Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

Citizen Charter

Trains & Timings

Passenger Services / Freight Information

Public Information

Tenders

Contact Us

About Us
   Departments
      Electrical
         Traction Distribution


 
Bookmark Mail this page Print this page
QUICK LINKS
Traction Distribution





TRACTION DISTRIBUTION (as on 31.10.2022)


  • VISION

    The vision of Traction Distribution is to provide safe, reliable and efficient operation of goods and passenger services.

  • ABOUT US


Electrification on SCR started with the electrification of Vijayawada - Gudur section in 1980. By the end of October 2022, a total of 5,094 Route kilometers and 10,877 Track kilometers have been electrified, spreading over six divisions viz Secunderabad, Hyderabad, Vijayawada, Guntakal, Guntur, Hyderabad and Nanded of SCR. Out of the total 6,471 (BG) Route kilometers of track on SCR, 5,094 Route kilometres i.e., 79% of the total track have been electrified.

  


  • Division wise Electrification (as on 31.10.2022)

Division

SCR Total Route Km (BG)

Total Route Km Electrified (BG)

Total Track Km Electrified (BG)

Secunderabad

1557

1444

3340

Vijayawada

1065

1004

2683

Guntakal

1449

1433

2972

Guntur

678

632

1022

Hyderabad

737

373

612

Nanded

986

208

248

Total

6471

5094

10877

 

  • Electrified sections over SC Railway

  • Vijayawada – Gudur

  • Vijayawada- Visakhapatnam

  • Vijayawada – Bhimavaram Town-Nidadavolu

  • Gudivada – Machillipatnam

  • Bhimavaram Town-Narsapur

  • Samalkot Kakinada Port

  • Vijayawada - Kazipet – Ballarshah

  • Dornakal - Karepalli - Singareni collieries – Bhadrachalam Road – Manuguru

  • Bhadrachalam Road-Sattupalli

  • Peddapalli – Lingampalli Jagityal – Morthad-Nizamabad

  • Kazipet - Secunderabad - Hyderabad – Sanathnagar – Vikarabad – Wadi

  • Vikarabad – Kohir-Latur Road

  • Manikgarh – Gadchandur

  • Motumarri – Jaggayapeta – Mellacheruvu – Janpahad – Vishnupuram

  • Gudur - Renigunta – Tirupati – Pakala – Katpadi

  • Renigunta – Gooty – Guntakal – Wadi

  • Gooty-Dharmavaram

  • Gooty – Pendekallu

  • Guntakal – Kalluru

  • Guntakal – Bellary

  • Dharmavaram – Pakala

  • Krishna Canal - Guntur – Nallapadu – Dhone – Guntakal

  • Guntur – Tenali – Repalle

  • Nallapadu – Nadikudi – Pagidipalli

  • Nadikudi – Macherla

  • Obulavaripalli – Krishnapatnam Port

  • Sanathnagar - Lingampalli  Under Multi Modal Transport

  • Telapur – Ramchandrapura Under Multi Modal Transport

  • Ghatkesar – Moula Ali 3rd & 4th line under Multi Modal Transport

  • Secunderabad – Falaknuma - Umdanagar Under Multi Modal Transport

  • Umdanagar-Mahbubnagar

  • Secunderabad – Malkajgiri – Medchal Under Multi Modal Transport

  • Medchal – Manorabad-Kamareddi

  • Nandyal – Yerraguntla

  • Gadwal – Raichur

  • Janakampet-Nizamabad (incl. Jankampet – Bodhan)

  • Akola-Lohagad-Washim-Hingoli Deccan

  • Ankai-Rotegaon

  • Pimpalkutti-Kosai

  • Electrification under progress over SC Railway

  • MMTS Phase – II (Moula Ali – Sanathnagar)

  • Purna – Hingoli Deccan

  • Rotegaon- Mudkhed – Janakampet

  • Nizamabad-Kamareddi

  • Mahbubnagar – Kurnool Town

  • Kosai- Mudkhed

  • Parbhani – Parli Vaijnath

  • Latur Road – Parli Vaijnath

  • Devarkadra-Krishna

  • New Piduguralla-Savalyapuram

  • Khanapur-Kalaburga

  • Akot-Amalakhurd

  • Amalakhurd-Khandwa

 

  • System of working of Electric Traction Distribution

The Electric supply from the State Grid is availed at 220/132 KV, 2 Phase and is stepped down to 25 KV, Single Phase at the Traction sub-stations. This 25 KV single phase supply is fed to the over head conductor system consisting of a grooved contact wire suspended from catenary wire by flexible droppers. There is a continuous sliding contact between the pantograph pan of the locomotive and the bottom of the contact wire. The pantograph of the locomotive when raised applies a pressure of 7.0 Kg/Cm² against the contact wire which ensures the continuous and smooth collection of current from the Over Head Conductor to the locomotive. The 25 KV supply is further stepped down and rectified and fed to the Traction Motors. The return current flows through the loco wheels to the Rails and form the Rails to the earthed terminal of the traction transformer thus completing the single phase electric circuit. As the rails are earthed, it is ensured that the potential of the return current, is not increased above the earth potential. This ensures that there is no electric hazard to the public coming in contact with electrified tracks. The speed variation of the locomotive is achieved by varying the input voltage to the traction motors.

  • Technological Improvements

  • In the newly electrified sections, 21.6/30.24 MVA Power Transformers have been provided at Traction Sub-stations (TSS). The capacity of these transformers can be increased from 21.6 MVA to 30.24 MVA by switching on forced air circulation fans.

  • The switch gear at the TSSs is of state-of-art SF-6/ Vaccum type. These switch gears require less maintenance as compared to oil switch gears, which were used earlier.

  • Provision of improved version of distance protection relays at TSSs to avoid spurious circuit breaker trippings and consequent interruptions to OHE power supply.

  • Provision of PTFE type short neutral sections in OHE to avoid stalling of Goods trains in gradient section.

  • The manually operated isolators at major yards have been motorized to facilitate quick isolation of faulty section of OHE and to reduce the detention to trains to main lines during breakdowns/ unusual occurrences.

  • Contactless Remote Sensing Device is used for identifying hot spots pertaining to connectors of the OHE jumpers, Busbars etc., of the TSSs/ Switching stations and to plan attention prior to failure.

  • Provision of long creepage Insulators for the OHE situated in polluted zone to avoid flash over and consequent failure of insulators.

  • Provision of Hybrid Insulators where OHE is prone for stone pelting activity by miscreants/cow-boys.

  • Provision of High speed Auto reclosures to all feeder circuit breakers to minimize power supply interruption to OHE.

  • Provision of Numerical relays in place of electromagnetic type relays.

  • Special Features of SCADA

  • PC based computer remote control system with the following special features have been installed at Secunderabad, Vijayawada, Guntakal, Guntur and Hyderabad,

  • All operations of Circuit Breakers, Interruptors etc., situated in the Sub-stations and Switching Stations over the length of Railway line can be remotely operated from the Divisional Control Office by simple commands through key board/mouse

  • The status of different equipment and values of voltages and currents are continuously monitored and displayed on the video monitors attached to the operator workstations.

  • Automatic fault isolation is done by SCADA system in case of faults on OHE

  • All the operations of the TPC and events are automatically logged in the system

  • Safety

  • All the traction masts and structures are earthed properly so as to negate any possibility of electric shock due to any leakage of power. Sufficient clearances are maintained with earthed structures. A working clearance of two meters is maintained from the live OHE.

  • Some of the Safety Tips to be followed by "PUBLIC" to safely travel in Electrified section are here under

  • Do not carry vertically long poles/ any other articles in the vicinity of overhead live conductors.

  • Do not touch/ walk on Rails.

  • Do not travel on roof of coaches and wagons, as overhead live conductors are fatal.

  • Tress-passing in electrified station yards is strictly prohibited for your own safety.

  • Do not project any metallic parts from Foot over bridge / Road over bridge towards live wires and conductors.

  • Do not pour water from Road over bridges/ Foot over bridges on the overhead wires and conductors.

  • Do not lean out from compartment while train is in motion.

  • Do not travel on top of Road vehicles passing through Level Crossing Gates.

  • Do not try to pass through Level Crossing Gates with consignments higher than the height gauge level.

  • Do not forget that Overhead Traction wires are always live and dangerous





Source : South Central Railway CMS Team Last Reviewed : 28-11-2022  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.