inner-banner-img

our-department


ENGINEERING


 

      Back

SrNo

System Improvement Issued

Dept

Issued Date

1

Providing thicker Tactile flooring at stations with parcel handling operations

ENGG

09.01.2026

2

     
3      
4    

 

 

 

 

 

 

SrNo

System Improvement Issued

Dept

Issued Date

1

Guidelines and mandatory frequency and procedure for weld testing

ENGG

22.08.2025

2

Standard drawing for water hydrant pipe line works ENGG 03.11.2025
3 Regarding working of USFD testing of rails   ENGG 13.11.2025
4



5
Conditions in Outcome based contract  

Inclusion of new item_HSFG bolting assemblies with DTI washer in approved list of brands_makes for materials
ENGG

26.11.2025

 

18.09.2025

 

SrNo

System Improvement Issued

Issued Date

1

Provision of Retaining walls in RUB approach

05.02.2024

2

Submission of documents by Tenderers

06.03.2024

3

Submission of Bid security by Tenderer in the form of BG.

31.05.2024

4

Provision of filter media behind boulder below stone pitching.

01.08.2024

5

Regarding arriving weights in Structural steel works.

05.08.2024

 

 

            

Sr

Subject of System Improvement 

Issued Date

1.

Accountal of Class-II released materials from CPOH/RYP

13.04.2023

2.

Inclusion of items for lab tests in contract agreements

03.04.2023

3.

Non-induction in COE quantity for used cut spoils obtained from cuttings/foundations

03.04.2023

4.

Penalty towards non-establishment of site laboratory, pre-requisites with respect to plans  and drawings for tender calling and incorporation of detailed calculations

12.01.2023

 

 

SrNo

Subject of System Improvement 

Issued  Date

17

16

Modifications -specifications of Pitching

Uploading of Non-RDSO Drawings of Construction Organization

24.11.2022

23.08.2022

15

14

Special Conditions in Safety related Track works

Test Checks in Quality control of works

 

18.08.2022

11.08.2022

13

Revision of rates for Anti-Corrosive Painting of Rails

25.04.2022

12

Test checks to be carried out in Track machine Organization

19.04.2022

11

Incorporation of Spl. condition for approval of Concrete mix design

23.03.2022

10

Optimisation of Cement Content in mix designs.

09.02.2022

9

Painting of Rails in Openline and construction projects

29.03.2022

8

Usage of steel in Construction Projects

23.03.2022

7

Drawing for Platform wall with precast RCC, Stone masonry and brick masonry

17.03.2022

6

Drawing for Passenger Platform with vaccum Dewatered concrete

17.03.2022

5

Implementation of Store Module in TMS

20.01.2022

4

Instructions on dealing with Contracts entered with USSOR-2010

17.01.2022

3

Specification of materials to be used for construction of platform wall, platform surface and its related cross sections

06.01.2022

2

Variations in Zonal Work orders

06.01.2022

1

Guidelines on purchase of Plant Items & Saplings

05.01.2022

 

SrNo

Subject of System Improvement

Issued Date

1

Penalty clause for non-establishment of Site Laboratory. 

28.12.2021 

2

Avoiding subjectivity in Tender Finalization

28.12.2021 

 

SrNo

Subject of System Improvement

Issued Date

1

Finalization of Works Tender in non-extension of validity of offer/withdrawal of offer by tenderer

26.08.2019 

 

   

                            

SrNo

Subject of System Improvement

Issued Date

1

Guidelines to Eligibility criteria for uniform incorporation in Tender documents of works Tenders in SCR

21.02.2018 

      

SrNo

Subject of System Improvement

Issued Date

1

Confirmation of Strength of bricks and operation of Deduction Item in execution of brick work 

17.01.2017 

          

SrNo

Subject of System Improvement

Issued Date

1

Testing of material at consignee end

26.10.2016 

               Back to System Improvements

Source : South Central Railway Last Reviewed : 31-05-2026