Screen Reader Access Skip to Main Content Font Size   Increase Font size Normal Font Decrease Font size
Indian Railway main logo
Search :
Find us on Facebook   Find us on Twitter Find us on Youtube View Content in Hindi
National Emblem of India

About Us

Citizen Charter

Trains & Timings

Passenger Services / Freight Information

Public Information

Tenders

Contact Us

About Us
   Divisions
      Guntur
         Electrical
            Electrical Traction Distribution


 
Bookmark Mail this page Print this page
QUICK LINKS
Electrical Traction Distribution

ELECTRICAL TRACTION DISTRIBUTION ORGANISATION

OF GUNTUR DIVISION

 

 

INTRODUCTION:

 

First electrification work in Guntur division was completed in KCC-GNT-TEL section in the year 1989, which was in BZA division at that time. Later, other sections vizGNT-NLPD DN LINE, GNT-MAG DN LINE, MAG-KCC DN lineetc were commissioned in different phases. Further, NLPD – NDL & NLPD – PGDP section including VNUP-JNPD & NDKD-MCLA sections electrification works carried out by RE organization. Commercial operations with electric traction started in NLPD-NDL section o­n 29.03.2018 and in NLPD-PGDP section o­n 01.09.2019. In TEL-RAL section, Electrification works are under progress.

 

The total electrified section of the division is now expanded to 868.8TKM against 122.7 TKM during April 2017. 25KV single phase power supply for electric traction is derived from 8 Traction Sub-stations located “en-route” at NLPD, SYM, GJJ, YADA, NDL, SAP, MRGA& RMNP. APTRANSCO & TSTRANSCO are supplying power at 132KV from their grid to respective Traction Sub-stations located in the states of Andhra Pradesh &Telangana.

 

Section commissioning details:

Previously electrified section:

S. No

Section

Comm. Dt.

RKM

TKM

1

KCC-GNT-TEL

06.05.1989

59.5

122.7

2

REP YARD

01.08.1989

3

GNT-NLPD YARD

31.01.1992

4

NLPD BALLAST SDG

27.12.1996

5

GNT-NLPD DN LINE

29.03.1999

6

GNT-MAG DN LINE

28.12.2007

7

MAG-KCC DN line

06.09.2009

 

 

 

 

 

 

 

 

 

Newly electrified section:

 

Sl. No

Section

Date of CRS

authorization

Initial coaching

train ran o­n

RKM

TKM

1

NLPD-CBM

16.05.2017

24.05.2017

164.48

200.48

2

CBM-DMT

14.08.2017

22.09.2017

45.20

55.60

3

DMT-NDL

10.03.2018

29.03.2018

45.67

56.17

4

NLPD-SRPM

20.03.2018

31.05.2018

17.5

22.9

5

SRPM-TMLU

09.08.2018

25.10.2018

60.72

78.776

6

PGDP-NLDA

22.12.2018

19.03.2019

74.3

93.3

7

TMLU-VNUP

07.03.2019

03.06.2019

29.6

41.9

8

TEL-GNT

(SECOND LINE)

16.03.2019

25.04.2019

-

34.61

9

NDL-YA line

02.03.2019

13.03.2019

2.32

2.32

10

NLDA-KADM

27.03.2019

23.06.2019

28

36.8

11

KADM-VNUP

04.06.2019

01.09.2019

28.6

36.5

12

NDKD-MCLA

05.09.2019

18.12.2019

34.30

34.90

13

JNPD-VNUP

31.01.2019 (EIG)

06.03.2019 (Charged)

8

8

14

VNUP yard

31.01.2019 (EIG)

06.03.2019 (Charged)

1.850

6.636

15

RE line at REP

17.01.2020 (EIG)

21.01.2020 (Charged)

-

0.6435

16

REP shunting neck

07.05.2020 (EIG)

14.05.2020 (Charged)

-

0.6165

17

PRCA-STUR Double line

04.02.2020

04.02.2020

-

32.247

18

PIDU yard

04.03.2020

10.03.2020

-

3.75

 

Total RKM = 600.04

Total TKM = 868.849

 

Function:

Maintenance of Traction Power Supply installations, Over Head Equipment, Supervisory Control And Data Acquisition systems etc in Guntur division and ensures uninterrupted power supply to traction services for movement of trains.

Statistical information:

1

TRD Depots

5

GNT, MRK, GID, NDL & MRGA

2

Remote Control

1

GNT

3

Supervisory Remote Control

1

GNT

4

Traction Sub-Stations

8

NLPD, SYM, GJJ, YADA, NDL, SAP, MRGA & RMNP

 

Sectioning & Paralleling Posts

12

PDKN, AKU, STUR, GKM, CBM, CMZ, BDPL, PGRL, PDGL, RYGA, BMMP, JNPD

 

Sub Sectioning & paralleling Posts

31

MAG, GNT, VJA, PPM, NDPU, MUK, SAB, VKN, POO, MRK, TLU, JBK, SDV, DMT, CMZ, GZA, NDL, SRPM, PKPU, REM, BMKD, TMLU, NDKD, VNUP, KDGL, KADM, TPPI, SRMR, CTYL, VLG, NRDP

 

Tower cars

8-Wheeler

4-Wheeler

 

5

1

 

GNT (2), MRK (1), NDL (1) & MRGA (1)

GNT (1)


Organization:

Sr.DEE/TR/GNT:B. SRINIVASU

ADEE/TRD/MRGA:B. VENKATESH

ADEE/TRD/MRK:L. SRNIVASARAO

  • The Organization is headed by Sr.DEE, and assisted by sub-divisional Officers at Miryalaguda&Markapuram. The division consists of 5 TRD depots. The TRD depots carry-out preventive maintenance of the traction installations i.e. the wires over the track from which the Locomotive pantograph draws the current&maintain the Railway traction sub-stations which feed the OHE with 25KV A.C. Power.
  • The PSI and OHE activities are monitored by the Traction Power Controller (TPC), who monitors the voltages of the system and advises the Section Traffic Controller to regulate trains when there is bunching of trains leading to low voltage and stalling of trains.
  • The equipment at traction sub-stations and switching stations is controlled remotely by TPC.

MODEL OHE at TRD depots

ØModel OHE of 130 mtrs erected at Skill Development Center, NLPD for GNT depot duly incorporating Section Insulator, Arthur Flurry Make PTFE, IOL, Turn Out, Platform Mast, Isolator etc. Developed PSI test bench to train the staff regarding testing and maintenance of PSI equipment. OHE & PSI model rooms are developed for imparting training to staff o­n OHE & PSI.OHE & PSI boards were provided to impart training to staff at skill development centre/NLPD.