MECHANICAL DEPARTMENT
NED Division is the one of the division in South Central Railway with mainly coaching activities at three C&W Depots at NED, PAU & Jalna. Two Pit lines are under constructions at AWB & ADB. Only freight examination point is at PAU. Total departmental staff sanctioned in NED division Mechanical (C&W) is 349 as on 31.08.2025.
Organizational chart of Mechanical department
Assets of Mechanical department
URL: 1758538665818-Map C&W.pdf
I. Coaching Activities are being carried out at
a.Nanded (NED)
b.Purna (PAU)
c.Jalna (J)
Primary Maintenance (PM):
·Pit line Maintenance including attention recommended schedules
·Attention of passenger amenities and Mechanized coach cleaning of exterior and interior
·Primary maintenance of 16 trains consisting of 30 rakes is being carried out at NED, PAU and J depots.
·New Pit lines are being set up at AWB and ADB
|
Depot Wise Coach Holding |
|||||||
|
Depots |
ICF |
LHB |
Total |
G total |
|||
|
AC |
Non AC |
AC |
Non AC |
AC |
Non AC |
||
|
NED |
31 |
120 |
137 |
148 |
168 |
268 |
436 |
|
PAU |
5 |
115 |
0 |
0 |
5 |
115 |
120 |
|
J |
17 |
20 |
9 |
19 |
26 |
39 |
65 |
|
Total |
53 |
255 |
146 |
167 |
199 |
422 |
621 |
Secondary Maintenance (SM):
·Pit line maintenance is given similar to primary maintenance except attention of schedules as these rakes are owned by other depots/divisions
·secondary maintenance of 1 train (14621/22) is being carried out at NED depot
Other End Maintenance:
·Platform turn round maintenance of 31 trains (19 daily and 12 non daily) is being done at NED,ADB,AWB,NSL,J,HNL&AK, stations.
·Dry cleaning of coach interior, Cleaning of Toilets, watering of coaches, Rolling – in examination and Measuring of Axle bearing temperature is done for trains, which return from Platform only.
Intermediate Overhauling:
·IOH/SS-I schedule is carried out on ICF/LHB types of coaches at NED coaching depots.
Sick Line Maintenance:
·Sick attention of all ICF/LHB coaches is carried out at NED coaching depots.
· Major sick repairs include Wheel changing, spring changing, Brake gear and Draw gear attention.
II. Freight activities are carried out at.
·Purna (PAU)
Freight Rake examination in yards:
Two types of rake examination is carried out at freight depot in the division:
1.Premium rake examination (PRE)
2.End to End rake examination (EE)
|
Description |
2023-24 |
2024-25 |
|
Premium rake examination |
55 |
56 |
|
End to End rake examination |
285 |
200 |
III. Electronic In-Motion Weight Bridge.
Electronic In-Motion Weight Bridge are utilized for weighment of loaded rakes and operation, maintenance of EIWMB is being done by C&W department.
· Periodical calibration, stamping, repeatability & joint inspection by officers is being done.
· 01 sets of Test wagons is available for calibration of all Weighbridges.
· FOIS integration, CC cameras and AMC is available for Weighbridges.
|
Items |
Ownership |
Quantity |
Remarks |
|
Electronic In-Motion Weight Bridge |
Railway |
3 |
All WBs are integrated with FOIS and provided with CC cameras. Located at MTDI,SVW & AWB |
IV. Accident Relief Train:
V.
Depot
|
Class
|
Composition
|
Major Equipment
|
||||||||||||||||||||||||||||||||
PAU
|
‘A’ Class ART
|
140 T crane + 2 Coaches |
140T Gottwald make New Design Hydraulic Crane (JMP).(140 T Crane booked to JMPS for POH Repairs) Com Date 12.02.2025 Coaches RD-1/31, |
||||||||||||||||||||||||||||||||
|
ART (4 coaches + 2 BRNHS) |
MFD Re-Railing Equipment, HRE -03 set (02 MFD & 1 BEMCO) Coaches RD- 04/28, 11/28 6/27 & 12/28. |
||||||||||||||||||||||||||||||||||
|
PAU |
SPMRV |
03 Coaches |
04-Cummins Engine, 02-Main Engine, 02 125 KVA D.G. set, 02-Compresor, 01 set of LUKAS HRD & 01-set of Holmetro HRD. LUKAS make Hydraulic Rescue device. SPMRV Formation max per Speed 110 Kms
|
||||||||||||||||||||||||||||||||
VI.
VII.8
Note: - One Road mobile ART/lorry available at PAU with 1 HRE set of BEMCO
V. Highlights:
a) Installation and Commissioning Hot Axle Hot Wheel Detector System (HAHW)
03 Hot Axle/Hot Wheel Detector Systems (with limited functionality) have been commissioned at the following locations:
·Basmat (BMF) in PAU–AK section on 27.08.2024
·Mugat (MGC) in NED–MUE section on 10.09.2024
·Daulatabad (DLB) in AWB–MMR section on 10.09.2024
These systems use sensors to monitor axle box temperatures. The data is relayed to the next C&W depot, where trains will be examined. If a hot axle is detected, the condition of the CTRB will be checked, and based on the inspection, the wagon will either be allowed to continue or detached.
This system will enhance the reliability of railway assets and contribute to safer train operations. Whenever a hot axle is detected, an alert will be sent to C&W/Control and the nearest TXR point for necessary action.
b) Maintenance facility on Ned Division:
i) IOH Shed NED
i) ii) Pit Wheel lathe shed NED:
iii) Pit Line NED:
i iv) Sick line covered shed PAU:
i)V) Pit Line PAU:
VI) IOH Shed Jalna:
vii) Pit Line Jalna:
c) Development of new pit lines:
i) ADB- Construction of new pit line CAMTECH design of 24 coach length (600 Mtrs), Stabling line (600 mtrs) and sick line and service building.
ii) AWB- Construction of CAMTECH design new pit line of 16 coach length (370 meters)