Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

Citizen Charter

Trains & Timings

Passenger Services / Freight Information

Public Information

Tenders

Contact Us

Corporate Social Responsibility
Swachh Rail-Swachh Bharath
Headuarters
Hyderabad division
Secunderabad
Guntakal division
Guntur division
Nanded division
Vijayawada division
Press Releases
Bill Status
Applications & Bills Status
Important Information
Results & Notifications
Survey & Construction
For Railway Personnel
Registration Policy for Vendors
Other information
FREQUENTLY ASKED QUESTIONS BY VENDORS:
Downloads
Procedure & Application Forms
Appointment under Sports Quota
Appointment under Scouts & Guides Quota
Appointment under Scouts & Guides Quota
Appointment under Cultural Quota
MEDICAL DEPARTMENT
Waival of Demurrage and Wharfage
COMMERCIAL BRANCH
Registration of Medical Pharmaceutical firms in Chief Medical Director-s Office, South Central Railway, Secunderabad
Registration of Private Hospitals for Health Care with South Central Railway
Submit Complaints
Public Information Regarding Train Accident
Train Accident Inquiry Reports
Accident Train Inquiry Reports
Old Notifications
 
Bookmark Mail this page Print this page
QUICK LINKS
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
No.150/2023-2414-06-2023
Secunderabad
PR No. 150 - Cyclonic Storm

India Meteorological Department (IMD) has issued latest bulletin No. 43 (ARB/01/2023) dated 11.6.23 at 17.10 hr. As per the bulletin, the extremely severe cyclonic storm “BIPARJOY” over East Central Arabian sea is moving and may affect Saurashtra & Kutch Areas. Forecast of Cyclone “Biparjoy’ for the next 4 days commencing from 11th to 14th June” 2023 has been made over all Saurashtra area. The storm is expected to affect Saurashtra & Kutch areas. The vulnerable sections include Bhavnagar, Mahuva, Veraval to Porbandar area, OKHA to HAPA and Gandhidham area. The landfall is predicted to occur near Mandvi-Jakhau Port o­n the evening of the 14th.

Indian Railways has implemented various measures to ensure the safety and minimize the impact of the cyclone.

These include:

 

1.Activation of Disaster Management Room at the Zonal Railway headquarters and round-the-clock manning by various departments.

2.Operation of emergency control rooms at division headquarters in Bhavnagar, Rajkot, Ahmedabad, and Gandhidham.

3.Regular Monitoring of wind speed at multiple locations and instructions to regulate or stop trains if wind velocity exceeds 50 kmph. Anemometers have been installed at stations and reading of wind speed is being taken o­n hourly basis.

4.Formation of o­nline Groupsfor real-time monitoring and co-ordination.

5.Continuous monitoring of cyclone-related information o­n mausam.imd.gov.in website.

6.Availability of sufficient diesel locomotives and coaching rakes for emergency evacuation.

7.Suspension of loading of double stack containers and restriction o­n their movement.

8.Review of passenger train schedules and necessary decisions based o­n the cyclone situation.

9.Readiness of a relief train.

10.Counseling of Loco Pilots & Assistant Loco Pilots regarding safety protocols during cyclone/storm conditions. All the necessary arrangements (food, medical etc) have been done at various Running Rooms meant for crew rest.

11.Instructions to keep doors and windows of coaches open for the free passage of wind.

12.Intensive footplate inspections have been conducted for close monitoring.

13.Arrangements for the availability of fully fueled diesel locomotives and filled RCD fuel tanks back to normal operations after cyclone in case road infrastructure for RCD fuel movement is hampered.

14.Alternate communication arrangements

a.Emergency Control Room including satellite phones, FCT, and DOT phones in case of communication failure.

b.VHF sets are available for site communication

15.Alternate Power arrangements

a.Tower wagon Drivers and TRD staff of all Depot will remain o­n alert.

b.If Power grid supply gets disturb, then train services will run o­n Diesel traction.

c.On power supply failure at Junction Stations, control rooms and Major colonies, pumps etc., power supply will be given through DG sets.

16.Arrangements for Reserve Material, Machinery and Man Power.

a.Station wise details of all critical materials such as rubble, ballast, quarry dust and quarry dust o­n ground as well as o­n wheels has been prepared.

b.Loading of material in wagons has been organized and loading shall be continued at night.

c.Poclain, JCB Machines etc have been hired and arrangements for the stay of Divers have been made.

d.The details of agencies having heavy earth moving machinery, trucks, ropes, chain saw, dewatering pumps, pick up vans etc has been assessed and they have been put o­n alert.

e.Mobilization of manpower, both departmental and contractual has been done

f.3 Teams have been formed at Dwarika, Jamnagar and Surendranagar stations comprising of supervisors of various branches for better co-ordination.

17.Monitoring of Track and Bridges:

The patrolling of track and bridges is done o­n a continuous basis.

18.Monitoring COP, and FOBs

a.Prior survey and necessary securing of sheets has been done. All station platform shelters have been secured appropriately

19.The wind velocity is being measured and monitored hourly basis in order to impose traffic restrictions for movement o­n bridges (maximum wind speed of 60 Kmph). Monsoon precautions shall also be implemented fully.

20.Identification and cutting of vulnerable trees near the track.

21.Special Instructions for Safety

Special instructions for safety, including LC boom closure and withdrawal of staff from LCs functioning from porta cabins.

22.OHE and Transmission lines

Monitoring and inspection of OHE and transmission lines, liaison with electricity authorities, and provision of standby power devices.

23.Signaling and telecommunication arrangements

a.Installation of DG sets, and availability of spare parts is done

b.15 FCT, 2 satellite phones and walkie talkie sets in ART/ARMEs will be used for emergency communication.

24.Readiness of ART/ARMEs (Accident Relief Trains/Accident Relief Medical Equipment) at strategic locations. All staff has been strictly directed to use personal protection equipments like Helmets, shoes etc.

25.Security arrangements by RPF

a.The deployment of a RPSF (Railway Protection Special Force) coy (company) to assist in emergencies.

b.RPSF Company from nearby divisions have been deployed at the cyclone prone region to meet the emergency situation.

c.Officials have been advised to coordinate with, GRP, City police, Civil authorities, SDRF and NDRF in view of the cyclone and to take necessary assistance in case of emergency.

26.Arrangements For Stranded Passengers

a.Catering Stalls will remain open during cyclone affecting period with sufficient stock of water & Food materials.

b.Regular announcements will be made regarding the status of cyclone to alert passengers.

c.Help Desk is opened at various stations in the cyclone prone areas.

d.Tie up with the state transport services for shifting of passengers to their destination in case of need.

27.Medical Preparedness :

a.Ambulances and Sufficient Medicines are kept ready at Hospitals & Health Units.

b.Medical State authorities and empaneled hospitals in the cyclone area are in contact to shift patients if needed.

c.Railway Medical Team is in contact with the State Medical Team and coordinating with them and also with the Empaneled hospitals to shift patients in case of emergency.

d.Gujarat State Ambulance Toll free No. 108 alerted.

e.The other local hospitals have also been alerted to deal with casualties.

f.All doctors and paramedical staff o­n alert in Mumbai.

28.Continuous monitoring from Railway Board War Room.

 






  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.