Operating Department, Guntur Division

- An Overview

Guntur Division was operationalized with effect from 1st April, 2003 with a jurisdiction of 674.22 Route Kilometres (597 km electrified and 77km non electrified) by amalgamating 3 sections of 3 adjacent divisions viz., 369.39 Kms. from BZA Division, 141.29 from Guntakal Division and 107.88 Kms, from Secunderabad Division.

Double line: GNT-KCC, GNT-TEL, GNT-NLPD, PRCA-STUR (Electrified).

Single line: NLPD-PGDP,  NLPD-PRCA, STUR-NDL, NDKD-MCLA(Electrified),                        

                   RAL-TEL, PGRN-SYM (Non-electrified)

Works in progress: GNT-GTL doubling, NDKD-KHT new line, RAL-TEL electrification. GNT-PGDP doubling sanctioned.

Guntur Division has a total of 63 stations and 4 block cabins connected to GNT Jn station. All the Block stations and Cabins are equipped with panel-interlocking with Multiple Aspect color light signaling.

This division is serving industrial as well as agriculturally rich areas of 3 districts of Andhra Pradesh and 2 districts of Telangana States.

Outward traffic:

Details of active Sidings and Goods Sheds in Guntur Division

S.

No

 SIDINGs

Loading

Commodities

S.

No

 STATIONs

 Loading  

 Commodities

1

M/s India Cements Ltd – Vishnupuram (ICLV)

Cement & Clinker

8

NANDYAL

 Cement, Clinker, Maize,

Fertilizers (R/b)

2

Penna Cement siding – Janpahad (MPJP)

Cement

9

REDDIPALEM

GOODS

DOC, Fertilizers, (R/B),Rice,Dry Chillies

3

 Deccan Cement Siding – Janpahad (MDCJ)

Cement

10

NARASARAOPET

 Rice, Fertilizers (R/B),

4

Food Corporation of India - Nalgonda (PFCI)

Rice

11

MIRYALAGUDA

Fertilizers (R/B),

5

Food Corporation of India – Miryalaguda (FCIM)

Rice,

12

NALGONDA

RICE




6

M/s Matrix  ware housing Pvt. Ltd – Miryalaguda (MWMS)

Rice

13

NADIKUDI

RICE

7

M/s Lakshmi Narasimha Swamy Pvt Ltd-PLIN-@NRDP

Rice

14

GUNTUR CONCOR

SIDING (CNGT)

 Containers

Commodity wise % contribution to traffic basket for the FY 2019-20

During 2019-20, about 1.554 M.T.s of originating freight traffic moved, earned freight of Rs.201.19 Crores.

Commodity-wise loading - in million tonnes – FY 2019-20 :



Earnings Performance – FY 2019-20:

From

the Head

                       FY - APRIL - MARCH

 Target

2019-20

Performance

% Variation over

2018-19

2019-20

2018-19

Target

Goods

328.84

195.07

201.19

3.13%

- 39%

Revenue Loading performance in GNT Division– FY 2015-16 to 2019-20:

Inward traffic: The details of commodities handled at the unloading stations in Guntur division are as follows.

S.

No.

 To station

Unloading

Commodities

S.

No.

 To station

Unloading

Commodities

1

 Reddipalem

 Goods

Fertilizers, Rice,

Tractors

6

 Nadikude

Fertilizers, Rice

2

 Nandyal

G/SLAG,

Fertilizers, Rice

7

M/s India Cements Ltd – Vishnupuram (ICLV)

COAL, SLAG, CONCOR

3

 Narasaraopet

Fertilizers, Rice

8

Penna Cement siding – Janpahad (MPJP)

COAL

4

 Miryalaguda

Fertilizers, Rice

9

 Deccan Cement siding – Janpahad (MDCJ)

COAL

5

 Nalgonda

Manganese-Iron-ore,    Gunny bags

10

GUNTUR CONCOR

SIDING (CNGT)

Containers

Interchange performance: Apart from the originating freight trains, several through loads are being run on the division with majority of trains running with CC+8 / CC+6 loads on KCC-NDL / NDL-KCC section which is part of the route connecting power houses located at Muddanuru / Raichuru. The interchange has been maintained at an average of 40.8 trains per day during F.Y-2019-20.

YEAR

KCC

TEL

NDL

PGDP

MTMI

TOTAL

T/O

H/O

T/O

H/O

T/O

H/O

T/O

H/O

T/O

H/O

T/O

H/O

2019-20

9.1

9.0

0.6

1.0

8.4

8.1

1.2

1.3

0.9

0.8

20.2

20.6

2018-19

9.7

9.5

0.5

1.0

9.1

8.6

1.3

1.6

-

-

20.6

20.6

 Speed of Goods trains:      (Source: SC – 137 FOIS Report figs.)   

         

APR’19 - MAR’20

APR’20 - SEP’20

Section

Distance  in KMs

UP

DN

Avg

UP

DN

Avg

NLPD – NDKD

90.25

17.0

11.7

14.3

47.4

47.3

47.3

NDKD – NRDP

148.67

19.9

25.2

22.5

50.3

50.4

50.3

NLPD – DKD

115.08

34.2

25.0

29.6

53.3

53.9

53.6

DKD - NDL

136.90

21.8

23.8

22.8

44.5

50.9

47.7

Average

20.8

Average

47.8

Coaching Operations:

Guntur being a new division also visualized its dream of setting up one new station i.e. “New Guntur Station” and opened for traffic on 15.02.05. Three pairs of Express trains 16031/16032 MAS-JAT-MAS, 16093/16094 MAS-LKO-MAS, 17643/17644 MAS-COA-MAS have been diverted via New Guntur coaching terminal without touching Guntur yard.

There were 22 Express trains & 32 passenger trains running on this division per day before formation and after 01.04.03, the division is running an average of 46 Express &67 passengers per day with facility of running DEMUs/MEMUs, meeting local commuter needs.

Punctuality: Division has judicious and best utilization of sectional booked speed / MPS of 95/100 KMPH on the division and excelled in punctuality exceeding targets set by administration in achieving Super fast /Mail / Express trains Punctuality by proper planning and close monitoring of operations.

 

S.

No.

Subject

Target

FY

19-20

19-20

18-19

Variation                       % age over  L/Yr

Variation                       % age over  Target

1

Mail / Exp.

Punctuality

95%

88.5%

85.9%

2.6%

-6.5%

2

Passenger

punctuality

95%

85.7%

89.3%

-3.6%

-9.3%

3

Over All

Train

punctuality

95%

86.9%

87.9%

-1.0%

-8.1%

FOIS and COIS:For up-to- date Railway transport monitoring for both freight and coaching train operations effectively, latest devices such as Freight Operations information system & Coaching operations information system were put into service with computer terminals.

 

1. RMS terminals – RMS terminals are located in the control office. Freight operations data is being fed round the clock.

 

2. TMS terminals – There are 10 fully operated TMS terminals where the work of all commercial formalities are being done. 1. Miryalaguda, 2. Vishnupuram, 3.Nalgonda,4.Donakonda,5.Narasaraopet,6.Nadikudi,7.Chityal 8. Reddipalem  9. ICL/VNUP and 10. Nandyal.

Non- device concept - Terminals where TMS systems are not provided. The commercial work is being connected to nearest terminal. 1. Pondugula, Macherla, Guruzala stations are connected to Nadikudi and 2. CONCOR operations are connected to Reddipalem.

3. EIMWB (Electronic in Motion Weigh Bridge)- There are totally 5 motion weigh bridges available in GNT Division, in which 2 i.e. NLPD & NDL are Railway owned and remaining 3 are private at ICLV/VNUP, MPJP & MDCJ at JNPD.

4. Control Office Application (COA):The Control charting of control boards i.e. Pagidipalli Board & Nandyal Board have been computerized and made operational since Jan’2008 as computerized charting is more effective for train controlling as well as forecasting. COA has been linked to FOIS & COIS application for better monitoring of Freight and Coaching Trains. Provision of updating COA application is provided at 8 stations i.e., GNT, MCLA, MRGA, MRK, NDKD, NDL, PGRL & RAL to ensure actual timings.

Cleanliness Activities on Guntur Division:-

Category

No.

STATIONS

REMARKS

A

01

GNT

Outsourcing handled by Medical department

B

02

NDL, NLDA

Outsourcing handled by Medical department. NLDA through station imprest.

D

13

MRGA, RAL, NDKD MAG,SAP,MCLA, PGRL,NRT, VKN, DKD,MRK, CBM, GID, NLDA

Now being done through imprest cash.

E

47

All other Stations

Cleanliness process is being carried out through imprest cash on day to day basis.

Total

63

Traffic facilities were completed since the formation of Guntur division:

  1. New crossing stations have been opened in 14 lengthy block stations-

Station

Date of Commission

Station

Date of Commission

1

.Perecherla

30/03/07

9

 Janphad

13/10/12

2

Munumaka

04/02/07

10

 Nandipalli

11.07.13

3

Jaggambhotla Krishnapuram

22/09/07

11

 Bommayapalli

09.10.13

4

.Sangamjagarlamudi

22/03/10

12

 Vemuru

11.03.16

5

Cheekateegalapalam

02/04/10

13

 Rayanagudem

13.07.16

6

Nudurupadu

27/09/10

14

 Kukkadam

08.02.17

7

Potlapadu

30/09/11

15

Nemalipuri

20.03.20

8

 Yadavalli

01/03/12

16

Rompicherla

20.03.20

ii.Commissioning of new sidings / PFTs:

a)A new Private siding owned by M/s Penna Cements Limited (MPJP) served by Janpahad Railway station on VNUP-JNPD section is opened                                        w.e.f. 02/08/2012.

b)A new Private siding owned by M/s Deccan Cements Limited (MDCJ) served by Janpahad Railway station on VNUP-JNPD section is opened                          w.e.f. 03/02/2017.

c)A new PFT  owned by M/s Lakshmi Narasimha Swamy (PLIN) Infra Pvt Ltd commissioned at Nagireddipalli Railway station on NDKD-PGDP section w.e.f. 08.05.2020

d)M/s Chettinadu Cements private siding at Tummalacheruvu work in progress.

e)TSGENCO Yadadri thermal power plant siding  is coming up at Vishnupuram Station.

f)M/S Balaji Ware housing corporation PFT is coming up at Thipparthi station.

Important through put enhancement works commissioned during 2018-19 and 2019-20:

a)Electrification of NLPD-NDL section.

b)Doubling of GNT-TEL section

c)Electrification of NLPD-NDL section.

d)Sanctioning of CC+8+2  to (a) NLPD-NDKD section and (b) PGDP - NDKD sections

e)Electrification of NDKD-MCLA section

f)Commissioning of new line between New Piduguralla – Savalyapuram as part of SKHT-NDKD new line project.

g)Electrification of NLPD-PGDP section

h)Doubling of PRCA-STUR section as part of GNT-GTL doubling project.

i)Premium Rake checking facility at NLPD.

j)Creation of shunting necks to major yards like NLPD, NDL & REP to increase operational fluidity.

NEW STREAMS LOADED SO FAR IN 2020-21:

a)Boiled Rice from Nagireddipalli (NRDP): 39 rakes with revenue of Rs.14.11 Cr. as on 30.09.2020.

b)Dry Chillies, Turmeric, Ginger & Cumin seeds from Reddipalem (REP):12 rakes with Rs.3.9 Cr as on 30.09.2020.

c)Parcel Cargo from Reddipalem (REP):  11 rakes with Rs.2.31Cr by running first International Time Tabled Parcel Cargo Express to Bangladesh. It was the first such initiative of IR.

Rambabu Vavilapalli

Sr.DOM/GNT







Source : South Central Railway CMS Team Last Reviewed on: 09-10-2020  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.