKC)-Kaukuntla (KQQ)
|
|
5
|
104
|
196/500-600
|
Poodoor (PDO)-Itikyala (IKI)
|
|
6
|
70
|
131/001-100
|
Manyamkonda (MQN)- Devarkadre (DKC)
|
|
7
|
84
|
154/400-500
|
Kaukuntla (KQQ)- Wanparti Road (WPR)
|
|
8
|
93
|
171/800-900
|
Wanparti Road (WPR)- Sriramnagar (SRNR)
|
|
9
|
94
|
173/900-174/0
|
Wanparti Road (WPR)- Sriramnagar (SRNR)
|
|
10
|
95
|
176/400-500
|
Sriramnagar (SRNR)-Gadwal Jn. (GWD)
|
|
11
|
98
|
186/500-600
|
Sriramnagar (SRNR)-Gadwal Jn.(GWD)
|
|
12
|
103
|
194/800-900
|
Gadwal Jn. (GWD)- poodoor (PDO)
|
|
13
|
111
|
208/300-400
|
Itikyala (IKI)-Manopad (MOA)
|
|
14
|
142
|
260/400-500
|
Dupadu(DUU)-Ulinda Konda (UKD)
|
|
15
|
145
|
265/500-600
|
Ulinda Konda (UKD) - Veldurti (VDI)
|
|
16
|
149
|
271/000-100
|
Ulinda Konda (UKD) - Veldurti (VDI)
|
|
17
|
155
|
278/500-600
|
Veldurti (VDI)- Bogolu (BVO)
|
|
Secunderabad- Mudkhed
|
|
18
|
188
|
445/0-50
|
Basar (BSX)-Navipet (NVT)
|
|
19
|
190A
|
455/100-200
|
Navipet (NVT)-Jankampet (JKM)
|
|
20
|
192
|
459/200-300
|
Jankampet (JKM)-Nizamabad (NZB)
|
|
21
|
196
|
473/700-800
|
Dichpalli (DHP)-Indalvai (IDL)
|
|
22
|
198
|
482/900-483/0
|
Indalvai (IDL) -Sirnapalli (SCP)
|
|
23
|
211
|
516/700-800
|
Kamareddi (KMC)-Tadmadla (TMD)
|
|
24
|
236A
|
571/400-500
|
Masaipet (ME)-Manoharabad (MOB)
|
|
25
|
165
|
390/700-750
|
Sivangoan (SVN)- Umri (UMRI)
|
|
26
|
179
|
420/750-800
|
Karkheli (KEK)-Dharmabad (DAB)
|
|
27
|
201
|
489/800-900
|
Indalvai (IDL)-Sirnapalli (SCP)
|
|
28
|
242A
|
588/900-589/0
|
Manoharabad (MOB)-Medchal(MED)
|
|
29
|
166
|
392/400-500
|
UMRI-Bolsa (BLSA)
|
|
30
|
172
|
407/600-500
|
Karkheli (KEK)-Dharmabad (DAB)
|
|
31
|
174
|
410/200-250
|
Karkheli (KEK)-Dharmabad (DAB)
|
|
32
|
178
|
419/900-950
|
Karkheli (KEK)-Dharmabad (DAB)
|
|
33
|
182
|
430/450-500
|
Dharmabad (DAB)-Basar (BSX)
|
|
34
|
183
|
435/400-500
|
Basar (BSX)- Navipet (NVT)
|
|
35
|
185
|
438/600-650
|
|
36
|
205
|
500/400-500
|
Sirnapalli (SCP)-Uppalwai(UPW)
|
|
37
|
206
|
502/500-600
|
Uppalwai (UPW) -Kamareddi (KMC)
|
|
38
|
235
|
570/0-100
|
Masaipet (ME)-Manoharabad (MOB)
|
|
39
|
255
|
616/700-800
|
Cavalry barracks (CVB)-Malkajgiri (MJF)
|
|
40
|
1JB
|
3/800-900
|
Jankampet Jn (JKM)-Bodhan (BDHN)
|
|
41
|
5JB
|
6/900-7/0
|
|
42
|
7JB
|
8/700-800
|
|
43
|
9JB
|
9/700-800
|
|
44
|
10JB
|
10/600-700
|
Brief On Proposed Amrit Stations 1.0 over Hyderabad Division - Click on the link
<><><<><><><>