inner-banner-img

workshop


Salient Features


Salient Features

 

Salient features:

1. 

Total Area of Workshop

21.83 hectares/53.95 Acres

2. 

Covered Area

9.82 hectares/ 24.27 Acres (45%)

3. 

Rail track length

8.25 Kms.

4. 

Machinery & Plants

509 nos.

5. 

Railway Quarters

584 nos.

6. 

WMS Budget 2023-24

(Workshop Manufacturing Suspension)

Figs. In Crores

Mechanical

Electrical

Total

Net Debits

321.71

84.18

405.89

Net Credits

319.55

85.02

404.57

7. 

Targets 2023-24

Periodic Overhauling (POH) of Coaches

IntermediateOverhauling (IOH) of bogies

1622 Nos.

ICF

LHB

1024

421

8. 

Average Monthly Power consumption in KWH

Grid

201730

Solar

68017

9. 

Manpower as on 01.04.2023.

(Mech. + Elec.)

Department

Sanctioned

Actual

Vacancies

Mechanical

2519

2090

429

Electrical

627

459

168

Total

3416

2549

597

               

 

Present activities of the Workshop:

· Periodic Overhauling (POH) of Air Conditioned & Non Air Conditioned Broad Gauge ICF/LHB Designed coaches.

· Intermediate Overhauling (IOH) of ICF Designed Conventional and LHB designed FIAT Bogies.

· POH of DEMU,EMU/MEMU Power & Trailer cars & SPART coaches

· POH of Tower cars(4W & 8W)

· POH of Defence owned and camping coaches

· Supply of Wheel sets, Distributor Valves (DVs) & Bogie Mounted Brake Cylinders (BMBCs) to divisions.

· LOFP/SC: Assembly and Supply of Lube oil & Fuel oil filters of Diesel Locomotive to all over Indian Railway.

· RBK/Yadgir: Manufacturing of LHB Bogie frames.

 

 

Source : South Central Railway Last Reviewed : 28-05-2026