S. No. | Letter No. | Subject | Issuing Authority | Date | Link |
1 | W.71/BR/Bridge Policy/ Vol.II | Open foundations -keying into Rock and Provision of steel rock anchorages | CBE | 22-12-2021 | Click Here |
2 | W.148/P/SNW/ 2018 | Guidelines on Similar Nature Works-reg | Dy.CE/ Works | 13-12-2021 | Click Here |
3 | W.71/Floods/policy matters/Circulars | Construction of new Bridge during doubling-Reg | CE/WS&F | 13-12-2021 | Click Here |
4 | | Points noted during CBE’s Conference held at IRICEN/Pune on 2nd & 3rd Dec – 2021. | CBE | 02-12-2021 | Click Here |
5 | W.71/BR/Bridge Policy/Vol.II | Provision of 5.15m deck width in ballasted bridges-Regarding | CBE | 08-10-2021 | Click Here |
6 | W.71/BR/Bridge Policy/Vol.II | Construction and maintenance of Cover Over Platforms and FOBs-reg | CBE | 28-09-2021 | Click Here |
7 | W.287/LC/Policy/VIII | Construction of RUB/Subways-SAG level certification for Drainage-reg | PCE | 02-09-2021 | Click Here |
8 | W.71/BR/Bridge Policy/Vol.II | Arrangement of traction mast on abutment of bridges | CBE | 20-08-2021 | Click Here |
9 | W.71/BR/Bridge Policy/Vol.II | Guntur Division-GNT-GTL section - Donakonda-Nandyal Sub section-Doubling Project-Replacing of existing Stone Top Culverts with RCC Box between Gajjelakonda -Diguvametta stations -Regarding | CBE | 09-08-2021 | Click Here |
10 | W.71/Br.L/Genl | Attention to RUB/Bridge Rebuilding locations-Reg | CBE | 07-06-2021 | Click Here |
11 | W.71/BR/Bridge Policy | Repairs to Spalling in RCC slabs-Reg | CBE | 02-06-2021 | Click Here |
12 | W.71/Br.L/Genl/Correspondence/Vol.II | Bridge Inspection -Bridge under ORN 2 & 3 category-Reg | CBE | 03-05-2021 | Click Here |
13 | W.71/BR/Bridge Policy | Execution of RUB/Bridge works with BOX Pushing method- Use of Rail Clusters for safety -Reg | CBE | 16-03-2021 | Click Here |
14 | W.71/BR/Bridge Policy | Improvement in preparation of bridge drawings-reg | Dy.CE/Br.D | 02-03-2021 | Click Here |
15 | W.71/BR/Bridge Policy | Minimum Clear Span & Minimum headroom for new Railway Bridges | CBE | 16-02-2021 | Click Here |
16 | W.506/ESOs | Preparation of GADs and Completion Drawings of Bridges | PCE | 08-02-2021 | Click Here |
17 | W.71/BR/Bridge Policy | Execution of RUB/Bridge works by BOX Pushing method -Reg | CBE | 01-02-2021 | Click Here |
18 | W.71/BR/Bridge Policy | Execution of RUB/Bridge works with Box Segmental/Pushing method -Reg | CBE | 04-12-2020 | Click Here |
19 | W.506/ESOs | Protection and safety measures at Bridge Works sites | PCE | 29-07-2020 | Click Here |
20 | W.287/RUB-Drainage | Drainage problems at RUBs | CE/RSW | 07-10-2020 | Click Here |
21 | W.506/ESOs | Bridge Planning and Construction -Policy | PCE | 21-05-2020 | Click Here |
22 | W.71/BR/Bridge Policy | Improper Construction of retaining walls at RUB approaches-Reg | CBE | 30-10-2019 | Click Here |
23 | W.71/BR/Bridge Policy | Approval of Bridge General Arrangement Drawings | CBE | 25-10-2019 | Click Here |
24 | W.71/BR/Bridge Policy | Exposure condition consideration as per A&C Slip no.06 of IRS concrete Bridge Code (RePrint-2014)- Reg | AXEN/Br.D | 23-09-2019 | Click Here |
25 | W.71/BR/Bridge Policy | Simplification of procedure for Approval of Engineering Drawings | AXEN/Br.D | 29-08-2019 | Click Here |
26 | W.71/BR/Bridge Policy | Exposure condition consideration as per A&C slip no.06 of IRS Concrete Bridge Code (Reprint-2014) | Dy.CE/Br.D | 31-12-2018 | Click Here |
27 | W.71/Bridge Policy | Elimination of existing STC bridges -Doubling Projects -Reg | CBE | 14-12-2017 | Click Here |
28 | W.71/Bridge Policy | OHE mast fixing arrangement on the existing bridge piers and incorporating the details in bridge completion drawings-reg | CBE | 08-12-2017 | Click Here |
29 | W.71.Br.Policy | Verification of Railway Electrification works being executed in your division | CBE | 06-11-2017 | Click Here |
30 | W.71/Bridge Policy | OHE mast fixing arrangement on the existing bridge piers and incorporating the details in bridge completion drawings-reg | CBE | 12-09-2017 | Click Here |
31 | W.71/Bridge Policy | Use of Bearings for Long Span Bridge Girders | CBE | 31-08-2017 | Click Here |
32 | W.71/BR/Bridge Policy | Providing of Cross slopes for new track on doubling projects | PCE | 03-07-2017 | Click Here |
33 | W.71/Br.Policy | OHE Mast for Electrification on Exg Pier/Abutment-Approval of GADs -BP copies of Approved GADs | CBE | 17-05-2017 | Click Here |
34 | W.71/Br.Policy | Sanction for Minor works | PCE | 16-05-2017 | Click Here |
35 | W.71/Br.Policy | Procedure for preparation of drawings, request for alterations for the approved drawings with respect to Bridge, Buildings, Yards and Other General works | CBE | 16-05-2017 | Click Here |
36 | W.352/Br/Policy/Vol.VII | Non completion and Improper execution of flooring work at bridges provided with shallow foundations | CBE | 06-03-2017 | Click Here |
37 | W.71/BR/RVNL/MMTS Ph-II/Pilot (br.221) | SC Division; MMTS Phase-II -SC-KZJ section Br.No. 291, at Ch;213427.35m exg. 7x6.10m PSC slab between GHZ-GT stations, Quadrupling of track between MLY-GT-Approval of PT Drawing of GAD | Dy.CE/ Br.D | 28-02-2017 | Click Here |
38 | Minutes of meeting | Minutes of meeting held with RVNL Officials on 09-02-2017 in Chief Bridge Engineer’s Chamber | CBE | 09-02-2017 | Click Here |
39 | W.351/Bldgs/FOBs/PFs/Policy(W-II) | Subways/FOBs-Provision of Subways and adoption of Standard spans and Provision of Ramps | CE/P&D | 16-01-2017 | Click Here |
40 | W.352/Br/Policy/Subways | Typical plan of LHS with protection measures to avoid flooding of RUBs | PCE | 21-10-2016 | Click Here |
41 | W.71/BR/Bridge Policy | Inspection and Maintenance of Arch Bridges | PCE | 25-07-2016 | Click Here |
42 | W.71/BR/Bridge/ Policy | Construction and Maintenance of Cover Over Platforms and FOBs | CBE | 25-04-2016 | Click Here |
43 | W.71/BR/Bridge/ Policy | Bridge proposal with lowering of Bed Level | CBE | 09-03-2016 | Click Here |
44 | W.71/BR/Bridge Policy | Raising of girders in flood affected areas in GTL division, precautions in fixing of Danger Level etc | PCE | 18-02-2016 | Click Here |
45 | W.71/Floods/Policy | Bridge proposals with lowering of bed level | CBE | 12-01-2016 | Click Here |
46 | W.71/BR/Bridge Policy | Bridge with Well/Pile foundations -Fixing of safe scour depth | CBE | 05-01-2016 | Click Here |
47 | W.71/Floods/Policy | Marking of scour depth on the pier/well cap | CE/WS&F) | 22-12-2015 | Click Here |
48 | W.71/BR/Bridge Policy | Provision of flood protection works | PCE | 10-12-2015 | Click Here |
49 | W.71/BR/Bridge Policy | Provision of cross drainage during doubling/tripling and flood protection | PCE | 27-11-2015 | Click Here |
50 | W.71/BR/Bridge -Policy | Erection of RE Masts on existing Railway Bridges | CBE | 13-07-2015 | Click Here |
51 | W.CON.496/PL/C/T&C/XIX/Vol.X | Instructions given by PCE/SC during meeting with Construction Officers on 06-05-2015 | Dy.CE/C/G-1/SC | 28-05-2015 | Click Here |
52 | 572/Yards/Genl | Rail level(RL) of track in yard portion | CE/P&D | 13-05-2015 | Click Here |
53 | W.71/BR/Bridge Policy | Grouting of pitching of slopes of embankment | CBE | 18-03-2015 | Click Here |
54 | W.71/BR/RVNL/MMTS Ph-II | Approval of Design/Proof Checking consultant | CBE | 14-11-2013 | Click Here |
55 | W.71/Br/P/9/Vol.VII | Approval of GADs for Bridges of New lines, doublings and Gauge conversion | CBE | 04-03-2013 | Click Here |
56 | W.71/Br/P/9/Vol.VII | Permeability Test for the Concrete bridges | CBE | 27-02-2013 | Click Here |
57 | W.71/Br/P/9/Vol.VII | Closure of Level crossings by diverting road traffic through a Railway waterway bridge | CBE | 25-02-2013 | Click Here |
58 | W.PCE/Genl/2013 | Preparation of Drawings reflecting Railway boundary care to be taken | PCE | 08-02-2013 | Click Here |
59 | W.71/BR/Policy/Circular | Policy guidelines for provision of escalators | Dy.CE/Br.D | 04-12-2012 | Click Here |
60 | W.71/BR/Bridge Policy | Improvement in preparation of bridge drawings | CBE | 05-09-2011 | Click Here |
61 | W.351/FOB/PF's Policy | Joint Commercial and Engineering Procedural Order No.6 of 2011 | Dy.CE/P&D | 16-06-2011 | Click Here |
62 | W.71/BR/Bridge Policy | Use of PSC slabs for smaller spans | CBE | 18-03-2011 | Click Here |
63 | D.O.Lr.No.W.331/A/1/Drg | Procedure of preparation of drawings for executing Civil Engineering Works with respect to level crossings | PCE | 24-07-2003 | Click Here |