Salient features:
1. | Total Area of Workshop | 21.83 hectares/53.95 Acres |
2. | Covered Area | 9.82 hectares/ 24.27 Acres (45%) |
3. | Rail track length | 8.25 Kms. |
4. | Machinery & Plants | 509 nos. |
5. | Railway Quarters | 584 nos. |
6. | WMS Budget 2023-24 (Workshop Manufacturing Suspension) | Figs. In Crores | Mechanical | Electrical | Total |
Net Debits | 321.71 | 84.18 | 405.89 |
Net Credits | 319.55 | 85.02 | 404.57 |
7. | Targets 2023-24 | Periodic Overhauling (POH) of Coaches | IntermediateOverhauling (IOH) of bogies |
1622 Nos. | ICF | LHB |
1024 | 421 |
8. | Average Monthly Power consumption in KWH | Grid | 201730 |
Solar | 68017 |
9. | Manpower as on 01.04.2023. (Mech. + Elec.) | Department | Sanctioned | Actual | Vacancies |
Mechanical | 2519 | 2090 | 429 |
Electrical | 627 | 459 | 168 |
Total | 3416 | 2549 | 597 |
| | | | | | | |
Present activities of the Workshop:
· Periodic Overhauling (POH) of Air Conditioned & Non Air Conditioned Broad Gauge ICF/LHB Designed coaches.
· Intermediate Overhauling (IOH) of ICF Designed Conventional and LHB designed FIAT Bogies.
· POH of DEMU,EMU/MEMU Power & Trailer cars & SPART coaches
· POH of Tower cars(4W & 8W)
· POH of Defence owned and camping coaches
· Supply of Wheel sets, Distributor Valves (DVs) & Bogie Mounted Brake Cylinders (BMBCs) to divisions.
· LOFP/SC: Assembly and Supply of Lube oil & Fuel oil filters of Diesel Locomotive to all over Indian Railway.
· RBK/Yadgir: Manufacturing of LHB Bogie frames.