1 | 2017/CE-IV/RUB/88 | Prevention of water logging at subways/RUBs | 09-09-2022 | Click Here |
2 | 2017/CE-IV/RUB/88 | Construction of Subways - Ensuring Quality, Drainage, Height of Shed etc., | 27-01-2022 | Click Here |
3 | 2015/CE-III/BR/Sub structure code | Construction of RCC Boxes for RailwayBridges | 19-01-2022 | Click Here |
4 | 2021/ED(ProjM)/Misc/Committee | Construction of new bridges during doubling | 12-11-2021 | Click Here |
5 | 2015/CE-III/BR/Sub structure code | Construction of RCC Boxes for Railway Bridges | 03-11-2021 | Click Here |
6 | 2021/2/CE-III/BR/1/Bridge Policy | Approval of bridge designs for works being executed by RVNL | 28-10-2021 | Click Here |
7 | 2021/2/CE-III/BR/1/Bridge Policy | Approval of GADs and Design of bridges being constructed by PSUs | 19-07-2021 | Click Here |
8 | 2021/2/CE-III/BR/1/Bridge Policy | Approval of Bridge Drawings/ Designs for Bridge Works Being Executed by Railway and Other PSUs/Organizations. | 17-05-2021 | Click Here |
9 | 2018/14/CE-III/BR/Instrumentation | Instrumentation of Railway Bridges | 13.05.2021 | Click Here |
10 | 2016/52/CE-III/BR/Safety | Execution of Bridge, ROB, RUB, FOB & Rail Flyover works affecting running lines | 12-03-2021 | Click Here |
11 | 2017/CE-IV/RUB/88 | Water logging and drainage problem in RUB/Subways | 18-02-2021 | Click Here |
12 | 2016/54/CE-III/BR/RDSO/Misc | Design of Non-Standard composite Girders for ROBs | 12-02-2021 | Click Here |
13 | 2019/9/CE-III/BR/RDSO Misc | Guidelines for Load Testing of Bridges | 27-01-2021 | Click Here |
14 | 2016/54/CE-III/BR/RDSO/Misc | Design of Non-Standard composite Girders for ROBs | 21-09-2020 | Click Here |
15 | 2015/CE-III/BR/Sub structure code | Construction of RCC Boxes for Railway Bridges | 11-03-2020 | Click Here |
16 | No.2014/CE-III/BR/Bridge Policy | Design Basis Report (DBR) and Technical Advisory Group (TAG) for new important bridges | 12-02-2020 | Click Here |
17 | No.2016/39/CE-III/BR/Improvement Measures | Implementation of modern technologies for inspection / monitoring of bridges | 07-02-2020 | Click Here |
18 | 2015/CE_IV/ROB/78 Pt | Design procedure for non standard spans in construction of ROBs on Indian Railway | 15-01-2020 | Click Here |
19 | No.2017/CE-I/CT/13/Procedure Simplification | Advance Correction Slip No.38 to Indian Railways Bridge Manual | 14-01-2020 | Click Here |
20 | No.2019/4/CE-III/BR/TELS | Use of TELS on the bridge in HHP Diesel & Electric locomotives | 07-01-2020 | Click Here |
21 | No.2018/14/CE-III/BR/Instrumentation | Guidelines for instrumentation of Bridges | 03-01-2020 | Click Here |
22 | No.2016/39/CE-III/BR/Improvement Measures | 3D Scanning of riverbed | 26-12-2019 | Click Here |
23 | No.2013/CE-III/BR/IRBM | Inspection of Railway bridges/ROBs before commissioning | 17-12-2019 | Click Here |
24 | No.2017/50/CE-III/BR/FOB | Inspection of Foot Over Bridges (FOBs) | 05-12-2019 | Click Here |
25 | No.2009/CE-I/BR-III/3/BMS | Bridge Management System (BMS) on IR | 19-11-2019 | Click Here |
26 | No.2014/CE-III/BR/Bridge Policy | Approval of design basis of Important bridges by RDSO | 11-11-2019 | Click Here |
27 | No.2017/50/CE-III/BR/FOB | Stainless Steel for Structural Application | 04-11-2019 | Click Here |
28 | No.2017/56/CE-III/BR/Mega Bridge | Use of Drone mounted cameras for inspection of Bridges | 25-10-2019 | Click Here |
29 | No.2018/37/CE-III/BR/Third Party Audit | 3rd Party Audit of Railway Bridges/ROBs/FOBs-Provision of Boards | 03-09-2019 | Click Here |
30 | No.2018/37/CE-III/BR/Third Party Audit | Safety Audit | 18-09-2019 | Click Here |
31 | No.2018/22/CE_III/BR/Sidings | Approval of GADs/detailed drawings of bridges for Private sidings | 21-08-2019 | Click Here |
32 | No.2017/16/CE-III/BR/Girder Inspection | Inspection of new Steel Bridge Girders | 24-07-2019 | Click Here |
33 | No.2016/54/CE-III/BR/RDSO/Misc. | Fabrication, Supply and Inspection of Steel Girders for ROBs | 15-07-2019 | Click Here |
34 | No.2014/CE-III/BR/Bridge Policy | Bridges - Inspection and maintenance | 27-06-2019 | Click Here |
35 | No.TCR/1394/2019/1 | Permissible Carrying Capacity (PCC) of wagons | 16-05-2019 | Click Here |
36 | No.2016/54/CE-III/BR/RDSO/Misc. | Supply of Steel Girders | 09-05-2019 | Click Here |
37 | No.2014/CE-III/BR/Bridge Policy | Bridges-Inspection and Maintenance | 10-04-2019 | Click Here |
38 | No.2018/37/CE-III/BR/Third Party Audit | 3rd Party Audit of RailwayBridges/ROBs/FOBs-Provision of Boards | 08-04-2019 | Click Here |
39 | No.2018/06/CE-III/BR/Stainless Steel | Use of Stainless steel reinforcement in various structure | 04-04-2019 | Click Here |
40 | No.2016/39/CE-III/BR/Improvement Measures | Implementation of New Technologies-Bridges | 28-03-2019 | Click Here |
41 | No.2016/39/CE-III/BR/Improvement Measures | Implementation of New Technologies-Bridges | 13-02-2019 | Click Here |
42 | No.2016/49/CE-III/BR/Accident | Use ofstandard service girders | 20-12-2018 | Click Here |
43 | No.2017/50/CE-III/BR/FOB | Fabrication of Road Over Bridge (ROB) girder for Railway span and Foot Over Bridge (FOB) girders | 18-12-2018 | Click Here |
44 | No.2016/39/CE-III/BR/Improvement Measures | Use of Modern Technologies in Bridge Inspection | 26-10-2018 | Click Here |
45 | No.2015/CE-III/BR/Substructure Code | Construction of RCC Boxes for the Railway Bridges | 18-09-2018 | Click Here |
46 | No.2009/CE-I/BR-III/3/BMS | Bridge Management System (BMS) on IR | 03-08-2018 | Click Here |
47 | 2017/07/CE-III/BR/Safety | Third party Audit of Railway Bridges/ROBs/FOBs | 03-08-2018 | Click Here |
48 | ACS No.07 of I.R. Concrete bridge code | ACS No.07 of I.R. Concrete bridge code | 26-06-2018 | Click Here |
49 | 2018/29/CE-III/BR/RFOs | Track Structure on Rail Flyovers (RFO) | 30-05-2018 | Click Here |
50 | 2018/22/CE_III/BR/Sidings | Approval of GADs/Detailed drawings of Bridges for Private Sidings | 09-05-2018 | Click Here |
51 | 2018/06/CE-III/BR/Stainless steel | Use of Stainless steel reinforcement in various structures | 02-05-2018 | Click Here |
52 | 2017/48/CE-III/BR/DFC feeder Routes | Advance Correction Slip of No.36 to Indian Railways Bridge Manual | 27-03-2018 | Click Here |
53 | 2017/53/CE-III/BR/Side Pathway | Provision of Side Pathways on Girder Bridges | 27-11-2017 | Click Here |
54 | 98/W-1/Genl/0/30-Pt.1 | Construction of 3rd and 4th Line | 24-11-2017 | Click Here |
55 | 2017/CE-I/CT/13/Procedure Simplification | Approval of Engineering Drawings | 20-10-2017 | Click Here |
56 | 2017/29/CE-III/BR/Br.588/ECoR | Construction of bridges during doubling | 03-08-2017 | Click Here |
57 | 98/W-1/Genl/0/30/Pt.1 | Construction of 3rd line & 4th line to DFC standard | 01-08-2017 | Click Here |
58 | 2014/CE-III/BR/Bridge Policy | Use of Spherical Bearings for long span bridge girders | 31-07-2017 | Click Here |
59 | 2015/CE-III/BR/Sub structure code | Advance Correction Slip of No.35 to Indian Railways Bridge Manual | 31-07-2017 | Click Here |
60 | 2016/4/CE-III/BR/BSC/84/Seminar | Use of Stainless steel reinforcement in construction of bridges | 28-07-2017 | Click Here |
61 | 2017/10/CE-III/BR/PSC slab | Replacement of Steel girders up to 9.15m by PSC Slabs | 20-06-2017 | Click Here |
62 | 2015/CE_III/BR/Sub structure code | Retention of existing Free Board | 26-05-2017 | Click Here |
63 | 2015/CE-III/BR/Sub structure code | Guidelines on centre to centre distance of foundations of existing and new bridge | 26-05-2017 | Click Here |
64 | 2015/CE-III/BR/25 Tonne | Assessment of the existing bridges as per 25 Tonnes-2008 loading standard (as per Bridge Rules) | 21-12-2016 | Click Here |
65 | 2014/CE-III/BR/Bridge Policy | Type of Foundation for Railway Bridges | 15-11-2016 | Click Here |
66 | 2013/TK-II/22/19/1 Pt | Regular adoption of composite sleepers on INdian Railways | 23-09-2016 | Click Here |
67 | 2014/LML-1/24/3 | CRS Sanction for Piper track crossings, clarification-reg | 09-09-2016 | Click Here |
68 | 2014/CE-III/BR/Bridge workshop Policy | Fabrication of Bridge Girders & FOBs through Bridge Workshops | 08-06-2016 | Click Here |
69 | 2016/23/CE-III/BR/ Monsoon | Stability of Cuttings | 06-06-2016 | Click Here |
70 | 2014/CE-III/BR/ Bridge Policy | Guidelines for rehabilitation/rebuilding of Bridges | 04-12-2015 | Click Here |
71 | 2015/CE-III/BR/RDSO/Misc. | Protection Arrangements for RCC Box culverts & RUB/LHS | 01-12-2015 | Click Here |
72 | 2015/CE-III/BR/ River protection work | Status & Maintenance of Guide bunds of Railway bridges | 16-11-2015 | Click Here |
73 | 2012/CE-III/BR/ Rly. Federation | Provision of man refuges on girder bridges | 29-10-2015 | Click Here |
74 | 2015/CE-III/BR/ Misc. Issues | Provision / availability of Binoculars for Bridge Inspection | 13-10-2015 | Click Here |
75 | 2009/CE-I/BR/-III/3/ BMS | Feeding of Bridge Management (Master Data) | 21-09-2015 | Click Here |
76 | 2011/CE-II/Form/Misc | Track center for 3rd line track - feasibility of BCM/FM working | 11-09-2015 | Click Here |
77 | 2014/CE-III/BR/ Bridge Policy | Measurement of longitudinal movement of bridge bearings | 09-09-2015 | Click Here |
78 | 2014/CE-III/BR/ Bridge Policy | Use of High Strength Friction Grip (HSFG) bolts on Indian Railways | 31-08-2015 | Click Here |
79 | 2015/CE-III/BR/ Water Level Gauge | Installation of Water level monitoring system at Railway Bridges | 02-07-2015 | Click Here |
80 | 2014/CE-III/BR/ Bridge Policy | Availability of relieving girders in adequate nos. | 25-06-2015 | Click Here |
81 | 2014/CE-III/BR/ Bridge Policy | Construction of Road Under Bridge (RUBs) | 29-05-2015 | Click Here |
82 | 2013/CE-III/BR/ IRBM | Approval of General Arrangement Drawing (GAD) of major bridges on DFCCIL alignment | 12-05-2015 | Click Here |
83 | 2014/CE-III/BR/ Bridge Policy | Span arrangement of Railway Bridges | 21-04-2015 | Click Here |
84 | 2014/CE-III/BR/ Bridge Policy. | Inspection of POT-PTFE bearings | 19-02-2015 | Click Here |
85 | 2014/CE-III/BR/ Bridge Policy | Calculation of water ways, foundation design etc. | 04-02-2015 | Click Here |
86 | 98/W-1/Genl./0/30-Pt--1 | Corrective action to increase the formation width | 13-01-2015 | Click Here |
87 | 2014/CE_III/BR/Bridge Policy | Guidelines for repair rehabilitation/rebuilding of bridges | 25-11-2014 | Click Here |
88 | 2014/CE-III/BR/ Speed Restriction | Time bound action plan for reducing temporary as well as permanent speed restrictions on bridges | 22-09-2014 | Click Here |
89 | 2014/CE-III/BR/ Bridge Policy | Providing necessary inspection arrangements for new bridges | 09-10-2014 | Click Here |
90 | 2013/CE-III/BR/ RDSO/Misc | Adoption of Open foundation for railway bridges | 15-09-2014 | Click Here |
91 | 2013/CE-III/BR/ RDSO/Misc | Use ofStandard drawings on railway system | 11-08-2014 | Click Here |
92 | 2014/CE-III/BR/ WP 2015-16 | Proper framing of Works Programme proposal under PH-32 Bridge works | 23-07-2014 | Click Here |
93 | 2013/CE-III/BR/ RDSO/Misc | Planning of new important bridges | 04-06-2014 | Click Here |
94 | ACS No.135 of IRPWM | Advance Correction Slip No.135 to the Indian Railways Permanent Way Manual | 07-05-2014 | Click Here |
95 | 2014/CE-III/BR/ Bridge Workshops Policy | Nomination of Bridge Workshops-Secondary source | 24-02-2014 | Click Here |
96 | 2005/WI/RVNL/5 | Increase in minimum head room of minor bridges -correction slip No.25 of IRBM | 30-07-2013 | Click Here |
97 | 2004/BC/AP/3.3/2002-03 | Loss due to defective Investigation of soil | 17-06-2013 | Click Here |
98 | 99/CE-I/Misc/23 (IRBM) Pt I | Approval of GADs of Bridges for the lines executed by RVNL | 17-05-2013 | Click Here |
99 | 2012/CE-III/BR/Estimates/5/ECR | Sanction of Detailed estimates | 01-04-2013 | Click Here |
100 | ACS No.25 for para no.311 of IRBM | Advance Correction Slip No.25 dated 17.12.2012 | 17-12-2012 | Click Here |
101 | 2011/CE-I/BR/Monsoon/NR | Bridge with Well/Pile foundations- Fixing of Safe Scour Depth | 30-08-2011 | Click Here |
102 | 2009/CE-I/BR/Safety(MR) | Road Under Bridges (RUBs)-Provision of covers to prevent falling of waste/garbage on road users | 13-12-2010 | Click Here |
103 | 2008/CE-I/BR/PCE Conf | Provision of Man Refuge on through open web girder bridges | 21-09-2010 | Click Here |
104 | 2007/CE-I/BR-III/3 | Para 4.2 ofIRS - Bridge Substructure and Foundation Code -regarding Estimation of Design Discharge (Q) | 07-06-2010 | Click Here |
105 | 2009/CE-I/BR/Safety (MR) | Pathways on long girder bridges | 08-12-2009 | Click Here |
106 | 2002/CE-I/BR-III/11 (RDSO) | Fabrication inspection of steel bridges girders | 07-12-2009 | Click Here |
107 | ACS No.119 if IRPWM | Advance Correction Slip No.119 to the Indian Railways Permanent Way Manual | 18-08-2009 | Click Here |
108 | 2005/CE-I/BR-II/8 | Adoption of steel superstructure of bridges for spans more than 24.4m | 28-05-2009 | Click Here |
109 | No.TCR/1394/2007/2 | Running of freight trains in 25 tonne axle load route | 05-12-2007 | Click Here |
110 | 90/CE-II/BR-1/57 | Replacement of small span steel girders with RCC/Composite/PSC Slabs’ girders | 12-03-2003 | Click Here |
111 | 91/CE-1/MT/4 | Minutes of CBEs Conference held on 06.05.1991 at Lucknow | 14-06-1991 | Click Here |
112 | D.O.lr.No.90/CE-1/BR-1/64 | Monthly Progress Report of B&S Directorate of RDSO. | 21-12-1990 | Click Here |
113 | 87/W1/BR-1/5 | Reference to RDSO. | 21-07-1987 | Click Here |