Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

Citizen Charter

Trains & Timings

Passenger Services / Freight Information

Public Information

Tenders

Contact Us

About Us
   Divisions
      Guntakal
         DEPARTMENTS
            ELECTRICAL
               General Maintenance
                  About us


 
Bookmark Mail this page Print this page
QUICK LINKS
About us

Infrastructure - at a Glance

Electrical General services is headed by Senior Divisional Electrical Engineer (Maintenance) and assisted by Assistant Divisional Electrical Engineer (Maintenance), Guntakal and Assistant Divisional Electrical Engineer (Maintenance), Tirupati for looking after Power maintenance, Train lighting and Air conditioning.

There are 12 power maintenance depots and 3 coaching depots located in Guntakal division. Raichur, Adoni, Guntakal, Gooty, Dhone, Proddatur, Kadapa, Nandalur, Dharmavaram, Pakala, Renigunta and Tirupati. To looking after maintenance of coaching & power equipments / Installations at 155 stations over the division.

·Total no. of Electrified stations

:

155

·No. of  HT supply points

:

33

·No. of  LT supply points

:

465

·11KV /440V Sub-stations

:

48

·Total connected load  In Kw

:

34530.63

·Average Energy consumption 

:

22.40 MU per annum

·No. of DG sets

:

52

·LC gates electrified

:

224

·Staff Quarters

:

4822

·Escalators

:

6

·Lifts at stations

:

14

·Power line crossings

:

485

·Pumping installations

:

372

·High masts

:

111

·UPS at PRS/UTS

:

132

·No. of CLS panels

:

210

·No. of AC plants

:

789

·Water coolers served

:

111

·Solar water heaters in LPD

:

27300

·Natural light pipe system

:

20

·Solar plants installed in Kwp

:

1073

·Coach holding

:

AC coaches: 154

Non-AC coaches: 544




















Guntakal Div. - Electrical Energy consumption trend in MU


Division achieved Energy savings in MU w r t last year

         ·Rly. Brd target (less) -5.0% w.r.t last year i.e.2019-2

·Energy consumed during 2019-20: 22.498 MU

·Energy consumed during 2020-21: 16.926 MU

                          ·Division Achieved target: (Less) -24.77%






Source : South Central Railway CMS Team Last Reviewed : 19-06-2021  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.