ZCETI/KCG- ANNUALCALENDAR OF TRAINING COURSES FOR THE YEAR 2019
| Sl.No. | | Name of the Course | Course No | From | To | For Category | SC | BZA | GTL | HYB | GNT | NED | HQ | CAO | Total |
| 1 | Works | Induction | 1/App.JE/Works/18 | 17/11/18 | 01/05/19 | App.JE/Works | | | | | | | | | 1 |
| 2 | Works | Induction | 1/App.SSE/Works(E.Co) | 19/11/18 | 18/04/19 | App.SSE/Works | | | | | | | | | 3 |
| 3 | Works | Induction | 1/App.JE/Works(E.Co) | 19/11/18 | 18/05/19 | App.JE/Works | | | | | | | | | 4 |
| 4 | P.Way | Promotional | 1/PC/Sup to JE/P.Way/19 | 03/01/19 | 02/03/19 | Sr.Sup to JE/P.Way | 2 | 3 | 2 | 0 | 0 | 0 | 0 | 0 | 7 |
| 5 | P.Way | Safety at Work site | 1/Spl/P.Way | 02/01/19 | 05/01/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 6 | P.Way | Safety at Work site | 2/Spl/P.Way | 08/01/19 | 12/01/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 7 | Works | Concrete Technology | 1/Spl/Works | 08/01/19 | 12/01/19 | SSE/JE/Works | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 8 | Bridges | Insp. & Maint. of Bridges | 1/Spl/Bridges | 08/01/19 | 12/01/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 9 | P.Way | Promotional | 1/PC/JE to SSE/P.Way | 21/01/19 | 15/03/19 | JE to SSE/P.Way | 11 | 11 | 4 | 2 | 1 | 2 | 0 | 0 | 31 |
| 10 | Works | Insp. & Maint. of Buildings | 2/Spl/Works | 21/01/19 | 25/01/19 | SSE/JE/Works | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 11 | Bridges | Insp. & Maint. of Bridges | 2/Spl/Bridges | 28/01/19 | 31/01/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 12 | P.Way | Induction | 1/App.SSE/P.Way/18 | 01/02/18 | 02/04/19 | App.SSE/P.Way | | | | | | | | | 1 |
| 13 | P.Way | Induction | 1/App.JE/P.Way/18 | 01/02/18 | 02/04/19 | App.JE/P.Way | | | | | | | | | 2 |
| 14 | P.Way | Induction | 2/App.JE/P.Way/18 | 01/02/18 | 15/03/19 | App.JE/P.Way | | | | | | | | | 3 |
| 15 | Drg | Refresher (Drg) | 1/RC/Drg/19 | 04/02/19 | 16/02/19 | SSE/JE/Drg | 5 | 2 | 1 | 2 | 2 | 2 | 8 | 1 | 23 |
| 16 | Bridges | Insp. & Maint. of Bridges | 3/Spl/Bridges | 05/02/19 | 09/02/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 17 | Bridges | Refresher(Bridges) | 1/RC/Bridges/19 | 18/02/19 | 11/03/19 | SSE/JE/Bridges | 1 | 1 | 2 | 0 | 0 | 1 | 0 | 0 | 5 |
| 18 | Works | Earthwork & Soil Mechanics | 3/Spl/Works | 19/02/19 | 23/02/19 | SSE/JE/Works | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 19 | P.Way | Safety at Work site | 3/Spl/P.Way | 25/02/19 | 28/02/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 20 | P.Way | Promotional | 2/PC/JE to SSE/P.Way | 18/03/19 | 11/05/19 | JE to SSE/P.Way | 12 | 10 | 3 | 2 | 0 | 2 | 0 | 0 | 29 |
| 21 | Drg | Refresher (Drg) | 2/RC/Drg/19 | 11/03/19 | 23/03/19 | SSE/JE/Drg | 5 | 2 | 1 | 1 | 2 | 1 | 8 | 1 | 21 |
| 22 | Works | Water Supply and Sanitation | 4/Spl/Works | 12/03/19 | 16/03/19 | SSE/JE/Works | 4 | 4 | 4 | 2 | 2 | 2 | 1 | 1 | 20 |
| 23 | P.Way | Safety at Work site | 4/Spl/P.Way | 26/03/19 | 30/03/19 | SSE/JE/P.Way | 4 | 4 | 4 | 2 | 2 | 2 | 1 | 1 | 20 |
| 24 | Drg | Refresher (Drg) | 3/RC/Drg/19 | 02/04/19 | 16/04/19 | SSE/JE/Drg | 5 | 1 | 2 | 1 | 1 | 1 | 8 | 1 | 20 |
| 25 | Bridges | Refresher(Bridges) | 2/RC/Bridges/19 | 02/04/19 | 24/04/19 | SSE/JE/Bridges | 0 | 0 | 2 | 0 | 0 | 1 | 1 | 0 | 4 |
| Sl.No. | | Name of the Course | Course No | From | To | For Category | SC | BZA | GTL | HYB | GNT | NED | HQ | CAO | Total |
| 26 | Works | Land Management | 5/Spl/Works | 08/04/19 | 12/04/19 | SSE/JE/Works | 4 | 4 | 4 | 2 | 2 | 2 | 1 | 1 | 20 |
| 27 | P.Way | Maint of LWR | 5/Spl/P.Way | 15/4/19 | 18/04/19 | SSE/JE/P.Way | 4 | 4 | 4 | 2 | 2 | 2 | 1 | 1 | 20 |
| 28 | P.Way | Refresher (P.Way) | 1/RC/P.Way/19 | 01/05/19 | 14/05/19 | SSE/JE/P.Way | 7 | 4 | 4 | 3 | 1 | 2 | 2 | 2 | 25 |
| 29 | Drg | Refresher (Drg) | 4/RC/Drg/19 | 01/05/19 | 14/05/19 | SSE/JE/Drg | 4 | 1 | 2 | 1 | 1 | 1 | 8 | 0 | 18 |
| 30 | P.Way | Refresher (P.Way) | 2/RC/P.Way/19 | 16/05/19 | 29/05/19 | SSE/JE/P.Way | 6 | 4 | 4 | 3 | 1 | 2 | 1 | 2 | 23 |
| 31 | Works | Refresher (Works) | 1/RC/Works | 16/05/19 | 29/05/19 | SSE/JE/Works | 4 | 4 | 3 | 3 | 1 | 2 | 2 | 11 | 30 |
| 32 | P.Way | TMS | 6/Spl/P.Way/19 | 30/05/19 | 31/05/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 33 | P.Way | Refresher (P.Way) | 3/RC/P.Way/19 | 04/06/19 | 18/06/19 | SSE/JE/P.Way | 6 | 3 | 4 | 2 | 0 | 2 | 1 | 2 | 22 |
| 34 | Drg | Refresher (Drg) | 5/RC/Drg/19 | 03/06/19 | 17/06/19 | SSE/JE/Drg | 4 | 1 | 1 | 1 | 1 | 1 | 8 | 0 | 17 |
| 35 | P.Way | Refresher (P.Way) | 4/RC/P.Way/19 | 19/06/19 | 02/07/19 | SSE/JE/P.Way | 6 | 3 | 4 | 2 | 0 | 2 | 0 | 2 | 22 |
| 36 | P.Way | Maint. Of LWR | 7/Spl/P.Way | 03/07/19 | 06/07/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 37 | Works | Refresher (Works) | 2/RC/Works | 08/07/19 | 20/07/19 | SSE/JE/Works | 4 | 4 | 3 | 3 | 1 | 2 | 2 | 11 | 30 |
| 38 | P.Way | Refresher (P.Way) | 5/RC/P.Way/19 | 08/07/19 | 20/07/19 | SSE/JE/P.Way | 6 | 3 | 4 | 2 | 0 | 2 | 0 | 2 | 17 |
| 39 | P.Way | Refresher (P.Way) | 6/RC/P.Way/19 | 22/07/19 | 03/08/19 | SSE/JE/P.Way | 6 | 3 | 3 | 1 | 0 | 2 | 0 | 2 | 10 |
| 40 | Works | Refresher (Works) | 3/RC/Works | 22/07/19 | 03/08/19 | SSE/JE/Works | 4 | 4 | 3 | 2 | 1 | 2 | 2 | 11 | 29 |
| 41 | Works | Refresher (Works) | 4/RC/Works | 05/08/19 | 20/8/19 | SSE/JE/Works | 4 | 3 | 3 | 2 | 1 | 2 | 1 | 11 | 27 |
| 42 | P.Way | Mechanised Maint. Of Track | 8/Spl/P.Way | 06/08/19 | 10/08/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 43 | Bridges | Fabrication & Erection of Girders | 4/Spl/Bridges/19 | 06/08/19 | 10/08/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 44 | Works | Refresher (Works) | 5/RC/Works | 22/08/19 | 05/09/19 | SSE/JE/Works | 4 | 3 | 3 | 2 | 1 | 1 | 1 | 10 | 26 |
| 45 | P.Way | TMS | 9/Spl/P.Way/19 | 13/08/19 | 14/09/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 46 | P.Way | Track Maintenance (Feedback and suggestions | 10/Spl/P.Way | 16/08/19 | 17/09/19 | SSE/JE/P.Way (Completed 29 Years) | | | | | | | | | 40 |
| 47 | P.Way | Mechanised Maint. Of Track | 11/Spl/P.Way | 20/08/19 | 24/09/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 48 | Bridges | Fabrication & Erection of Girders | 5/Spl/Bridges/19 | 20/08/19 | 24/09/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 49 | P.Way | Maint. Of Curves | 12/Spl/P.Way | 27/08/19 | 31/08/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| Sl.No. | | Name of the Course | Course No | From | To | For Category | SC | BZA | GTL | HYB | GNT | NED | HQ | CAO | Total |
| 50 | Bridges | Fabrication & Erection of Girders | 6/Spl/Bridges/19 | 27/08/19 | 31/08/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 51 | P.Way | Maint. Of Curves | 13/Spl/P.Way | 04/09/19 | 07/09/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 52 | Bridges | Under water Inspection | 7/Spl/Bridges/19 | 04/09/19 | 07/09/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 53 | Works | Refresher (Works) | 6/RC/Works | 11/09/19 | 24/09/19 | SSE/JE/Works | 4 | 3 | 3 | 2 | 1 | 1 | 1 | 10 | 25 |
| 54 | P.Way | Maint. Of Curves | 14/Spl/P.Way | 11/09/19 | 14/09/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 55 | Bridges | Under water Inspection | 8/Spl/Bridges/19 | 11/09/19 | 14/09/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 56 | P.Way | Layout Calculations | 15/Spl/P.Way | 17/09/19 | 21/09/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 57 | Bridges | Under water Inspection | 9/Spl/Bridges/19 | 17/09/19 | 21/09/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 58 | P.Way | Layout Calculations | 16/Spl/P.Way | 24/09/19 | 28/09/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 59 | P.Way | Safety at Work site | 17/Spl/P.Way | 03/10/19 | 05/10/19 | Contractors | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 60 | P.Way | Safety at Work site | 18/Spl/P.Way | 10/10/19 | 12/10/19 | Contractors | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 61 | Bridges | Under water Inspection | 10/Spl/Bridges/19 | 15/10/19 | 19/10/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 62 | Works | Refresher (Works) | 7/RC/Works | 14/10/19 | 26/10/19 | SSE/JE/Works | 4 | 3 | 3 | 2 | 0 | 1 | 1 | 10 | 24 |
| 63 | Works | Refresher (Works) | 8/RC/Works | 28/10/19 | 09/11/19 | SSE/JE/Works | 4 | 2 | 2 | 2 | 0 | 1 | 1 | 10 | 22 |
| 64 | Bridges | Insp. & Maint. of Bridges | 10/Spl/Bridges/19 | 28/10/19 | 31/10/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 65 | Works | Induction | 1/App.JE/Works/18 | 01/11/19 | 16/11/19 | App.JE/Works | | | | | | | | | 1 |
| 66 | P.Way | USFD | 19/Spl/P.Way | 05/11/19 | 09/11/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 67 | P.Way | Contract Management | 20/Spl/P.Way | 12/11/19 | 16/11/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 68 | Bridges | Contract Management | 11/Spl/Bridges/19 | 12/11/19 | 16/11/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 69 | Works | Contract Management | 6/Spl/Works/19 | 12/11/19 | 16/11/19 | SSE/JE/Works | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 70 | P.Way | Contract Management | 21/Spl/P.Way | 19/11/19 | 23/11/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 71 | Bridges | Contract Management | 12/Spl/Bridges/19 | 19/11/19 | 23/11/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 72 | Works | Contract Management | 7/Spl/Works/19 | 19/11/19 | 23/11/19 | SSE/JE/Works | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 73 | P.Way | Contract Management | 22/Spl/P.Way | 26/11/19 | 30/11/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 74 | Bridges | Contract Management | 13/Spl/Bridges/19 | 26/11/19 | 30/11/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 75 | Works | Contract Management | 8/Spl/Works/19 | 26/11/19 | 30/11/19 | SSE/JE/Works | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 76 | Bridges | Insp. & Maint. of Bridges | 14/Spl/Bridges/19 | 03/12/19 | 07/12/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| Sl.No. | | Name of the Course | Course No | From | To | For Category | SC | BZA | GTL | HYB | GNT | NED | HQ | CAO | Total |
| 77 | P.Way | Land Management | 23/Spl/P.Way | 03/12/19 | 07/12/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 78 | Works | Land Management | 9/Spl/Works/19 | 03/12/19 | 07/12/19 | SSE/JE/Works | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 79 | Bridges | Under water Inspection | 15/Spl/Bridges/19 | 10/12/19 | 14/12/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 80 | P.Way | Land Management | 24/Spl/P.Way | 10/12/19 | 14/12/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 81 | Works | Land Management | 10/Spl/Works/19 | 10/12/19 | 14/12/19 | SSE/JE/Works | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 82 | P.Way | Safety at Work site | 25/Spl/P.Way | 17/12/19 | 21/12/19 | SSE/JE/P.Way | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |
| 83 | Bridges | Fabrication & Erection of Girders | 16/Spl/Bridges/19 | 17/12/19 | 21/12/19 | SSE/JE/Bridges | 2 | 3 | 2 | 1 | 1 | 1 | 1 | 0 | 11 |
| 84 | Works | Earthwork & Soil Mechanics | 11/Spl/Works/19 | 17/12/19 | 21/12/19 | SSE/JE/Works | 5 | 5 | 5 | 3 | 2 | 2 | 1 | 2 | 25 |