Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

Citizen Charter

Trains & Timings

Passenger Services / Freight Information

Public Information

Tenders

Contact Us

About Us
   Departments
      Electrical
         Traction Distribution


 
Bookmark Mail this page Print this page
QUICK LINKS
Traction Distribution

TRACTION DISTRIBUTION (as on 31.03.2023)


VISION

The vision of Traction Distribution is to provide safe, reliable and efficient operation of goods and passenger services.


ACTIVITIES:


Progress of Electrification on South Central Railway


Electrification on SCR started with the electrification of Vijayawada - Gudur section in 1980. By the end of March 2023, a total of 5,802 Route kilometers and 12,005 Track kilometers have been electrified, spreading over six divisions Secunderabad, Vijayawada, Guntakal, Guntur, Hyderabad and Nanded of SCR. Out of the total 6,471 (BG) Route kilometers of track on SCR, 5,802 Route kilometres i.e., 90% of the total track have been electrified & 2022-23, SCR electrified 1017 RKM which is second highest over Indian Railways. The prestigious Vande Bharat train work on electric traction. A 8 car Vande Bharat train has a power of approx. 4500 hp & A 16 car Vande Bharat train has a power of approx. 9000 hp.

  


Division wise Electrification

Division

SCR Total Route Km

Total Route Km Electrified (BG)

Total Track Km Electrified (BG)

Secunderabad

1557

1508

3529

Vijayawada

1065

1004

2791

Guntakal

1449

1436

3024

Guntur

678

678

1118

Hyderabad

737

572

840

Nanded

986

603

704

Total

6471

5802

12005


State wise Electrification

State

Route Km

BG RKM

MG RKM

Total RKM

Electrified

Non-Electrified

BG

BG

MG

Andhra Pradesh*

2930.229

63.998

0

2994.227

--

2994.227

Telangana*

1838.115

127.143

0

1965.258

--

1965.258

Maharashtra

737.938

304.817

59.940

1042.755

59.940

1102.695

Karnataka

288.669

98.50

0

387.169

--

387.169

Madhya Pradesh

0

0

70.18

--

70.18

70.18

Tamil Nadu

6.86

0

0

6.86

--

6.86

Total

5801.811

594.458

130.12

6396.269

130.120

6526.389

* 51.799 RKM added to Telanagana (Bhadrachalam-Bhavanapalem-Sattupalli section in SC divn) and 3.172 RKM added to Andhra Pradesh (GY Bypass line of GTL divn.) in Electrified BG RKM

Electrified sections over SC Railway
  • Vijayawada – Gudur
  • Vijayawada  - Visakhapatnam
  • Vijayawada – Bhimavaram Town-Nidadavollu
  • Gudivada – Machillipatnam
  • Bhimavaram Town-Narsapur
  • Samalkot – Kakinada
  • Obulavaripalli – Krishnapatnam  Port
  • Vijayawada - Kazipet – Ballarshah
  • Dornakal - Karepalli - Singareni collieries – Bhadrachalam - Manuguru
  • Peddapalli – Lingampalli Jagityal – Morthad-Nizamabad
  • Kazipet - Secunderabad - Hyderabad – Sanathnagar – Vikarabad – Wadi
  • Vikarabad – Parli Vaijnath
  • Manikgarh – Gadchandur
  • Motumarri – Jaggayapeta – Mellacheruvu – Janpahad - Vishnupuram
  • Gudur - Renigunta – Tirupati – Pakala – Katpadi
  • Renigunta – Gooty – Guntakal - Wadi
  • Gooty-Dharmavaram
  • Gooty – Pendekallu
  • Guntakal - Kalluru
  • Guntakal – Bellary
  • Dharmavaram – Pakala
  • Nandyal-Yerraguntla
  • Krishna Canal - Guntur – Nallapadu – Dhone - Guntakal
  • Guntur – Tenali - Repalle
  • Nallapadu – Nadikudi – Pagidipalli
  • Nadikudi – Macherla
  • Sanathnagar - Lingampalli                      Under Multi Modal Transport
  • Telapur – Ramchandrapura                    Under Multi Modal Transport
  • Ghatkesar – Moula Ali                            3rd & 4th line under Multi Modal Transport
  • Secunderabad –Umdanagar                   Under Multi Modal Transport
  • Secunderabad – Malkajgiri – Medchal     Under Multi Modal Transport
  • Medchal – Manorabad-Nizamabad-Basar
  • Jankampet-Bodhan
  • Umdanagar-Dhone
  • Gadwal – Raichur
  • Akola-Purna
  • Pimpalkutti-Mudkhed
  • Parli Vaijnath-Parbhani
  • Ankai-Aurangabad-Dinagaon

Electrification under progress over South Central Railway:

  • Dinagaon –Parbhani-Nanded-Mudkhed-Basar
  • Bidar-Gulbarga
  • Devarakadra-Krishna
  • Kadapa-Pendilimarri
  • Akkanapet-Medak
  • Manorabad-Gajwel
  • Akola-Akot
  • Kotapalli-Manoharabad
  • Kakinada-Kotipalli

 

System of working of Electric Traction Distribution

The Electric supply from the State Grid is availed at 220/132 KV, 2 Phase and is stepped down to 25 KV, Single Phase at the Traction sub-stations. This 25 KV single phase supply is fed to the over head conductor system consisting of a grooved contact wire suspended from catenary wire by flexible droppers. There is a continuous sliding contact between the pantograph pan of the locomotive and the bottom of the contact wire. The pantograph of the locomotive when raised applies a pressure of 7.0 Kg/Cm² against the contact wire which ensures the continuous and smooth collection of current from the Over Head Conductor to the locomotive. The 25 KV supply is further stepped down and rectified and fed to the Traction Motors. The return current flows through the loco wheels to the Rails and form the Rails to the earthed terminal of the traction transformer thus completing the single phase electric circuit. As the rails are earthed, it is ensured that the potential of the return current, is not increased above the earth potential. This ensures that there is no electric hazard to the public coming in contact with electrified tracks. The speed variation of the locomotive is achieved by varying the input voltage to the traction motors.


Technological Improvements

  • In the newly electrified sections, 21.6/30.24 MVA Power Transformers have been provided at Traction Sub-stations (TSS). The capacity of these transformers can be increased from 21.6 MVA to 30.24 MVA by switching on forced air circulation fans.

  • The switch gear at the TSSs is of state-of-art SF-6/ Vaccum type. These switch gears require less maintenance as compared to oil switch gears, which were used earlier.

  • Provision of improved version of distance protection relays at TSSs to avoid    spurious circuit breaker trippings and consequent interruptions to OHE power supply.

  • Provision of PTFE type short neutral sections in OHE to avoid stalling of Goods trains in gradient section.

  • Contactless Thermovision camera is used for identifying hot spots pertaining to connectors of the OHE jumpers, Busbars etc., of the TSSs/ Switching stations and to plan attention prior to failure.

  • Provision of long creepage Insulators for the OHE situated in polluted zone to avoid flash over and consequent failure of insulators.

  • Provision of Hybrid Insulators where OHE is prone for stone pelting activity by miscreants/cow-boys.

  • Provision of High speed Auto re-closures to all feeder circuit breakers to minimize power supply interruption to OHE.

  • Provision of Numerical relays in place of electromagnetic type relays.

  • 2 x 25 KV AT system is proposed in Ballarshah – Vijayawada-Gudur &  Vijayawada-Duvada sections to run 160 kmph trains & to meet Mission 3000 MT target by 2030


Special Features of SCADA

  • PC based computer remote control system with the following special features have been installed at Secunderabad, Vijayawada, Guntakal, Guntur and Hyderabad,
  • All operations of Circuit Breakers, Interruptors etc., situated in the Sub-stations and Switching Stations over the length of Railway line can be remotely operated from the Divisional Control Office by simple commands through key board/mouse

  • The status of different equipment and values of voltages and currents are continuously monitored and displayed on the video monitors attached to the operator workstations.

  • Automatic fault isolation is done by SCADA system in case of faults on OHE

  • All the operations of the TPC and events are automatically logged in the system


Safety

All the traction masts and structures are earthed properly so as to negate any possibility of electric shock due to any leakage of power. Sufficient clearances are maintained with earthed structures. A working clearance of two meters is maintained from the live OHE. All FOB’s & COP’s are earthed to rail & to earth electrode. Protective screens on FOB’s/ROB’s are provided.


Some of the Safety Tips to be followed by "PUBLIC" to safely travel in Electrified section are given below: