Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

Citizen Charter

Trains & Timings

Passenger Services / Freight Information

Public Information

Tenders

Contact Us

Corporate Social Responsibility
Hyderabad Division
Vijayawada Division
Head Quarters
Secunderabad Division
Guntur Division
Nanded Division
Guntakal Division
Swachh Rail-Swachh Bharath
Headuarters
Hyderabad division
Secunderabad
Guntakal division
Guntur division
Nanded division
Vijayawada division
Press Releases
Bill Status
Applications & Bills Status
Important Information
Results & Notifications
Survey & Construction
For Railway Personnel
Registration Policy for Vendors
Other information
FREQUENTLY ASKED QUESTIONS BY VENDORS:
Downloads
Procedure & Application Forms
Appointment under Sports Quota
Appointment under Scouts & Guides Quota
Appointment under Scouts & Guides Quota
Appointment under Cultural Quota
MEDICAL DEPARTMENT
Waival of Demurrage and Wharfage
COMMERCIAL BRANCH
Guidelines & Instructions for Registration of Contractors/ Suppliers/ Vendors for expenditure contracts
Registration of Medical Pharmaceutical firms in Chief Medical Director-s Office, South Central Railway, Secunderabad
Registration of Private Hospitals for Health Care with South Central Railway
Submit Complaints
Public Information Regarding Train Accident
Train Accident Inquiry Reports
Accident Train Inquiry Reports
Old Notifications
 
Bookmark Mail this page Print this page
QUICK LINKS
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.302/2021-2222-07-2021
Secunderabad
SCR undertakes steps for Monsoon Preparedness - Action plan formulated for effectively tackling the monsoon related issues.


South Central Railway accords utmost priority to the safety of its passengers. The Zone has identified vulnerable locations (including bridges) which need special attention during the Monsoon season. The Zone has formulated an action plan for implementation across all Divisions in its jurisdiction for effectively tackling the monsoon season related issues. The action plan has been devised taking into account inputs from all the sections of multi-disciplinary teams involved in train operations and infrastructure maintenance.

Some of the major thrust areas given importance as part of the SCR’s monsoon preparedness includes:

1. Monsoon Patrolling of Track and watching of vulnerable locations / Bridges: Monsoon Patrolling of tracks in identified block sections is carried out during this period and vulnerable locations and bridges are kept under watch by posting stationary watchmen. During periods of abnormal rainfall or storm in any section, Patrolling is introduced till clear weather is restored.

2. Railway Affecting Tanks: Around 1900 Railway Affecting Tanks are identified o­n the Zone which are inspected jointly by Railway officials and concerned State Govt. Officials. State level meetings with concerned Irrigation officials are conducted to review the status of the tanks and repairs. A close liaison is maintained with the State Govt. officials o­n the current status of these tanks during monsoon.

3. Water Levels of Reservoirs and Dams: Liaison with State Irrigation authorities have been established by Divisional Railway officials to keep a close watch o­n the Bridges connected to Dams and reservoirs so that timely action can be taken by Railways in case of release of excess water.

4. Weather Warning and Cyclone warning message: System exists with respective Meteorological departments for receiving Weather Warning/Cyclone messages, which are promptly disseminated to all concerned field officials to take action.

5. Anemometers: 30 Anemometers have been installed o­n station buildings close to the identified Bridges to give warning in case of high wind speed, so as to take prompt action to regulate train traffic.

6. Water level monitoring system: 12 automated water level monitoring devices are installed o­n identified Bridges which provide continuous data of water levels at these bridge locations.

7. Keeping sufficient reserve stock: Monsoon Emergency Reserve Stock materials to restore Track / Bridges are stacked o­n land as well as o­n goods wagons at nominated places in the Divisions to meet any eventuality due to flooding / breaches.

Shri Gajanan Mallya, General Manager has instructed all the Officials and staff of the Zone to be extra cautious during this period to tackle any kind of situation. He also instructed officials of all the six divisions to strictly implement safety precautions and reiterated that there should be “Zero tolerance to safety”. The movement of passenger trains should be closely monitored and in case of regulation or disruption of train services, the information should be given at the earliest to the public, he added.





  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.