ELECTRICAL GENERAL SERVICES
Organization structure
Headed by Sr. DEE/M/HYB and Assisted by ADEE/I/M & ADEE/III/M

Electrical (GS) branch is responsible for electrical maintenance of 5084 quarters with prominent service buildings and water pumping requirement at Hyderabad area. In addition to it the maintenance of electrical portion of 410 TL, 86 AC coaches based at KCG depot and Electrical System Training Centre (ESTC) is also under Electrical (GS) organization. Branch is headed by One JAG officer and assisted by Two ADEEs.
Role of SSE/Electrical Maintenance:
SSE/EM is responsible for electrical maintenance of all the electrical assets like HT/LT substations, stations, Hospitals, LC gates, yards, Loco Sheds, Goods yards, training institutes and staff quarters. He is also responsible ensuring of uninterrupted power supply to the users in his jurisdiction.
Role of SSE/Domestic Air Conditioning:
SSE/AC is responsible for maintenance and ensuring working of all the Domestic AC units, Water coolers and Refrigerators in service buildings and stations over the division.
Role of SSE/Pumps:
SSE/Pumps is responsible for maintenance and ensuring functioning of all the Pumping installations and DG sets in service buildings, LC gates, stations, training institutes, staff quarters, loco sheds and yards over the division.
Role of SSE/Train Lighting:
SSE/Train Lighting is responsible for maintenance and ensuring working of electrical assets like lighting equipment, Fans and mobile charging sockets, Passenger announcement system etc. in in all Non-AC coaches of primary and secondary maintained trains and passed through trains.
Role of SSE/Air Conditioning:
SSE/AC is responsible for maintenance and ensuring working of electrical assets like AC equipment, lighting equipment, Fans and mobile charging sockets, Passenger announcement system etc. in in all AC coaches of primary and secondary maintained trains and passed through trains.
Connected Load and Consumption Pattern:
Financial Year | Consumption from Utility (kWh) | Solar Generation(kWh) | Total Consumption in (kWh) | Connected Load (kW) | SEC (kWh/kW) |
2018-19 | 23909954 | 1838294 | 25748248 | 31518 | 817 |
2019-20 | 23137171 | 2453255 | 25590426 | 33171 | 771 |
2020-21 (Up to July-20) | 6993222 | 899129 | 7892351 | 33261 | 237 |

Details of Solar Plants Commissioned over the Division
Under PPA Mode (Renew) | |
Sl. No. | Name of the Location | Capacity in KW | |
|
1 | Kacheguda Railway Station | 400 | |
2 | Other Locations | 1160 | |
| Total | 1560 | |
Under PPA Mode(AZURE) | |
1 | GWD Railway Station | 70 | |
2 | JADCHERLA Railway Station | 30 | |
| Total | 100 | |
DEPARTMENTAL | |
1 | Rail Nirman Nilayam | 35 | |
2 | Rail Nilayam | 140 | |
3 | Other Locations | 93.4 | |
| Total | 268.4 | |
Grand Total | 1928.40 | |
vAchievements during the financial year 2019-20
- Achieved overall reduction in energy consumption by 3.23% as against Railway Board target of 5% despite the increase of connected load of about 1.65MW by providing ACs for JS/SS officers and Running rooms compared to last year.
- Achieved 8% improvement in overall in SEC compared to last year.
- Provided 2149 Nos. of BLDC fans in place of conventional non-star rated ceiling fans.
- Provided 163 Nos. of 5 star rated inverter type AC units in place of non-star rated ACs.
- Provided 360Nos. of occupancy sensors for light and fan control in officer’s chambers, conference halls, waiting halls, concourse area and SSE/JEs offices.
- Provided 45Nos. of energy savers for AC units.
- Provided 35Nos. of energy efficient pumps in place of less efficient pumps.
- Provided 30Nos. of VVVF drives for various applications like lifts, compressors and pumps.
- Provided natural daylight pipe system in Substation, IOH shed, Pump house/KCG and DLS/MLY.
- Provided smart metering at 43 staff quarters at BSX and DAB.
- Commissioned 100kWp solar plants on the COP on PF of JCL (30kWp) and GWD(70kWp) Railway Stations, through Power Purchase Agreement (PPA) @ Rs.4.84/- per unit (kWh) on Design, Build, Finance, Operate and Transfer (DBFOT) basis with the objective of Generating and supplying Renewable Energy to Railway Installations.
- Provided integrated solar roof of 5.7kWp at KMC booking office at second entry side.
- Commissioned 04 lifts at Central Hospital/LGD – 01, RN – 02, IRISET – 01.
Awards:
I.National Energy Conversation Awards:
S. No | Year | Name of the Location | Category | Prize |
1 | 2018 | Rail Nilayam | Office Building | Certificate of Merit |
2 | Hyderabad Bhavan | Office Building | Certificate of Merit |
3 | Nizamabad Railway Station | Railway Stations | Certificate of Merit |
4 | 2019 | Lekha Bhavan | Office Building | 1st Prize |
5 | 2019 | Kacheguda Heritage Building | Office Building | Certificate of Merit |
II.CII - National Award for Excellence in Energy Management
S. No | Year | Name of the Location | Category | Prize |
1 | 2019 | Rail Nilayam | Building Sector | Excellent Energy Efficient Unit |
2 | Lekha Bhavan | Building Sector | Energy Efficient Unit |
3 | 2020 | Kacheguda Station Heritage Building | Building Sector | Excellent Energy Efficient Unit |
4 | Rail Nilayam | Building Sector | Energy Efficient Unit |
5 | Lekha Bhavan | Building Sector | Energy Efficient Unit |
MAJOR ASSETS MAINTAINED BY ELECTRICAL GENERAL SERVICES
S.No. | Description | Total | |
|
1 |
|