inner-banner-img

our-division


Mechanical


MECHANICAL

(CARRIAGE AND WAGONS DEPARTMENT)

Organization chart 

 

  • Sr.DME is the overall in-charge of Mechanical department of this division
  • CDO/KCG is the in-charge of coaching depot activities of KCG.  
  • ADME looks after C&W activities at NZB, KRNT & MBNR and ART/SPARMV NZB
  • AEnHM looks after the station cleaning activities at NGT stations and OEM Activities at KRNT, NZB & MBNR stations.

Functions of the department 

  • Primary and other end maintenance of coaches.
  • Traffic restoration in case of unusual incidents.
  • Monitoring of station cleanliness.

Major activities 

  • Coach Maintenance depot: Kacheguda
  • Other End Maintenance: Nizamabad, Kurnool city, Mahbubnagar
  • ART/SPMRV: NZB
  • Mobile ART: KCG

1.STAFF:

Category

KACHEGUDA

NIZAMABAD

MBNR

 KRNT

CTO/C&W

Sr. DME/O, Sr. DSO/O, PCME/O & Sr. DME//Dsl/MLY

Sanc

Actual

Sanc

Actual

Sanc

Actual

Sanc

Actual

Sanc

Actual

Sanc

Actual

Supervisors

26

25

9

5

0

0

02

02

5

5

9

9

Group C

134

124

27

24

3

2

10

06

1

1

0

0

Group D

50

36

12

10

2

2

04

03

0

0

0

0

Total

210

185

48

39

5

4

16

11

6

6

9

9

 

Office / Depot

Designation

Sanctioned

Actual

Vacancy

Excess

Surplus

Sr.DME/O/HYB

Ch.OS

3

3

0

0

-

Ch.OS (Supernumerary)

0

1

0

0

1

OS

7

4

3

0

-

OS (Surplus Typist)

0

1

0

0

1

Sr.Clerk

1

0

1

0

-

Jr.Clerk

0

2

0

2

-

TOTAL:

11

11

4

2

2

Sr.DME/DSL/ MLY

Ch.OS

4

5

0

1

-

OS

8

5

3

0

-

Sr.Clerk

2

2

0

0

-

Jr.Clerk

0

1

0

1

-

TOTAL:

14

13

3

2

-

CDO/KCG

Ch.OS

1

1

0

0

-

OS

4

4

0

0

-

Sr.Clerk

0

0

0

0

-

Jr.Clerk

0

4

0

4

-

TOTAL:

5

9

0

4

-

SSE/C&W/NZB

OS

1

1

0

0

-

TOTAL:

1

1

0

0

-

Grand TOTAL :

31

34

7

8

2

 

 

 

 

 

 

 

Group D Staff

 

 

 

Sr.DME/HYB

Gen. Asst.

3

3

0

0

-

 

TADK (B.Peon)

1

0

1

0

-

Sr.DME/DSL/ MLY

TADK (B.Peon)

1

0

1

0

-

 2.WORK LOAD:

Details of PM as on 26.03.2026

Primary maintained trains:

Depot

ICF

LHB

Total no. of rakes

No. of rakes running at present

Total no. of rakes

No. of rakes running at present

For Mail/Exp trains

For Passenger Trains

In Mail/Exp trains

In Passenger Trains

For Mail/Exp trains

For Passenger Trains

In Mail/Exp trains

In Passenger Trains

KCG

4

0

4

0

24

0

24

0

Depot

Total no. of trains running at present with ICF rake

Total no. of trains running at present with LHB rake

 
 

Mail/Exp trains

Passenger Trains

Mail/Exp trains

Passenger Trains

 

KCG

1

0

12

0

 

Summary of Coach Holdings as on 26.03.2026

Depot

ICF

LHB

TOTAL

G. TOTAL

AC

Non-AC

AC

Non-AC

AC

Non-AC

KCG

48

56

203

325

251

381

632

Vande Bharat train – 01 Rake 16 coaches 

·Coaching Depot, Kacheguda

A

PRIMARY MAINTENANCE

S. No

Trains Maintained

No of Trains

No of Chs/day

1

ICF

1

22.00

2

LHB

12

130.30

3

Vande Bharat

1

13.70

TOTAL

14

166.00

 

B

OTHER END MAINTENANCE

S. No

Trains Maintained

No of Trains

No of Chs/day

1

ICF

1

3.4

2

LHB

4

66.90

3

DEMU

2

11.40

TOTAL

8

81.70

 

·Other End Maintenance at Nizamabad, Bodhan, Medak, Medchal & Siddipet stations

S. No

Trains Maintained

No of Trains

No of Chs/day

Nizamabad

1

ICF Daily

2

24

2

LHB Daily

1

22

3

DEMU Daily

3

24

TOTAL

6

70

 

S. No

Trains Maintained

No of Trains

No of Chs/day

Bodhan

1

ICF Daily

1

10

2

DEMU Daily

1

12

TOTAL

2

22

   

S. No

Trains Maintained

No of Trains

No of Chs/day

Medak

1

ICF Daily

1

20

2

DEMU Daily

1

8

TOTAL

2

28

 

S. No

Trains Maintained

No of Trains

No of Chs/day

Medchal

1

12785

1

22

2

12797 (Mon, Thurs & Fri)

1

9.40

3

17603 (Wed, Sat & Sun)

1

9.40

TOTAL

2

40.80

 

S. No

Trains Maintained

No of Trains

No of Chs/day

Siddipet

1

DEMU Daily

1

8

TOTAL

1

8

 

·Details of Other End Maintenance at Kurnool City & Mahboobnagar

S. No

Trains Maintained

No of Trains

No of Chs/day

Kurnool City

1

ICF Daily

2

35

2

LHB Weekly once

1

3.14

3

DEMU Daily

2

16

TOTAL

5

54.14

           

 

S. No

Trains Maintained

No of Trains

No of Chs/day

Mahboobnagar

1

LHB Daily

1

22

2

MEMU 5 days/week

1

5.71

TOTAL

2

27.71

  

3.Infrastructure Facilities at Coaching Depot, Kacheguda

a. Pit-lines

S. No

Pit No

Design of

pit line

Length in Mtrs.

Coach Capacity

Catwalk Width

No. of water Hydrants

 
 

1

1

Conventional

560

ICF: 24

1.27 m-Station side

47

 

LHB:22

1.33 m-Office Side

 

2

2

Conventional

560

ICF::24

1.33 m-Station side

47

 

LHB:22

3.28 m-Office Side

 

3

3

CAMTECH

560

ICF:24

3.28 m-Station & 

 

LHB:22

Office Side

 

 

b. IOH Shed

1

IOH Shed 

65 M X 19 M - 4 coach capacity  

2

AC coach pit

2  pits diagonally (One with dyno drive)

 

c. Platforms

PF No.

Length of pipeline (mts)

No.of Hydrants (Nos)

Distance between Hydrants (mts) 

Pipe line dia(Inch)

Height of Hydrant from rail level(mts)

Booster pump

1

560 m

282

2

6"

2

20 HP

2

617 m

282

2

6"

2

20 HP

3

578 m

275

2

6"

2.3

20 HP

4

557 m

275

2

6"

2.3

20 HP

5

557 m

QWS work under progress

 

d. Mechanised Laundry: 01 Departmental Mechanised laundry of capacity 01 ton/shift caters to supply of washed linen to trains 12785 KCG-AP & 17603 KCG-YNK.

 

e. Major M&P

S. No

Name of the M&P

Capacity

Qty

1

Kirloskar KES 55-10

210 CFM

1

2

Kirloskar KES 55-10

210 CFM

1

3

Chicago

210 CFM

1

4

Jamalpur jacks

5 ton

1

5

EOT Cranes

30/5 ton

2

6

Gantry 7.5 T

7.5 ton

1

7

Platform truck

Battery operated

1

8

Dedicated Air Reservoir

3.0 cubic meter

1

9

Dedicated Air dryer

-

3

10

Compressed air tapping points for SCTR and pneumatic tools

 

11

11

SCADA Rake test rig

Connected to all three

pit lines

1

12

Automated Single car test rig

-

1

13

Road Mobile ART

-

1

14

Automatic Coach washing plant

-

1

15

Single car test rig

-

1

4.Coaching Performance:

Parameter

Target (24-25)

Proportionate Target

2025-26

2024-25

For the month Feb 26

Cum

For the month Feb 25

Cum

a

b

c

d

e

f

Ineffective % of AC

2

1.50

0.13

3.0

0.17

3.28

Ineffective % of NAC

1.5

1.13

0.15

0.95

0.06

0.54

Enroute coach detachments

Terr

1

0.92

-

-

-

-

Own

1

0.92

-

-

-

-

Secondary detachments

Terr

-

-

-

-

-

-

Own

-

-

-

-

-

-

Enroute wagon detachments

Terr

1

0.92

-

3

-

1

Own

-

-

-

-

-

-

IOH

NA

NA

32

275

22

292

Coaches marked sick within 100 days of POH

NA

NA

0

11

3

14

Environmental and Housekeeping Management wing on HYB Division

Organization Structure:

Formation of EnHM Wing:

  As per the Railway Board Guidelines Environment & House Keeping Management wing has been formed in Hyderabad Division with posting & assuming of charges by AEnHM/HYB on 14.12.2015

Objectives:

  The objective of this wing is to maintain cleanliness standards in Railway Stations and in Train through OBHS & CTS services through outsourcing.

  Monitoring the Environmental activities over the Division as per the guidelines by NGT and State Pollution Control Boards.                         

Stations under EnHM

1. KCG   - NSG2           - ISO 14001-2015 certified, IGBC Platinum Rating

2. NZB    - NSG3           - ISO 14001-2015 certified

3. KRNT - NSG4           - ISO 14001-2015 certified

4. BSX    - NSG4           - ISO 14001-2015 certified


AEnHM/HYB  work load and activities:

  •      Monitoring of all the four stations cleaning activity.
  •      Ordering of Cleanliness drives as per Rly. boards instruction and monitoring.
  •       Submitting the drive compliance report to HQ
  •      Displaying the posters and banners during drive period and other occasions.
  •      Monitoring and correspondence of environment related works

Details of ART/SPARMV Nizamabad 

  • “B” Class ART
  • Formation - BCNAM1+BRNAHS+3 Coaches.
  • Staff nominated – 02 Sup + 20 staff
  • Beat - NZB-MDAK, NZB-SIPT, NZB-KRMR, NZB-MUE, NZB-MLY, NZB-BDHN
  • Scale-I SPARMV
  • Formation - DPC+TC+DPC (3 Coaches)
  • Staff nominated – 02 Sup + 9 staff 
  • Beat - NZB-MDAK, NZB-SIPT, NZB-KRMR, NZB-MUE, NZB-MLY, NZB-BDHN  

Joint Mock Exercise with NDRF10th BN conducted at Bolaram station on 18.03.2026

  •    

Mock Drill Photographs:

 
-oOo-
Source : South Central Railway Last Reviewed : 26-08-2026