Electrical


Electrical (M) branch is responsible for maintenance and up-keeping of electrical assets at residential quarters, prominent service buildings, all the stations and LCs in SC-DHNE & SC-MUE sections. In addition to this, coaching maintenance of electrical portion at Kacheguda depot and Electrical System Training Centre (ESTC) are also under Electrical (M) organization. Branch is headed by One JAG officer and assisted by one DEE and one ADEE.

Name of the Officers working in the department and their assigned duties.

1.   Shri. B. Hema Naik, Sr.DEE/M/HYB

Overall, in-charge for estate of Hyderabad, Maintenance of Power Supply Installations and Electrical maintenance of AC and Non-AC Coaches of the Division.

2.    Shri. G. Ratnam, DEE/M/HYB

Maintenance of installation including power supply in HQRS area Maintenance of installations of South Lallaguda, North Lallaguda, Moula-Ali, Pumps, AC, Medchal, Nizamabad. Assets of all Electrical Installations from STPD to MUE (excluding). Maintenance of TL and AC Coaches at Kacheguda and Maintenance of Lifts of above sections and Electrical System Training Centre (ESTC)

 

3.    Shri. T. Nageswara Rao, ADEE-I/M/HYB

Maintenance of installation including power supply in HQRS area Maintenance of Electrical installations of all HT substations, Rail Nilayam, Chilkalguda, Stores, Kacheguda, Mahbubnagar, Kurnool City sections including Escalators and Lifts at Rail Nilayam, Hyderabad Bhavan, Rail Nirman Nilayam, Lekha Bhavan, Kacheguda and Escalators at Kacheguda & Kurnool City. Assets of all Electrical Installations from ATC to DHNE (excluding)

 

Technical Details - Major Assets at a Glance  

 

S.No

Description of Items

Qty

Remarks

1

No. of Depots

16

PM: AC/Domestic, CKL, HT, HB, KCG, KRNT, MBNR, MED, MLY, NZB, NLGD, Pumps, RN, SLGD.

Coaching: TL/KCG & AC/KCG

2

No. of Sub-stations

49

33/11 kV – 2Nos., 11KV/440V – 47 Nos.

3

No. of Transformers

101

69,280 KVA

4

No. of DG Sets

50

7,228 KVA

5

Total Connected load

42,164

KW

6

No. of Pumps

526

4,003 HP

7

No. AC units

1,630

3,380 TR

8

No. of Water Coolers

89

134 KW

9

Solar Water Heaters

69

39,775 LPD

10

Solar Power Plants

4.35 MWp

S.No

Mode

Agency

Capacity

in kWp

1

PPA

M/s. Renew

1560

2

PPA

M/s. Azure

100

3

Capex

Department

2696

11

Lifts

62

Type of location

Qty

Service Buildings

32

Stations

30

12

Escalators

05

KCG-3 & KRNT-2

13

High masts

85

Nos.

14

Natural Day light Pipes

165

Nos.

 

 

Electrical Energy Consumption Pattern:

Description

2023-24

2024-25

Difference

% Change

Connected Load in KW

37563

41353

3790

10.09

Consumption in KWh

26031398

26685122

653724

2.51

Specific Energy Consumption (KWh/KW)

693.01

645.30

-47.71

-6.88

Amount Paid in Cr. (Rs.)

20.82

21.30

0.48

2.31

ELECTRICAL – COACHING

Trains at a Glance

Sl. no.

Train no.

1

20703/04 (KCG-YPR) Vande Bharat

2

17652/43/44/51(CGL)

3

17064/63(MMR)

4

12785/86 (MYS)

5

12797/98 (CTO)

6

17603/04 (YNK)

7

12789/90 (MRDW)

8

22715/16 (MDU)

9

17605(KCG-BGKT)

10

17639/40/41/42 (AK)

11

17625/26 (RAL)

12

17661/62/17023/24 (NSL)

13

07053(LGH)