HYB Div: S&T Annual Achievements / Performance Highlights for the FY 25-26
Telecommunication:-
1.Third (3rd) Control Board constituting the section between Timmapur – Manoharabad – Siddipetstations has been commissioned in the Control Office on 26.11.2025, duly providing Telecom HQ connectivity.
2.CCTV Installation for Safety & Remote Monitoring at 8 LC Gates and 2 stations covering SM Room, Relay Room, Equipment Room, and critical outdoor locations including IBS section between BSX–NVT
3.CCTVs installed and commissioned at STPD A-Cabin, KCG Station, and LC gates of SHNR to cover point zones.
4.02 IP Camerasinstalled at Parking Areato cover Women Employees Rest Room by laying 02 Cat-6 cables from Audit Office.
5.14.56 km of additional OFC and 6-Quad cablesprovided between Basar (BSX) – Navipet (NVT) stations.
6.Provision of CTO phone, Hotline to MOA & ALPR, 25W VHF (Talkpro make), Auto Phone (83958), FCT Airtel (9281035635).
7.BPAC and UFSBI circuitsprovided between PUPU–MOAand PUPU–ALPR.
8.2 Mbps BSNL channelconnected between PRS/SC – GWD Booking Office for media diversity.
9.New FOIS circuitscreated between Secunderabad – Siddipet, Nizamabad – Siddipet, Siddipet – Gajwel, Siddipet – Kacheguda and Secunderabad – Gajwel
10.FOIS locations at new crossing stations ie., Gajwel and Siddipet have been commissioned on 01.07.2025.
11.Voice Logger Equipmentfor recording 12 VHF channels installed at 45 stations.
12.Passenger Amenity & Display Works have been carried out at Manoharabad (MOB), Gajwel (GJWL), Siddipet (SIPT), Nacharam (NCRM) and SSBJ Station
13.Platform Display Boards have been provided at five (5) stations DKC, MRKL, JKAR, MKTL and MNDK
14.Five (5) Multi Display Boards, one at each have been provided at DKC, MRKL, JKAR, MKTL & MND
15.Sensor-based lighting, background music system (Sub-woofer + 4 ceiling speakers), digital clock, CCTV, 75” & Sony Smart TVs with Dish connection at VIP Lounge In view of inauguration of ATITHI VIP Lounge (3rd Floor)and Samanvay / Annapurna Dining Halls on 02.06.2025, telecom arrangements provided include
16.55” Signage Display and 01 CCTV provided near new lift at Ground Floor.
17.UTS system installed with GJWL–LKDM and LKDM–SIPT RCIL 2 Mbps channels.and Provision of CTO phone, Auto phone, Hotline, FCT and 25W VHF set.along with commissioning of new crossing station, Lakdaram.
18.The following Telecom arrangements have been executed in co-operation for a “Mock Drill conducted by National Disaster Response Force (NDRF) Team” at Bolaram station on 18.03.2026.
ØCreation of Webex link for live streaming
ØCommunication arrangements like CTO, TPC, EC, AUTO, FCT Phones, Help Line numbers, Hot Line phones, Railnet etc.
ØA maple equipment for Live video streaming arrangement with a drone.