 ELECTRICAL


MAINTENANCE

Role:

Electrical Maintenance organization is one of the branch in Guntakal Division entrusted with Maintenance of all Electrical Equipments working on voltage up to 11,000 Volts.

This Department is responsible for Maintenance of the following power supply installations at
141 Electrified Stations and Train lighting & Air conditioning depots over the division.

  • 6615 Electrified Staff Quarters.
  • 37 Nos. of 11KV/440 V Sub-stations.
  • 267 Pumping Installations.
  • 68 AC Coaches and 499 Non AC Coaches.
  • Un-interrupted power supply at 112 PRS / UTS locations.
  • Fans & Lighting arrangements at all stations, Staff quarters, service buildings and pump houses.

Organization:

Electrical General services is headed by Senior Divisional Electrical Engineer (Maintenance) and assisted by Assistant Divisional Electrical Engineer (Maintenance) looking after Train Lighting, Air Conditioning and Power Maintenance.



For maintenance of Coaches, Main depots are located at Tirupati and Guntakal.


There are 09 Main depots located at
Guntakal, Raichur, Gooty, Kadapa, Nandalur, Renigunta, Tirupati, Pakala, Dharmavaram & Dhone to look after maintenance of power equipments / installations at 141 stations over the division


Achievements:

National Energy Conservation Award 2012 was received by Chief Electrical Engineer, Secunderabad from Hon’ble President of India in Hospital Sector for the conservation measures adopted in Divisional Railway Hospital, Guntakal.


Passenger Lifts:

03 Nos. of passenger lifts were provided at Tirupati for the convenience of passengers.

03 Nos. of passenger lifts were provided at Guntakal for the convenience of passengers
 

Centralized Air cooling system:

02 Nos. of 35000 CFM capacity Centralized air cooling plant at Tirupati in concourse area have been commissioned to provide passengers comfort. And 3 Nos. of 12,500 cfm capacity Air cooling arrangements have been provided in Running room at Tirupati.






Chilled water coolers:

Chilled water coolers of 1200 LPH capacity have been provided at 12 major stations viz., Tirupati, Renigunta, Anantapur, Dharmavaram, Guntakal, Chittoor, Yadgir, Adoni, Mantralayam Road, Raichur, Cuddapah & Dhone stations.


High Mast Lighting:·
  • 16 Mtr. long High Mast tower lights were provided in the circulating areas at Tirupati, Renigunta, Sri Kalahasti, Kodur, Venkatagiri, Anantapur, Dharmavaram, Kadiri, Gooty, Guntakal, Chittoor, Pakala, Yadgir, Adoni, Mantralayam Road, Raichur, Cuddapah, Dhone stations.

    16 Mtr. long High Mast tower lights were provided in the loading / unloading area at Tadipatri, Hagari, Bethamcherla stations.

    .
  • Mobile charging points:

    At all A1, A, B & D category stations Laptop / Mobile charging points provided at important locations viz., Waiting halls, Platforms, Retiring rooms, Concourse areas etc.

Signage boards:

Glow sign boards have been provided at all A1, A, B & D category stations.



Energy Conservation:

Solar Geyers:

Solar geysers have been provided at 09 stations for hot water provision & to conserve energy at the following locations:

Retiring rooms:Guntakal, Anantapur, Cuddapah, Renigunta, Tirupati

Running rooms:Guntakal, Raichur, Dhone, Dharmavaram, Nandalur, Renigunta, Tirupati

TTE’s rest house:Guntakal, Dharmavaram, Renigunta

Officers rest house:Tirupati

Holiday Home:Tirupati

RPF barracks:Guntakal

Training school:Guntakal

Railway Hospital:Guntakal



During the year 2012-13 13 Nos. of Solar Water Heaters have been provided over the division





  • Energy Conservation:

    Solar Geyers:

    Solar geysers have been provided at 09 stations for hot water provision & to conserve energy at the following locations:

    Retiring rooms:Guntakal, Anantapur, Cuddapah, Renigunta, Tirupati

    Running rooms:Guntakal, Raichur, Dhone, Dharmavaram, Nandalur, Renigunta, Tirupati

    TTE’s rest house:Guntakal, Dharmavaram, Renigunta

    Officers rest house:Tirupati

    Holiday Home:Tirupati

    RPF barracks:Guntakal

    Training school:Guntakal



    Natural pipe lighting

    05 Nos. of Natural pipe lighting system provided in Personnel branch at Guntakal to conserve energy.

    Occupancy sensors:

    40 Nos. of occupancy sensors for Lights & AC control haven been provided in Officers chambers, Waiting Halls, VIP lounges etc., to conserve energy

Solar LC gates:

81 Nos. of LC Gates were provided with Solar home lights / Street lights over the division

                                      LC-123                                                                                   LC-172

LED inspection lights:

LED based inspection lighting arrangements provided at Guntakal, Tirupati, Raichur, Dhone, Renigunta & Kondapuram to facilitate under gear examination and carriage watering.

                   Kondapuram                                                    Renigunta

LED based lighting in General Service applications have been provided intensively too.

       Anantapur booking office                                                                               Anantapur concourse area

CDM project:

Under Clean Development Machinery (CDM project) 16431 Nos. of CFLs have been distributed among staff residing in Rly. Qtrs. at all stations to bring awareness for usage of energy efficient fittings and as a measure to conserve electrical energy.

Energy efficient pumps:

22 Nos. Energy efficient pumps have been commissioned in place of old and inefficient pumps over the division during the year to conserve energy.

Star rated electrical equipments:

507 Nos. of Star rated electrical equipments of 3 Star rated and above were provided such as AC plants, Geysers, Pumps, Ceiling fans etc., in waiting halls, retiring rooms, service buildings etc., where consumption is normally on higher side during the year 2012-13.


Replacement of conventional type items with energy efficient items during the year 2012-13.

Fan regulator with electronic fan regulators

450 Nos.

KWH meters with electronic ones

365 Nos.

T12 FTL fittings with T5 fittings 25734

947 Nos.

Fans with energy efficient fans

483 Nos.

Innovations:

Automation of pumps:



Automation of pumps with GPRS Technology at 3/3 pump house at Pakala and 3 Nos. at Renigunta have been provided to save man power and saving of energy. 

                              RU                                                                                       PAK

Platform lighting automation with signal interlocking:

30% & 70% Platform lighting automation with Signal interlocking has been commissioned at Raichur, Guntakal, Gooty, Cuddapah, Rajampeta, Anantapur, Dharmavaram, Renigunta, Tirupati & Dhone stations (10 stations). This will save man power as well energy.


PF 2

 



 


 




132 Nos. of 70% platform lighting control with OFF delay timer circuits have been commissioned to conserve energy as against 166 Nos. of identified platforms. 

 PF-1       PF-2          PF-3                  PF-1                    PF-2

                PAK                                                       AD

Improvements:

04 Nos. of inflatable tower provided at GTL, RU, DMM & PAK to facilitate immediate lighting at accident site/restoration of breach sites.


150W Metal halide fittings, 2 mtr. & 6 mtr. Long telescopic stands are provided in ART formation at GTL, RU, GY & DMM as per the Rly. Bd. Scale of fittings


OVP test kit has been developed in house to check the healthiness of OVP trip at the preset values in 4.5 KW RRU & 25 KW RRU


Eddy Dyno Drive: 75 HP VVVF drive has been commissioned at IOH shed TPTY for ensuring generation of 25 KW alternator and load sharing of alternators in AC coaches.


Existing Eddy current Dyno driveModified Eddy Dyno drive


VVVF Drive: 10 HP VVVF Drive for testing of 4.5 KW Alternator has been commissioned at Tirupati.

Pre-cooling points:

40 Nos. of pre-cooling points provided at TPTY PF No.1, 2 & 3, 4 & 5 and sick line to facilitate
pre-cooling of AC coaches to provide comfort at originating stations.

 


Battery chargers:

06 Nos. of 200 Amps capacity Battery Chargers have been installed & Commissioned in all
Non-AC Coaches at Tirupati to ensure proper working of Lights & Fans in coaches.


Energy Auditing:

At 5 major locations Energy auditing has been done for load centers, Sub-stations, pumping installations, station lighting over the division.

Energy Consumption Pattern of Division:

 

Major assets maintaining by the GTL Divn.

Power Maintenance:

No. of HT Services:26

No. of HT Sub-stations:37

No. of Power Transformers:71 (ranging from 70 – 500 KVA)

No. of LT Services:440

No. of DG sets:49 (16 at stations)

No. of Pumps:267

No. of Water Coolers:137

No. of stations with water coolers:26

No. of AC plants:358

No. of Lifts:07 (TPTY – 03;GTL-03; GTL Hospital – 01)

UG Power line crossings:263

OH Power line crossings:172

No. of Manned LC Gates:246

No. of Manned LC gates Electrified:246

No. of LC gates with Solar:81

Carriage Watering stations: Renigunta, Mantralayam & Kondapuram

Avg. monthly consumption:2.10 million units

Supply availed from:AP DISCOMS, TNSEB, GESCOM

Train Lighting & Air Conditioning:

Primary maintenance of 499 TL coaches and 68 AC coaches are under taken at Tiruapti and Guntakal depots.

Performance of AC coaches

Sl. No.

Equipment failed

Total population

Total Failure

2010-11

2011-12

2011-12

[Up to Dec]

2012-13

[Up to Dec]

1

Alternator 25 KW/ 18KW

136 Nos

15

25

21

13

2

RRU/ ERRU

136 Nos

05

02

2

3

3

Cells 1100 AH

3808 Nos

08

10

7

16

4

V Belts

136 sets

66

35

26

34

5

Battery Charger 200A

68 Nos

0

02

1

3

6

RMPU’s

136 Nos

23

41

33

48

7

Inverters 25KVA

136 Nos

05

11

9

1

8

Cable defects

--

06

00

0

0

Total

128

126

99

118

Performance of TL coaches

Sl. No.

Equipment failed

Total population

Total Failure

2010-11

2011-12

2011-12

[Up to Dec]

2012-13

[Up to Dec]

1

Alternator 4.5 KW

519 Nos.

12

08

8

7

2

RRU 4.5 KW

459 Nos.

11

14

13

0

3

ERRU 4.5 KW

60 Nos.

03

05

5

0

4

Cells 120 AH

9417 Nos.

36

28

28

1

5

V Belts

519 Sets

63

76

68

41

6

Battery box repair

1038 Nos.

--

--

--

2

Total

125

131

122

51

Man Power:

Category

Sanction

On Roll

Vacancy

Power lighting wing

318

314

04

Train lighting wing

157

144

13

Air Conditioning wing

123

112

11

Supervisors

22

21

01

Ministerial & General staff

36

30

06

Total

656

621

35




Source : South Central Railway CMS Team Last Reviewed on: 17-07-2017  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.