Salient features:
|
1.
|
Total Area of Workshop
|
21.83 hectares/53.95 Acres
|
|
2.
|
Covered Area
|
9.82 hectares/ 24.27 Acres (45%)
|
|
3.
|
Rail track length
|
8.25 Kms.
|
|
4.
|
Machinery & Plants
|
509 nos.
|
|
5.
|
Railway Quarters
|
584 nos.
|
|
6.
|
WMS Budget 2023-24
(Workshop Manufacturing Suspension)
|
Figs. In Crores
|
Mechanical
|
Electrical
|
Total
|
|
Net Debits
|
321.71
|
84.18
|
405.89
|
|
Net Credits
|
319.55
|
85.02
|
404.57
|
|
7.
|
Targets 2023-24
|
Periodic Overhauling (POH) of Coaches
|
IntermediateOverhauling (IOH) of bogies
|
|
1622 Nos.
|
ICF
|
LHB
|
|
1024
|
421
|
|
8.
|
Average Monthly Power consumption in KWH
|
Grid
|
201730
|
|
Solar
|
68017
|
|
9.
|
Manpower as on 01.04.2023.
(Mech. + Elec.)
|
Department
|
Sanctioned
|
Actual
|
Vacancies
|
|
Mechanical
|
2519
|
2090
|
429
|
|
Electrical
|
627
|
459
|
168
|
|
Total
|
3416
|
2549
|
597
|
| |
|
|
|
|
|
|
|
Present activities of the Workshop:
· Periodic Overhauling (POH) of Air Conditioned & Non Air Conditioned Broad Gauge ICF/LHB Designed coaches.
· Intermediate Overhauling (IOH) of ICF Designed Conventional and LHB designed FIAT Bogies.
· POH of DEMU,EMU/MEMU Power & Trailer cars & SPART coaches
· POH of Tower cars(4W & 8W)
· POH of Defence owned and camping coaches
· Supply of Wheel sets, Distributor Valves (DVs) & Bogie Mounted Brake Cylinders (BMBCs) to divisions.
· LOFP/SC: Assembly and Supply of Lube oil & Fuel oil filters of Diesel Locomotive to all over Indian Railway.
· RBK/Yadgir: Manufacturing of LHB Bogie frames.