Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

Citizen Charter

Trains & Timings

Passenger Services / Freight Information

Public Information

Tenders

Contact Us

Corporate Social Responsibility
Swachh Rail-Swachh Bharath
Headuarters
Hyderabad division
Secunderabad
Guntakal division
Guntur division
Nanded division
Vijayawada division
Press Releases
Bill Status
Applications & Bills Status
Important Information
Results & Notifications
Survey & Construction
For Railway Personnel
Registration Policy for Vendors
Other information
FREQUENTLY ASKED QUESTIONS BY VENDORS:
Downloads
Procedure & Application Forms
Appointment under Sports Quota
Appointment under Scouts & Guides Quota
Appointment under Scouts & Guides Quota
Appointment under Cultural Quota
MEDICAL DEPARTMENT
Waival of Demurrage and Wharfage
COMMERCIAL BRANCH
Registration of Medical Pharmaceutical firms in Chief Medical Director-s Office, South Central Railway, Secunderabad
Registration of Private Hospitals for Health Care with South Central Railway
Submit Complaints
Public Information Regarding Train Accident
Train Accident Inquiry Reports
Accident Train Inquiry Reports
Old Notifications
 
Bookmark Mail this page Print this page
QUICK LINKS
   

SOUTH CENTRAL RAILWAY
PRESS RELEASE
PUBLIC RELATIONS OFFICE, SECUNDERABAD - 500 071
350/2023-2421-08-2023
Secunderabad
Indian Railways implements Provision of 750 V power supply for maintenance of Linke Hofmann Busch (LHB) rakes at washing/sick lines

 

ØIndian Railways awards infra creation at 411 washing/pit lines covering entire country at Rs 210 Crores

Ø316 Washing/Pit lines completed by end of July, 2023

ØRest are targeted for completion by Q2 of 2023

ØThe infrastructure so created would yield a net savings of Rs 500+ Cr every year in Ordinary Working Expenses

ØThis work is a step towards IR’s low carbon transition pathways to adopt a carbon neutral growth strategy

 

In November 2016, Railway Board took a policy decision to switch over 100% of its production to LHB coaches from April 2018.An energy review undertaken at the Railway Board showed that at 2021-22 base the diesel consumption o­n testing and maintenance of LHB rakes at washing / pit lines was about 1.84 lakh litres per day amounting to an annual recurring expense of approx. Rs 668+ Cr which was projected to increase @ 20+% p.a. being a combined function of diesel prices and LHB fleet induction. Comparatively, grid electrical energy is 70% to 80% cheaper. This issue is typical to LHB and does not arise in ICF coaches, and therefore, infrastructure and capacity creation at washing/pit lines by providing 750V power supply for testing & maintenance of LHB rakes was important.

With this aim, capital works for 411 washing / pit lines o­n Indian Railways (IR) were sanctioned at a total capital cost of approx. Rs 210 Cr. It was a thrust area monitored by the Railway Board in a span of less than o­ne year, capital works were sanctioned and works awarded for infra creation at 411 washing / pit lines, covering entire IR and by end of July 2023 works at 316 washing / pit lines have been completed. Rest is targeted for completion by Q2 of 2023.

The infrastructure so created, by investing a capital of Rs 210 Cr in infra capacity creation at washing / pit lines, would yield a net savings of Rs 500+ Cr every year in Ordinary Working Expenses. Coupled with the target of HOG compliant locomotive fleet o­n IR, savings shall be much higher. This are a part of IR’s efforts to improve operational viability of passenger services, particularly Mail / Express segment through non-tariff measures by reducing costs and improving efficiency with optimization.

IR is deeply committed to cutting fossil fuel dependence and reduce its carbon footprint in the economy to achieve Net Zero by 2030. The Hon’ble PM had laid down this in the National Statement at COP 26. This work is a step towards IR’s low carbon transition pathways to adopt a carbon neutral growth strategy.

The above showcases IR’s relentless pursuit in identifying works and areas that fetch discernible benefits - in terms of safety, cost economies, carbon footprint and HR efficiency.

Work: ‘Provision of 750 V power supply for maintenance of LHB rakes at washing/sick lines’

 

Cost

Benefit

IR’s Total Capital Cost

Rs 210 Cr approx.

Rs 500+ Cr annual recurring net cash savings in O.W.E. (Ordinary Working Expenses) at 2021-22 base

Non-tariff measure to reduce losses / subsidy o­n passenger services: Rs 500+ Cr is a direct reduction of cross-subsidization of passenger by freight services in general and improves operational viability of passenger services in Mail / Express segment in particular.

16CO2"> e emission reduction by energy substitution - fossil fuel with grid

HR and better Safety (by eliminating diesel use of this high scale)

 





  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.