PARAMETER | | 2019-20 | 2020-21 | Imp/ Det |
AVERAGE HOLDING | -- | 216 | 206 | -- |
GOODS OUTAGE | TARGET | 128.75 | 134.01 | |
ACTUAL | 129.72 | 143.10 | 10.00 % |
MAN POWER PER LOCO | -- | 2.84 | 2.89 | -- |
INEFFECTIVE | TARGET | 5.00 | 6.00 | |
ACTUAL | 5.89 | 6.76 | -13.00 % |
LUBE TO FUEL RATIO | TARGET | 1.30 | 1.20 | |
ACTUAL | 1.30 | 1.19 | 9.00 % |
SFC GOODS | TARGET | 1.50 | 1.50 | |
ACTUAL | 2.02 | 1.71 | 15.00 % |
SFC PASSENGER | TARGET | 2.80 | 2.80 | |
ACTUAL | 3.61 | 3.36 | 7.00 % |
KPI FALURES | TARGET | 99 | 78 | |
ACTUAL | 103 | 42 | 60.00 % |
PUNCTUALITYFAILURES | TARGET | 4.00 | 4.00 | |
ACTUAL | 3.70 | 0 | 100.00 % |
Ferrous (in MTs) | TARGET | 300 | 300 | |
ACTUAL | 286 | 395 | 37.00 % |
Non-Ferrous (in MTs) | TARGET | 20 | 50 | |
ACTUAL | 21 | 60 | 100.00 % |
Maintenance Cost/Loco | -- | 372 | 310 | 17.00 % |
ELECTRICAL LOCO MAINTENANCE
ØDiesel Loco Shed, Gooty is the first Diesel Shed in SCR to maintain Electric & Diesel Locomotive.
ØThis Shed homing 30 WAG9H Locomotives.
ØThe first three phase WAG9H type Electrical locomotive 31764 IT scheduled on 17.10.2018.
ØFirst IA Schedule of Three Phase WAG9H type Electrical Locomotives started from 02/03/2019
ØFirst IC schedule started on 23.12.2019.