inner-banner-img

workshop


Performance


Performance

 

Performance

 

Sl. No

Parameter

21-22

2022-23

%

Perf

21-22

Perf

up to

Jan-23

Target

Prop Target

(Up to Jan-23)

Perf

(As on date)

w.r.t

2021-22

w.r.t

Target

2022-23

1

Asset Failure

5

3

1

2

2

33.3

100

2

Punctuality

0

0

1

Direct -1

Indirect-1

2

200

100

3

Outage

1.99

1.15

4.7

7.14

7.14

83.89

34.1

4

Lube to Fuel Ratio

1.41

0.78

0.6

1.0(Dec-22)

1.0(Dec-22)

22

40

5

Ineffective

Loco

1.08

0.97

6.0

2.29

2.29

57.64

61.83

DPC

7.28

7.55

12

9.89

9.89

23.66

17.58

TC

4.46

4.72

7

4.05

4.05

14.9

42

6

Scrap

Ferr

38.44

38.35

213 M/T

265.584

265.584

592.52

19.79

Non-Ferr

9.323

9.3

18 M/T

30.733

30.733

69.73

41.43

7

SFC Pass

3.05

3.04

2.8

3.27

3.27

7

14.37

8

SFC Goods

-

-

2..0

-

-

   

9

SFC DEMU

1.56

1.13

1.9

1.92

1.92

41

0.10

10

IOD cases

Nil

Nil

--

2 Cases

2 cases

200

200

 

 

 

 

Source : South Central Railway Last Reviewed : 29-05-2026